Sl No. | District
As per Census (2011)
|
Scheme SM Code | Scheme
Schemes for which Work Order has been issued as per PHED-MIS
|
Scheme Type
Type of Scheme as per PHED-MIS
|
Name of JE entrusted | SLSSC Date
Date of SLSSC in which the Scheme has been Approved
|
FHTC Involved
Approved FHTC Count Modified after the appropriation in YDU considered under the Schemes for which Work Order has been Issued as per PHED-MIS
|
Estimated Cost | AAFS Cost
Approved Implementation as mentioned in AAFS considered under the Schemes for which Work Order has been Issued as per PHED-MIS
|
Date of First Work Order
Total No. of Work Orders Issued under the Scheme as per PHED-MIS
|
No. of Work Orders Issued
Total No. of Work Orders Issued under the Scheme as per PHED-MIS
|
Work Value
Total Cost for all the Issued Work Order under the Scheme as per PHED-MIS
|
Payment
Total Payment made for these Work Orders as per PHED-MIS
|
Payment % | Physical Progress % |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
223 | 3,44,018 | 89,667.02 | 89,667.02 | # | 2,076 | 71,821.92 | 28,711.61 | # | # | ||||||
1 | ALIPURDUAR | SM/07057 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Jateswar Water Supply Scheme (Phase-1) | Retrofitting | RWS Falakata Block | 25/09/2020 | 2,066 | 99.09 | 99.09 | 08/09/2021 | 14 | 139.46 | 50.89 | 36.49 | 99 |
2 | ALIPURDUAR | SM/07058 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Bakla Piped Water Supply Scheme (Phase-2) | Retrofitting | RWS Alipurduar - II Block | 25/09/2020 | 1,036 | 82.69 | 82.69 | 22/11/2021 | 6 | 56.54 | 60.39 | 106.81 | 72 |
3 | ALIPURDUAR | SM/07059 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Chotosalkumar Piped Water Supply Scheme (Phase-1) | Retrofitting | RWS Falakata Block | 25/09/2020 | 967 | 97.58 | 97.58 | 19/01/2021 | 11 | 117.15 | 93.14 | 79.5 | 43 |
4 | ALIPURDUAR | SM/07060 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Patlakhawa Piped Water Supply Scheme (Phase-1) | Retrofitting | Birpara Sub Division | 25/09/2020 | 1,400 | 86.77 | 86.77 | 15/12/2020 | 9 | 65.01 | 85.11 | 130.92 | 98 |
5 | ALIPURDUAR | SM/07061 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Patlakhawa Piped Water Supply Scheme (Phase-2) | Retrofitting | Birpara Sub Division | 25/09/2020 | 1,581 | 93.85 | 93.85 | 15/12/2020 | 7 | 35.64 | 82.47 | 231.4 | 64 |
6 | ALIPURDUAR | SM/07062 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Uttar Kamakshyaguri Piped Water Supply Scheme (Phase-1) | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 2,826 | 87.86 | 87.86 | 24/01/2022 | 10 | 87.21 | 82.08 | 94.12 | 99 |
7 | ALIPURDUAR | SM/07063 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Salsalabari Piped Water Supply Scheme (Phase-2) | Retrofitting | RWS Alipurduar - II Block | 25/09/2020 | 1,709 | 91.90 | 91.90 | 25/02/2022 | 8 | 108.03 | 63.47 | 58.75 | 99 |
8 | ALIPURDUAR | SM/07064 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Hantupara Tea Garden Piped Water Supply Scheme | Retrofitting | Birpara Sub Division | 25/09/2020 | 1,612 | 99.04 | 99.04 | 26/03/2021 | 9 | 78.32 | 73.51 | 93.86 | 99 |
9 | ALIPURDUAR | SM/07065 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Kaijali Basty Piped Water Supply Scheme (Phase-2) | Retrofitting | RWS Alipurduar - II Block | 25/09/2020 | 596 | 73.85 | 73.85 | 13/05/2022 | 7 | 60.19 | 24.29 | 40.36 | 68 |
10 | ALIPURDUAR | SM/07066 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Lankapara Water Supply Scheme (Phase-2) | Retrofitting | Birpara Sub Division | 25/09/2020 | 2,682 | 80.75 | 80.75 | 25/01/2022 | 10 | 116.37 | 77.71 | 66.78 | 99 |
11 | ALIPURDUAR | SM/07067 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Radharani T.G Water Supply Scheme (Phase-1) | Retrofitting | RWS Kalchini Block | 25/09/2020 | 345 | 98.86 | 98.86 | 10/12/2021 | 10 | 129.34 | 88.90 | 68.73 | 99 |
12 | ALIPURDUAR | SM/07068 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Dimdima T.G Water Supply Scheme (Phase-1) | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 1,509 | 85.62 | 85.62 | 03/09/2020 | 8 | 88.77 | 65.85 | 74.18 | 81 |
13 | ALIPURDUAR | SM/07069 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Dimdima T.G Water Supply Scheme (Phase-2) | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 1,509 | 61.34 | 61.34 | 03/09/2020 | 5 | 58.30 | 28.13 | 48.25 | 99 |
14 | ALIPURDUAR | SM/07121 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Birpara (APD) Piped Water Supply Scheme (Phase-2) | Retrofitting | Birpara Sub Division | 25/09/2020 | 2,686 | 82.27 | 82.27 | 19/02/2021 | 7 | 73.31 | 72.24 | 98.54 | 99 |
15 | ALIPURDUAR | SM/07122 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-III, Phase-2) | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 1,051 | 98.68 | 98.68 | 25/02/2022 | 5 | 85.42 | 97.80 | 114.49 | 91 |
16 | ALIPURDUAR | SM/07123 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-III, Phase-1) | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 1,051 | 98.96 | 98.96 | 25/02/2022 | 10 | 87.39 | 86.58 | 99.07 | 91 |
17 | ALIPURDUAR | SM/07124 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Purba Chenpani Piped Water Supply Scheme (Phase-2) | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 1,477 | 55.28 | 55.28 | 15/12/2020 | 3 | 51.41 | 27.64 | 53.76 | 96 |
18 | ALIPURDUAR | SM/07125 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-II, Phase-2) | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 1,051 | 90.17 | 90.17 | 25/02/2022 | 5 | 102.55 | 0.00 | 0 | 91 |
19 | ALIPURDUAR | SM/07126 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-II, Phase-1) | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 1,051 | 93.00 | 93.00 | 25/02/2022 | 6 | 149.26 | 79.18 | 53.05 | 91 |
20 | ALIPURDUAR | SM/07127 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-I, Phase-2) | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 1,051 | 66.37 | 66.37 | 13/09/2021 | 8 | 95.80 | 33.19 | 34.65 | 99 |
21 | ALIPURDUAR | SM/07128 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Tapshikatha Piped Water Supply Scheme (Phase-2) | Retrofitting | Birpara Sub Division | 25/09/2020 | 895 | 62.07 | 62.07 | 03/09/2021 | 8 | 49.56 | 31.59 | 63.74 | 65 |
22 | ALIPURDUAR | SM/07129 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Jagijhora Barabak Piped Water Supply Scheme | Retrofitting | RWS Falakata Block | 25/09/2020 | 1,328 | 72.16 | 72.16 | 26/03/2021 | 6 | 61.29 | 55.12 | 89.93 | 56 |
23 | ALIPURDUAR | SM/07130 | FHTC under Jaldhara / Jalswapna including retrofitting of existing distribution system under DHUMCHIPARA T.G. Piped Water Supply Scheme | Retrofitting | Birpara Sub Division | 25/09/2020 | 1,568 | 94.15 | 94.15 | 31/03/2022 | 10 | 120.32 | 74.22 | 61.69 | 47 |
24 | ALIPURDUAR | SM/07131 | FHTC under Jaldhara / Jalswapna including retrofitting of existing distribution system under DHEKLAPARA T.G. Piped Water Supply Scheme | Retrofitting | Birpara Sub Division | 25/09/2020 | 567 | 73.16 | 73.16 | 08/09/2021 | 7 | 61.01 | 42.13 | 69.05 | 50 |
25 | ALIPURDUAR | SM/07132 | FHTC under Jaldhara / Jalswapna including retrofitting of existing distribution system under DALMORE RAMJHORA T.G. Piped Water Supply Scheme (Phase-2) | Retrofitting | Birpara Sub Division | 25/09/2020 | 1,847 | 88.70 | 88.70 | 22/09/2022 | 8 | 43.19 | 6.16 | 14.26 | 22 |
26 | ALIPURDUAR | SM/07133 | FHTC under Jaldhara / Jalswapna including retrofitting of existing distribution system under DALMORE RAMJHORA T.G. Piped Water Supply Scheme (Phase-1) | Retrofitting | Birpara Sub Division | 25/09/2020 | 1,169 | 95.65 | 95.65 | 08/09/2021 | 11 | 79.68 | 93.42 | 117.24 | 99 |
27 | ALIPURDUAR | SM/07134 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Purba Chenpani Piped Water Supply Scheme (Phase-1) | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 1,477 | 89.44 | 89.44 | 10/08/2022 | 3 | 61.37 | 33.48 | 54.55 | 98 |
28 | ALIPURDUAR | SM/07135 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Paschim Khairbari Piped Water Supply Scheme (Phase-1) | Retrofitting | Birpara Sub Division | 25/09/2020 | 822 | 87.03 | 87.03 | 14/10/2020 | 6 | 89.13 | 70.35 | 78.93 | 98 |
29 | ALIPURDUAR | SM/07136 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Paschim Khairbari Piped Water Supply Scheme (Phase-2) | Retrofitting | Birpara Sub Division | 25/09/2020 | 822 | 80.05 | 80.05 | 28/12/2020 | 5 | 77.51 | 57.13 | 73.71 | 87 |
30 | ALIPURDUAR | SM/07137 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Dalimpur Piped Water Supply Scheme (Phase-1) | Retrofitting | RWS Falakata Block | 25/09/2020 | 1,073 | 97.16 | 97.16 | 15/12/2020 | 10 | 132.87 | 66.14 | 49.78 | 99 |
31 | ALIPURDUAR | SM/07138 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Lankapara Piped Water Supply Scheme (Phase-1) | Retrofitting | Birpara Sub Division | 25/09/2020 | 2,682 | 96.46 | 96.46 | 12/11/2020 | 8 | 83.55 | 72.58 | 86.87 | 99 |
32 | ALIPURDUAR | SM/07174 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Bakla Piped Water Supply Scheme (Phase-1) | Retrofitting | RWS Alipurduar - II Block | 25/09/2020 | 1,388 | 76.33 | 76.33 | 24/02/2022 | 6 | 86.03 | 51.46 | 59.82 | 99 |
33 | ALIPURDUAR | SM/07175 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Birpara (APD) Piped Water Supply Scheme (Phase-1) | Retrofitting | Birpara Sub Division | 25/09/2020 | 2,686 | 91.69 | 91.69 | 19/02/2021 | 10 | 131.64 | 86.22 | 65.5 | 91 |
34 | ALIPURDUAR | SM/07176 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Chotosalkumar Piped Water Supply Scheme (Phase-2) | Retrofitting | RWS Falakata Block | 25/09/2020 | 1,621 | 70.54 | 70.54 | 19/01/2021 | 14 | 89.52 | 33.59 | 37.52 | 80 |
35 | ALIPURDUAR | SM/07177 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Salsalabari Piped Water Supply Scheme (Phase-1) | Retrofitting | RWS Alipurduar - II Block | 25/09/2020 | 761 | 68.96 | 68.96 | 26/03/2021 | 8 | 53.29 | 66.65 | 125.07 | 99 |
36 | ALIPURDUAR | SM/07178 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Munshipara Piped Water Supply Scheme (Phase-1) | Retrofitting | Birpara Sub Division | 25/09/2020 | 1,419 | 98.08 | 98.08 | 15/12/2020 | 10 | 101.54 | 91.98 | 90.58 | 72 |
37 | ALIPURDUAR | SM/07179 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Munshipara Piped Water Supply Scheme (Phase-2) | Retrofitting | Birpara Sub Division | 25/09/2020 | 1,419 | 69.14 | 69.14 | 15/12/2020 | 7 | 50.57 | 41.99 | 83.03 | 72 |
38 | ALIPURDUAR | SM/07180 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Totopara Piped Water Supply Scheme | Retrofitting | RWS Madarihat - Birpara Block | 25/09/2020 | 624 | 64.83 | 64.83 | 13/10/2020 | 4 | 7.76 | 11.34 | 146.13 | 42 |
39 | ALIPURDUAR | SM/07181 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Kaijali Basty Piped Water Supply Scheme (Phase-1) | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 571 | 89.66 | 89.66 | 16/10/2020 | 6 | 112.91 | 88.39 | 78.28 | 98 |
40 | ALIPURDUAR | SM/07182 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Loknathpur and Amp Adj. Mouza Piped Water Supply Scheme (Phase-1) | Retrofitting | RWS Alipurduar - II Block | 25/09/2020 | 870 | 98.81 | 98.81 | 13/12/2021 | 5 | 32.94 | 95.63 | 290.32 | 99 |
41 | ALIPURDUAR | SM/07183 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Loknathpur and Amp Adj. Mouza Piped Water Supply Scheme (Phase-2) | Retrofitting | RWS Alipurduar - II Block | 25/09/2020 | 870 | 56.02 | 56.02 | 24/01/2022 | 3 | 22.39 | 28.89 | 129.03 | 87 |
42 | ALIPURDUAR | SM/07184 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Jashodanga Piped Water Supply Scheme | Retrofitting | RWS Alipurduar - II Block | 25/09/2020 | 901 | 82.41 | 82.41 | 05/01/2021 | 8 | 134.82 | 64.27 | 47.67 | 98 |
43 | ALIPURDUAR | SM/07185 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Barobisa Piped Water Supply Scheme (Zone-1,Phase-1) | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 1,051 | 82.87 | 82.87 | 25/02/2022 | 11 | 77.71 | 77.65 | 99.92 | 96 |
44 | ALIPURDUAR | SM/07186 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Radharani T.G Piped Water Supply Scheme (Phase-2) | Retrofitting | RWS Kalchini Block | 25/09/2020 | 345 | 99.29 | 99.29 | 03/09/2021 | 14 | 106.98 | 80.34 | 75.1 | 99 |
45 | ALIPURDUAR | SM/07187 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Banchukamari Piped Water Supply Scheme (Phase-1) | Retrofitting | Birpara Sub Division | 25/09/2020 | 828 | 73.94 | 73.94 | 10/12/2021 | 9 | 78.74 | 56.02 | 71.15 | 75 |
46 | ALIPURDUAR | SM/07188 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Banchukamari Piped Water Supply Scheme (Phase-2) | Retrofitting | Birpara Sub Division | 25/09/2020 | 828 | 73.94 | 73.94 | 10/12/2021 | 4 | 50.08 | 51.99 | 103.81 | 75 |
47 | ALIPURDUAR | SM/07189 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Tapshikhata Piped Water Supply Scheme (Phase-1) | Retrofitting | Birpara Sub Division | 25/09/2020 | 895 | 97.67 | 97.67 | 03/09/2021 | 11 | 55.33 | 97.67 | 176.52 | 81 |
48 | ALIPURDUAR | SM/07190 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Paitkapara T.G Piped Water Supply Scheme | Retrofitting | Birpara Sub Division | 25/09/2020 | 1,026 | 83.82 | 83.82 | 03/09/2020 | 8 | 86.50 | 55.17 | 63.78 | 98 |
49 | ALIPURDUAR | SM/07191 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Dhaolajhora T.G Piped Water Supply Scheme | Retrofitting | RWS Alipurduar - II Block | 25/09/2020 | 788 | 62.80 | 62.80 | 28/03/2022 | 2 | 20.97 | 30.70 | 146.4 | 97 |
50 | ALIPURDUAR | SM/07192 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Madhu T.G Piped Water Supply Scheme | Retrofitting | Birpara Sub Division | 25/09/2020 | 1,000 | 83.76 | 83.76 | 08/09/2021 | 8 | 95.75 | 80.90 | 84.49 | 99 |
51 | ALIPURDUAR | SM/07193 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Jayanti Piped Water Supply Scheme | Retrofitting | Birpara Sub Division | 25/09/2020 | 608 | 60.86 | 60.86 | 26/03/2021 | 6 | 41.40 | 27.95 | 67.51 | 98 |
52 | ALIPURDUAR | SM/07194 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Dima T.G Piped Water Supply Scheme | Retrofitting | Birpara Sub Division | 25/09/2020 | 1,298 | 98.15 | 98.15 | 26/03/2021 | 7 | 67.62 | 90.29 | 133.53 | 98 |
53 | ALIPURDUAR | SM/07195 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Jayanti T.G Piped Water Supply Scheme | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 1,222 | 98.84 | 98.84 | 22/11/2021 | 4 | 83.27 | 92.99 | 111.67 | 99 |
54 | ALIPURDUAR | SM/07196 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Rahimabad T.G Piped Water Supply Scheme | Retrofitting | Alipurduar Sub Division | 25/09/2020 | 803 | 67.24 | 67.24 | 03/09/2021 | 4 | 41.82 | 46.39 | 110.93 | 98 |
55 | ALIPURDUAR | SM/07197 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Gargenda T.G Piped Water Supply Scheme | Retrofitting | Birpara Sub Division | 25/09/2020 | 1,121 | 84.07 | 84.07 | 16/09/2020 | 6 | 72.36 | 43.57 | 60.21 | 81 |
56 | ALIPURDUAR | SM/07198 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Mujnai T.G Piped Water Supply Scheme | Retrofitting | Birpara Sub Division | 25/09/2020 | 882 | 69.04 | 69.04 | 19/10/2020 | 7 | 44.57 | 26.44 | 59.32 | 98 |
57 | ALIPURDUAR | SM/07199 | F.H.T.C Under Jaldhara/Jalswapna including retrofitting of existing distribution System under the command area of Makrapara T.G Piped Water Supply Scheme | Retrofitting | Birpara Sub Division | 25/09/2020 | 688 | 61.63 | 61.63 | 08/09/2021 | 8 | 64.85 | 44.58 | 68.74 | 99 |
58 | ALIPURDUAR | SM/08080 | FHTC under Jaldhara/Jal Sapna including retrofitting of existing distribution system under the command area of Jaigaon & Falakata water supply scheme. | Retrofitting | RWS Kalchini Block | 04/12/2020 | 29,206 | 1,224.31 | 1,224.31 | 19/02/2021 | 74 | 1,250.66 | 822.62 | 65.77 | 72 |
59 | ALIPURDUAR | SM/08580 | Supply of potable drinking water to Mujnai Tea Garden in relation with Chaa Sundari Project. | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 08/01/2021 | 882 | 295.97 | 295.97 | 02/11/2022 | 12 | 257.09 | 143.72 | 55.9 | 100 |
60 | ALIPURDUAR | SM/08880 | FHTC under Jaldhara Jalswapna Including Retrofitting of existing distribution system under the command area of UTTAR MADARIHAT Water Supply Scheme | Retrofitting | Alipurduar Sub Division | 19/08/2021 | 2,328 | 140.24 | 140.24 | 27/09/2021 | 9 | 195.48 | 121.90 | 62.36 | 81 |
61 | ALIPURDUAR | SM/08881 | FHTC under Jaldhara Jalswapna Including Retrofitting of existing distribution system under the command area of UTTAR SISHUBARI Water Supply Scheme | Retrofitting | Birpara Sub Division | 19/08/2021 | 874 | 184.32 | 184.32 | 22/11/2021 | 7 | 201.53 | 91.55 | 45.43 | 99 |
62 | ALIPURDUAR | SM/08882 | FHTC under Jaldhara Jalswapna Including Retrofitting of existing distribution system under the command area of CHANDIRJHAR Water Supply Scheme | Retrofitting | Alipurduar Sub Division | 19/08/2021 | 1,096 | 129.45 | 129.45 | 25/02/2022 | 7 | 145.86 | 107.13 | 73.45 | 98 |
63 | ALIPURDUAR | SM/08883 | FHTC under Jaldhara Jalswapna Including Retrofitting of existing distribution system under the command area of SALKUMARHAT Water Supply Scheme | Retrofitting | Birpara Sub Division | 19/08/2021 | 1,393 | 87.85 | 87.85 | 22/11/2021 | 8 | 126.72 | 82.80 | 65.34 | 61 |
64 | ALIPURDUAR | SM/08884 | FHTC under Jaldhara Jalswapna Including Retrofitting of existing distribution system under the command area of HASIMARA Water Supply Scheme | Retrofitting | RWS Kalchini Block | 19/08/2021 | 2,599 | 398.83 | 398.83 | 03/09/2021 | 17 | 454.44 | 332.21 | 73.1 | 77 |
65 | ALIPURDUAR | SM/09883 | AUGMENTATION OF BHOLARDABRI PIPE WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 2,988 | 451.23 | 451.23 | 13/09/2021 | 24 | 363.50 | 269.92 | 74.26 | 98 |
66 | ALIPURDUAR | SM/09884 | AUGMENTATION OF PUTIMARI PIPED WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 2,333 | 484.93 | 484.93 | 25/01/2022 | 24 | 510.31 | 398.60 | 78.11 | 97 |
67 | ALIPURDUAR | SM/09885 | AUGMENTATION OF BHUTNIRGHAT PIPED WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 22/11/2021 | 3,226 | 449.91 | 449.91 | 22/11/2021 | 18 | 475.10 | 376.12 | 79.17 | 95 |
68 | ALIPURDUAR | SM/09886 | REJUVENATION OF MADHYA PAROKATA PIPED WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 22/11/2021 | 2,202 | 257.81 | 257.81 | 31/01/2022 | 8 | 334.80 | 190.95 | 57.03 | 98 |
69 | ALIPURDUAR | SM/09887 | REJUVENATION OF HASIMARA WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 22/11/2021 | 0 | 92.50 | 92.50 | 08/08/2022 | 20 | 120.55 | 26.03 | 21.59 | 92 |
70 | ALIPURDUAR | SM/09888 | REJUVINATION OF 'DHAOLAJHORA .T.G WATER SUPPLY SCHEME' | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 43.87 | 43.87 | 14/01/2022 | 4 | 29.17 | 18.35 | 62.91 | 62 |
71 | ALIPURDUAR | SM/09890 | REJUVENATION OF 'BAKLA WATER SUPPLY SCHEME' | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 22/11/2021 | 0 | 45.21 | 45.21 | 11/01/2022 | 3 | 37.61 | 20.92 | 55.62 | 95 |
72 | ALIPURDUAR | SM/09891 | REJUVENATION OF 'BANCHUKAMARI WATER SUPPLY SCHEME' | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 47.49 | 47.49 | 04/08/2022 | 6 | 52.95 | 17.67 | 33.37 | 90 |
73 | ALIPURDUAR | SM/09892 | REJUVINATION OF 'CHANDIRJHAR WATER SUPPLY SCHEME' | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 22/11/2021 | 0 | 47.49 | 47.49 | 08/08/2022 | 9 | 54.25 | 31.03 | 57.2 | 99 |
74 | ALIPURDUAR | SM/09893 | REJUVENATION OF 'PURBA CHEPANI WATER SUPPLY SCHEME' | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 22/11/2021 | 0 | 45.22 | 45.22 | 23/03/2023 | 4 | 34.22 | 30.26 | 88.43 | 52 |
75 | ALIPURDUAR | SM/09894 | REJUVENATION OF MUNSHIPARA WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 44.01 | 44.01 | 27/07/2023 | 5 | 37.95 | 6.93 | 18.26 | 57 |
76 | ALIPURDUAR | SM/09895 | Rejuvenation of Makrapara TG WSS. | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 45.22 | 45.22 | 21/02/2022 | 6 | 64.99 | 42.27 | 65.04 | 73 |
77 | ALIPURDUAR | SM/09896 | REJUVENATION OF DHUMCHIPARA. T.G. WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 45.23 | 45.23 | 31/01/2022 | 6 | 33.71 | 15.77 | 46.78 | 89 |
78 | ALIPURDUAR | SM/09897 | REJUVENATION OF BIRPARA(APD) WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 45.48 | 45.48 | 19/02/2021 | 6 | 27.92 | 22.82 | 81.73 | 59 |
79 | ALIPURDUAR | SM/09898 | REJUVENATION OF JAYANTI WATER SUPPLY SCHEME' | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 608 | 47.48 | 47.48 | 20/03/2020 | 12 | 52.47 | 37.43 | 71.34 | 67 |
80 | ALIPURDUAR | SM/09899 | REJUVINATION OF 'JASHODANGA WATER SUPPLY SCHEME' | Augmentation | Alipurduar Sub Division,Junior Engineer 1, Northern Mechanical Division-II,PHE Dte. | 22/11/2021 | 0 | 45.28 | 45.28 | 26/03/2022 | 6 | 42.51 | 34.57 | 81.32 | 98 |
81 | ALIPURDUAR | SM/09900 | REJUVENATION OF 'PASCHIM KHAIRBARI WATER SUPPLY SCHEME' | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 45.23 | 45.23 | 20/05/2022 | 1 | 2.87 | 2.87 | 100 | 5 |
82 | ALIPURDUAR | SM/09901 | REJUVENATION OF HANTUPARA TG WATER SUPPLY SCHEME' | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 44.25 | 44.25 | 18/02/2022 | 6 | 42.11 | 31.47 | 74.73 | 89 |
83 | ALIPURDUAR | SM/09902 | REJUVINATION OF ' UTTAR MADARIHAT WATER SUPPLY SCHEME' | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 47.49 | 47.49 | 19/05/2023 | 5 | 45.81 | 12.19 | 26.61 | 53 |
84 | ALIPURDUAR | SM/09903 | REJUVENATION OF 'CHOTO SALKUMAR WATER SUPPLY SCHEME' | Augmentation | Alipurduar Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 22/11/2021 | 0 | 45.22 | 45.22 | 05/10/2021 | 10 | 51.36 | 25.46 | 49.57 | 63 |
85 | ALIPURDUAR | SM/09904 | Rejuvenation Of Dima T.G. W.S.S | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 44.51 | 44.51 | 03/09/2020 | 5 | 29.29 | 13.51 | 46.12 | 39 |
86 | ALIPURDUAR | SM/09905 | REJUVENATION OF 'LOKNATHPUR WATER SUPPLY SCHEME' | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 22/11/2021 | 0 | 45.51 | 45.51 | 03/09/2020 | 9 | 38.86 | 3.30 | 8.49 | 99 |
87 | ALIPURDUAR | SM/09906 | Rejuvenation of Gargenda Tea Garden Water Supply Scheme | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 45.22 | 45.22 | 14/03/2023 | 2 | 14.94 | 14.67 | 98.19 | 87 |
88 | ALIPURDUAR | SM/09907 | REJUVENATION OF SALSALABARI WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 22/11/2021 | 0 | 44.74 | 44.74 | 16/03/2023 | 2 | 27.38 | 2.39 | 8.73 | 99 |
89 | ALIPURDUAR | SM/09908 | REJUVENATION OF 'TAPSHIKHATA WATER SUPPLY SCHEME' | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 46.31 | 46.31 | 11/01/2022 | 6 | 53.16 | 29.45 | 55.4 | 59 |
90 | ALIPURDUAR | SM/09909 | REJUVENATION OF MADHU TG WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 45.46 | 45.46 | 21/07/2022 | 6 | 46.31 | 34.37 | 74.22 | 61 |
91 | ALIPURDUAR | SM/09910 | REJUVENATION OF PAITKAPARA WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/11/2021 | 0 | 47.45 | 47.45 | 27/12/2021 | 3 | 17.28 | 18.03 | 104.34 | 95 |
92 | ALIPURDUAR | SM/10038 | Dheklapara Tea Garden Area Piped Water Supply Scheme in relation with Chaa Sundari Project. | New | Birpara Sub Division | 10/02/2021 | 567 | 247.03 | 247.03 | 27/04/2022 | 3 | 186.44 | 68.46 | 36.72 | 98 |
93 | ALIPURDUAR | SM/10039 | Torsha Tea Garden Area Piped Water Supply Scheme in relation with Chaa Sundari Project. | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 10/02/2021 | 1,348 | 284.23 | 284.23 | 12/12/2022 | 10 | 267.41 | 225.00 | 84.14 | 98 |
94 | ALIPURDUAR | SM/10054 | Supply of Potable Drinking Water to Lankapara Tea Garden Area Piped Water Supply Scheme in relation with Chaa Sundari Project. | New | Birpara Sub Division | 08/01/2021 | 2,682 | 332.16 | 332.16 | 14/08/2023 | 7 | 285.65 | 12.88 | 4.51 | 5 |
95 | ALIPURDUAR | SM/10154 | AUGMENTATION OF NARATHALI PIPED WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 3,764 | 632.84 | 632.84 | 21/11/2022 | 23 | 615.43 | 526.81 | 85.6 | 97 |
96 | ALIPURDUAR | SM/10155 | REJUVENATION OF TATPARA PIPED WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 1,040 | 140.66 | 140.66 | 22/11/2021 | 7 | 202.51 | 109.66 | 54.15 | 94 |
97 | ALIPURDUAR | SM/10156 | AUGMENTATION OF JATESWAR PIPED WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 16/12/2021 | 4,402 | 706.17 | 706.17 | 11/05/2022 | 22 | 705.20 | 391.29 | 55.49 | 84 |
98 | ALIPURDUAR | SM/10169 | AUGMENTATION OF JAGIJHORA BARABAK PIPED WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 16/12/2021 | 1,527 | 378.84 | 378.84 | 25/03/2022 | 11 | 179.65 | 76.82 | 42.76 | 90 |
99 | ALIPURDUAR | SM/10170 | REJUVENATION OF UTTAR KAMAKHYAGURI PIPED WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 2,836 | 509.72 | 509.72 | 16/10/2020 | 20 | 537.17 | 268.14 | 49.92 | 93 |
100 | ALIPURDUAR | SM/10171 | AUGMENTATION OF UTTAR MAJHER DABRI PIPED WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 3,164 | 750.42 | 750.42 | 07/03/2022 | 23 | 812.70 | 542.67 | 66.77 | 97 |
101 | ALIPURDUAR | SM/10172 | MATHURA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 2,579 | 810.28 | 810.28 | 08/06/2022 | 13 | 745.08 | 434.77 | 58.35 | 98 |
102 | ALIPURDUAR | SM/10173 | MADARIHAT TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 2,277 | 886.25 | 886.25 | 19/02/2021 | 22 | 1,035.83 | 474.01 | 45.76 | 91 |
103 | ALIPURDUAR | SM/10174 | DAKSHIN PAITKAPARA PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 1,867 | 732.56 | 732.56 | 01/04/2022 | 16 | 780.84 | 463.35 | 59.34 | 95 |
104 | ALIPURDUAR | SM/10175 | SIDHABARI PIED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 1,605 | 360.32 | 360.32 | 27/09/2022 | 13 | 434.42 | 209.30 | 48.18 | 60 |
105 | ALIPURDUAR | SM/10176 | MECHPARA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 1,425 | 426.36 | 426.36 | 08/06/2022 | 14 | 480.33 | 45.06 | 9.38 | 56 |
106 | ALIPURDUAR | SM/10177 | JAYBIRPARA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 1,248 | 338.59 | 338.59 | 19/02/2021 | 9 | 366.73 | 114.19 | 31.14 | 56 |
107 | ALIPURDUAR | SM/10178 | GOPALPUR TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 1,487 | 577.33 | 577.33 | 27/01/2021 | 18 | 710.29 | 254.83 | 35.88 | 82 |
108 | ALIPURDUAR | SM/10179 | CHUNIA JHORA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 647 | 364.15 | 364.15 | 14/10/2022 | 10 | 468.50 | 315.92 | 67.43 | 99 |
109 | ALIPURDUAR | SM/10180 | GANGUTIA TEA GARDEN AREA PIPED WATER SUPPLY SHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/12/2021 | 1,250 | 376.91 | 376.91 | 01/04/2022 | 9 | 449.47 | 173.05 | 38.5 | 85 |
110 | ALIPURDUAR | SM/10316 | AUGMENTATION OF SALKUMARHAT PIPED WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 27/01/2022 | 2,393 | 281.05 | 281.05 | 22/11/2022 | 11 | 139.86 | 41.53 | 29.69 | 80 |
111 | ALIPURDUAR | SM/10637 | Providing FHTC of existing LDS under command area UTTARLATABARI WSS at Kalchini Block. | Augmentation | Birpara Sub Division | 16/03/2022 | 3,877 | 252.10 | 252.10 | 23/02/2021 | 11 | 230.13 | 124.40 | 54.06 | 93 |
112 | ALIPURDUAR | SM/10667 | AUGMENTATION OF BAKLA WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 16/03/2022 | 40 | 186.88 | 186.88 | 28/11/2022 | 5 | 88.83 | 51.71 | 58.21 | 95 |
113 | ALIPURDUAR | SM/10668 | AUGMENTATION OF JASHODANGA WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 16/03/2022 | 20 | 69.44 | 69.44 | 06/04/2023 | 3 | 47.01 | 0.36 | 0.77 | 96 |
114 | ALIPURDUAR | SM/10669 | AUGMENTATION OF PURBA CHEPANI WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/03/2022 | 50 | 161.24 | 161.24 | 13/05/2022 | 4 | 39.46 | 11.06 | 28.03 | 33 |
115 | ALIPURDUAR | SM/10670 | AUGMENTATION OF SALSALABARI WATER SUPPLY SCHEME. | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 16/03/2022 | 45 | 108.13 | 108.13 | 19/09/2022 | 4 | 61.86 | 29.60 | 47.85 | 56 |
116 | ALIPURDUAR | SM/10671 | AUGMENTATION OF BIRPARA (APD) WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/03/2022 | 38 | 152.39 | 152.39 | 20/09/2022 | 5 | 86.78 | 18.79 | 21.65 | 96 |
117 | ALIPURDUAR | SM/10672 | AUGMENTATION OF PASCHIM KHAIRBARI WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/03/2022 | 30 | 162.74 | 162.74 | 11/08/2023 | 2 | 27.63 | 0.00 | 0 | 5 |
118 | ALIPURDUAR | SM/10673 | AUGMENTATION OF LOKNATHPUR WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 16/03/2022 | 50 | 252.98 | 252.98 | 15/03/2022 | 6 | 55.57 | 16.34 | 29.4 | 92 |
119 | ALIPURDUAR | SM/10674 | AUGMENTATION OF BANCHUKAMARI WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/03/2022 | 60 | 236.97 | 236.97 | 10/08/2022 | 4 | 135.62 | 4.13 | 3.05 | 80 |
120 | ALIPURDUAR | SM/10675 | AUGMENTATION OF MUNSHIPARA WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/03/2022 | 50 | 178.64 | 178.64 | 16/03/2023 | 1 | 90.61 | 51.29 | 56.61 | 90 |
121 | ALIPURDUAR | SM/10676 | AUGMENTATION OF TAPASHIKHATA PIPED WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/03/2022 | 40 | 252.39 | 252.39 | 13/05/2022 | 3 | 58.04 | 5.02 | 8.65 | 90 |
122 | ALIPURDUAR | SM/10677 | AUGMENTATION OF CHANDIRJHAR WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/03/2022 | 2,678 | 192.09 | 192.09 | 10/08/2022 | 5 | 23.04 | 8.65 | 37.54 | 98 |
123 | ALIPURDUAR | SM/10678 | AUGMENTATION OF JOGENDRAPUR WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 16/03/2022 | 2,100 | 274.45 | 274.45 | 27/07/2023 | 3 | 175.54 | 48.44 | 27.59 | 47 |
124 | ALIPURDUAR | SM/10776 | IMPLEMENTATION OF STANDALONE WATER SUPPLY SYSTEM IN THE VILLAGES HAVING LESS THAN 100 HOUSEHOLD UNDER ALIPURDUAR DISTRICT PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division | 17/02/2022 | 0 | 167.97 | 167.97 | 31/05/2022 | 2 | 161.36 | 97.37 | 60.34 | 72 |
125 | ALIPURDUAR | SM/11401 | AUGMENTATION OF PATLAKHAWA WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 30/03/2022 | 2,981 | 140.89 | 140.89 | 12/11/2020 | 11 | 155.41 | 126.06 | 81.11 | 60 |
126 | ALIPURDUAR | SM/11402 | AUGMENTATION OF JAYANTI PIPED WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 30/03/2022 | 608 | 86.31 | 86.31 | 17/08/2022 | 10 | 96.31 | 55.06 | 57.17 | 74 |
127 | ALIPURDUAR | SM/11459 | AUGMENTATION OF PURBA KATHALBARI WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 27/01/2022 | 7,440 | 1,873.61 | 1,873.61 | 15/07/2022 | 40 | 1,685.05 | 802.03 | 47.6 | 60 |
128 | ALIPURDUAR | SM/11482 | KUMARGRAM TG AREA PIPED WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 30/03/2022 | 1,493 | 395.23 | 395.23 | 15/07/2022 | 18 | 376.90 | 177.14 | 47 | 86 |
129 | ALIPURDUAR | SM/11483 | Bandpani Tea Garden Areas Piped Water Supply Scheme. | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 30/03/2022 | 1,272 | 528.37 | 528.37 | 10/08/2022 | 18 | 398.41 | 206.76 | 51.9 | 60 |
130 | ALIPURDUAR | SM/11484 | NEWLANDS TG AREA PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 30/03/2022 | 1,520 | 455.23 | 455.23 | 15/07/2022 | 14 | 364.23 | 223.41 | 61.34 | 86 |
131 | ALIPURDUAR | SM/11485 | SANKOSH TG AREA PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 30/03/2022 | 1,567 | 389.92 | 389.92 | 17/08/2022 | 13 | 374.00 | 193.80 | 51.82 | 78 |
132 | ALIPURDUAR | SM/11696 | HOASINBAD TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 25/04/2022 | 990 | 411.35 | 411.35 | 19/09/2022 | 8 | 309.97 | 189.22 | 61.04 | 79 |
133 | ALIPURDUAR | SM/11709 | SHRINATHPUR TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 25/04/2022 | 1,702 | 817.44 | 817.44 | 19/09/2022 | 24 | 766.97 | 530.17 | 69.13 | 90 |
134 | ALIPURDUAR | SM/11765 | AUGMENTATION OF TOTOPARA AREA PIPED WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Madarihat - Birpara Block | 25/04/2022 | 110 | 154.07 | 154.07 | 20/09/2021 | 5 | 114.80 | 51.71 | 45.04 | 32 |
135 | ALIPURDUAR | SM/11766 | AUGMENTATION OF NEPANIA PIPED WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 25/04/2022 | 400 | 88.14 | 88.14 | 14/08/2023 | 4 | 105.05 | 30.66 | 29.19 | 64 |
136 | ALIPURDUAR | SM/11767 | AUGMENTATION OF LANKAPARA TG FOR LONKAPARA HAT AREA PIPED WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 25/04/2022 | 250 | 204.15 | 204.15 | 22/02/2022 | 12 | 211.45 | 46.70 | 22.09 | 39 |
137 | ALIPURDUAR | SM/11958 | AUGMENTATION OF KAIJALI BASTY WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 16/03/2022 | 493 | 562.16 | 562.16 | 21/11/2022 | 8 | 227.77 | 87.34 | 38.35 | 57 |
138 | ALIPURDUAR | SM/11959 | AUGMENTATION OF UTTAR SISUBARI WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/03/2022 | 807 | 648.63 | 648.63 | 05/09/2022 | 7 | 341.63 | 21.15 | 6.19 | 50 |
139 | ALIPURDUAR | SM/11960 | AUGMENTATION OF DALMORE & RAMJHORA TEA GARDEN PIPED WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/03/2022 | 1,031 | 512.91 | 512.91 | 22/12/2022 | 6 | 313.88 | 67.38 | 21.47 | 36 |
140 | ALIPURDUAR | SM/11970 | AUGMENTATION OF DAKSHIN SONAPUR WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 16/03/2022 | 7,780 | 1,275.43 | 1,275.43 | 13/09/2021 | 19 | 893.97 | 294.31 | 32.92 | 58 |
141 | ALIPURDUAR | SM/11985 | AUGMENTATION OF KUMARGRAM PIPED WATER SUPPLY SCHEME | Augmentation | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 30/03/2022 | 7,273 | 2,156.38 | 2,156.38 | 15/07/2022 | 21 | 1,827.46 | 667.58 | 36.53 | 59 |
142 | ALIPURDUAR | SM/11991 | KARTIKA TEA GARDEN AREA PIPED WAATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 15/07/2022 | 1,128 | 432.05 | 432.05 | 21/11/2022 | 11 | 396.17 | 239.61 | 60.48 | 88 |
143 | ALIPURDUAR | SM/11992 | PHASKHAWA TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division | 15/07/2022 | 705 | 269.79 | 269.79 | 21/11/2022 | 11 | 239.63 | 79.32 | 33.1 | 71 |
144 | ALIPURDUAR | SM/12113 | KOHINUR TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 15/07/2022 | 2,542 | 821.35 | 821.35 | 21/11/2022 | 13 | 475.64 | 283.76 | 59.66 | 78 |
145 | ALIPURDUAR | SM/12114 | RAYDAK TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 15/07/2022 | 1,999 | 588.27 | 588.27 | 21/11/2022 | 21 | 549.34 | 172.47 | 31.4 | 66 |
146 | ALIPURDUAR | SM/12361 | AUGMENTATION OF HASIMARA WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 16/03/2022 | 1,277 | 1,269.79 | 1,269.79 | 19/05/2023 | 9 | 285.17 | 68.22 | 23.92 | 34 |
147 | ALIPURDUAR | SM/12561 | AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 27/01/2022 | 7,428 | 1,852.66 | 1,852.66 | 19/09/2022 | 37 | 1,309.01 | 1,029.58 | 78.65 | 86 |
148 | ALIPURDUAR | SM/12753 | SISHA JUMRHA PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 22/08/2022 | 2,683 | 797.79 | 797.79 | 07/08/2023 | 8 | 665.80 | 206.58 | 31.03 | 62 |
149 | ALIPURDUAR | SM/12754 | NAOTHOARTARI PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 22/08/2022 | 295 | 415.72 | 415.72 | 09/08/2023 | 6 | 319.12 | 93.62 | 29.34 | 31 |
150 | ALIPURDUAR | SM/13239 | KADAMBINI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick),RWS Falakata Block | 09/09/2022 | 1,719 | 716.98 | 716.98 | 17/01/2023 | 13 | 634.97 | 357.99 | 56.38 | 71 |
151 | ALIPURDUAR | SM/13240 | PASCHIM CHENGMARI PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 09/09/2022 | 929 | 741.26 | 741.26 | 17/01/2023 | 7 | 425.66 | 204.24 | 47.98 | 73 |
152 | ALIPURDUAR | SM/13241 | BARUIPARA AND ADJOINING MOUZAS PIPED WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 09/09/2022 | 1,437 | 780.16 | 780.16 | 17/01/2023 | 7 | 497.97 | 107.92 | 21.67 | 29 |
153 | ALIPURDUAR | SM/13242 | CHUOTA DALDALI PIPED WATER SUPPLY SCHEME. | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 09/09/2022 | 1,001 | 615.61 | 615.61 | 10/08/2023 | 7 | 323.43 | 65.51 | 20.25 | 22 |
154 | ALIPURDUAR | SM/13243 | PURBA KHALISHAMARI PIPED WATER SUPPLY SCHEME. | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 09/09/2022 | 1,919 | 963.61 | 963.61 | 25/08/2023 | 8 | 517.70 | 309.08 | 59.7 | 61 |
155 | ALIPURDUAR | SM/13244 | NIMTI DOMOHANI PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 09/09/2022 | 1,482 | 710.27 | 710.27 | 31/10/2023 | 9 | 1,055.83 | 156.22 | 14.8 | 78 |
156 | ALIPURDUAR | SM/13245 | PASCHIM SATALI PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 09/09/2022 | 2,797 | 969.65 | 969.65 | 17/01/2023 | 9 | 945.95 | 597.02 | 63.11 | 80 |
157 | ALIPURDUAR | SM/13246 | BARIGURI PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 09/09/2022 | 3,454 | 895.77 | 895.77 | 14/03/2023 | 9 | 1,249.98 | 33.38 | 2.67 | 28 |
158 | ALIPURDUAR | SM/13247 | PRODHANPARA PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 09/09/2022 | 1,353 | 638.14 | 638.14 | 27/07/2023 | 5 | 464.11 | 88.76 | 19.12 | 28 |
159 | ALIPURDUAR | SM/13248 | MADHYA KHAIRBARI PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Madarihat - Birpara Block | 09/09/2022 | 2,462 | 877.17 | 877.17 | 15/09/2023 | 8 | 649.60 | 205.76 | 31.67 | 37 |
160 | ALIPURDUAR | SM/13249 | BUXA FOREST (RAJA BHATKHAWA) PIPED WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 09/09/2022 | 2,652 | 860.22 | 860.22 | 28/07/2023 | 5 | 698.95 | 0.00 | 0 | 16 |
161 | ALIPURDUAR | SM/13299 | KAYAKHATA PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 09/09/2022 | 1,585 | 682.41 | 682.41 | 16/03/2023 | 8 | 411.83 | 142.96 | 34.71 | 42 |
162 | ALIPURDUAR | SM/13300 | BRAJERKUTHI PIPED WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 09/09/2022 | 1,847 | 944.20 | 944.20 | 09/08/2023 | 14 | 649.13 | 395.71 | 60.96 | 85 |
163 | ALIPURDUAR | SM/13301 | PURBA CHIKLIGURI PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 09/09/2022 | 1,869 | 875.66 | 875.66 | 25/08/2023 | 11 | 701.58 | 257.59 | 36.72 | 56 |
164 | ALIPURDUAR | SM/13302 | DAKSHIN BARAJHAR FOREST PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 09/09/2022 | 308 | 171.75 | 171.75 | 21/08/2023 | 3 | 100.37 | 65.37 | 65.13 | 53 |
165 | ALIPURDUAR | SM/13303 | TELIPARA PIPED WATER SUPPLY SCHEME. | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 09/09/2022 | 1,029 | 488.14 | 488.14 | 10/08/2023 | 9 | 317.98 | 94.05 | 29.58 | 52 |
166 | ALIPURDUAR | SM/13304 | MARAKHATA PIPED WATER SUPPLY SCHEME. | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 09/09/2022 | 3,129 | 839.09 | 839.09 | 27/07/2023 | 10 | 496.36 | 245.52 | 49.46 | 80 |
167 | ALIPURDUAR | SM/13305 | DAKSHIN MAJIDKHANA PIPED WATER SUPPLY SCHEME. | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 09/09/2022 | 1,402 | 760.21 | 760.21 | 23/08/2023 | 10 | 547.25 | 338.10 | 61.78 | 83 |
168 | ALIPURDUAR | SM/13306 | KALABERIA PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 09/09/2022 | 1,065 | 461.28 | 461.28 | 27/07/2023 | 6 | 323.90 | 103.23 | 31.87 | 40 |
169 | ALIPURDUAR | SM/13448 | JAYANTI TEA GARDEN -II AREA PIPED WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 09/09/2022 | 563 | 305.16 | 305.16 | 09/08/2023 | 7 | 274.16 | 49.62 | 18.1 | 34 |
170 | ALIPURDUAR | SM/13449 | ETHELBARI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 09/09/2022 | 1,856 | 695.45 | 695.45 | 22/12/2022 | 12 | 609.30 | 286.06 | 46.95 | 71 |
171 | ALIPURDUAR | SM/14092 | ATIABARI TEA GARDEN PIPED WATER SUPPLY SCHEME. | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 30/09/2022 | 1,884 | 895.42 | 895.42 | 07/09/2023 | 9 | 672.53 | 242.63 | 36.08 | 75 |
172 | ALIPURDUAR | SM/14093 | RAJABHAT TEA GARDEN PIPED WATER SUPPLY SCHEME. | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 30/09/2022 | 1,074 | 528.73 | 528.73 | 11/09/2023 | 7 | 298.33 | 131.39 | 44.04 | 76 |
173 | ALIPURDUAR | SM/14096 | AUGMENTATION OF BHATIBARI PIPED WATER SUPPLY SCHEME | Augmentation | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 27/01/2022 | 8,070 | 2,031.40 | 2,031.40 | 03/09/2021 | 50 | 1,599.12 | 771.99 | 48.28 | 38 |
174 | ALIPURDUAR | SM/14209 | PARARPAR PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 26/09/2022 | 1,187 | 561.82 | 561.82 | 23/03/2023 | 7 | 371.47 | 114.73 | 30.89 | 28 |
175 | ALIPURDUAR | SM/14210 | FOSKADANGA PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 26/09/2022 | 684 | 510.99 | 510.99 | 27/09/2023 | 6 | 378.68 | 106.76 | 28.19 | 17 |
176 | ALIPURDUAR | SM/14211 | BHATKHAWA TEA GARDEN PIPED WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 26/09/2022 | 1,604 | 530.22 | 530.22 | 27/07/2023 | 7 | 389.40 | 129.45 | 33.24 | 61 |
177 | ALIPURDUAR | SM/14212 | BHATPARA TEA GARDEN PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 26/09/2022 | 2,321 | 570.23 | 570.23 | 06/10/2023 | 9 | 522.97 | 190.09 | 36.35 | 72 |
178 | ALIPURDUAR | SM/14213 | RANGAMATI TEA GARDEN PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 26/09/2022 | 2,268 | 740.97 | 740.97 | 03/08/2023 | 10 | 546.20 | 1.18 | 0.22 | 16 |
179 | ALIPURDUAR | SM/14214 | BEECH TEA GARDEN PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 26/09/2022 | 1,579 | 527.26 | 527.26 | 06/10/2023 | 8 | 434.36 | 214.07 | 49.28 | 85 |
180 | ALIPURDUAR | SM/14215 | NIMTIJHORA TEA GARDEN PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 26/09/2022 | 1,002 | 336.47 | 336.47 | 10/08/2023 | 7 | 286.54 | 92.90 | 32.42 | 61 |
181 | ALIPURDUAR | SM/14216 | GAROCHIRA BANDAPANI PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 26/09/2022 | 130 | 129.41 | 129.41 | 19/01/2023 | 4 | 117.40 | 37.08 | 31.58 | 69 |
182 | ALIPURDUAR | SM/14217 | DAKSHIN RANGALIBAZNA PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 26/09/2022 | 794 | 409.38 | 409.38 | 16/03/2023 | 8 | 373.05 | 100.57 | 26.96 | 38 |
183 | ALIPURDUAR | SM/14218 | NURPUR PIPED WATER SUPPLY SCHEME. | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 26/09/2022 | 423 | 451.36 | 451.36 | 15/05/2023 | 9 | 292.43 | 139.58 | 47.73 | 92 |
184 | ALIPURDUAR | SM/14219 | TURTURI PIPED WATER SUPPLY SCHEME. | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 26/09/2022 | 1,003 | 948.08 | 948.08 | 23/08/2023 | 13 | 516.80 | 243.00 | 47.02 | 57 |
185 | ALIPURDUAR | SM/14220 | TORSHA FOREST PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 26/09/2022 | 201 | 142.14 | 142.14 | 19/01/2023 | 4 | 183.47 | 85.89 | 46.81 | 80 |
186 | ALIPURDUAR | SM/14221 | BALLALGURI PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Madarihat - Birpara Block | 26/09/2022 | 609 | 413.54 | 413.54 | 07/09/2023 | 7 | 290.09 | 124.05 | 42.76 | 61 |
187 | ALIPURDUAR | SM/14222 | UTTAR RANGALIBAZNA PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 26/09/2022 | 729 | 429.71 | 429.71 | 27/07/2023 | 7 | 393.70 | 67.32 | 17.1 | 37 |
188 | ALIPURDUAR | SM/14223 | PAKRIGURI PIPED WAYER SUPPLY SCHEME. | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 26/09/2022 | 603 | 509.75 | 509.75 | 10/08/2023 | 8 | 231.72 | 13.38 | 5.77 | 18 |
189 | ALIPURDUAR | SM/14233 | AUGMENTATION OF BIRPARA WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/03/2022 | 9,924 | 2,288.93 | 2,288.93 | 17/01/2023 | 41 | 1,753.19 | 318.26 | 18.15 | 46 |
190 | ALIPURDUAR | SM/15206 | MAIRADANGA PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 16/11/2022 | 2,583 | 963.71 | 963.71 | 11/08/2023 | 5 | 783.56 | 90.14 | 11.5 | 35 |
191 | ALIPURDUAR | SM/15207 | PASCHIM DEOGAON PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 16/11/2022 | 2,097 | 802.95 | 802.95 | 11/08/2023 | 6 | 662.83 | 119.51 | 18.03 | 50 |
192 | ALIPURDUAR | SM/15208 | DHANIRAMPUR PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 16/11/2022 | 1,552 | 670.33 | 670.33 | 11/08/2023 | 7 | 566.55 | 247.91 | 43.76 | 46 |
193 | ALIPURDUAR | SM/15209 | AUGMENTATION OF HANTUPARA TG PIPED WATER SUPPLY SCHEME. | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/11/2022 | 0 | 112.19 | 112.19 | 13/03/2023 | 3 | 40.32 | 13.24 | 32.84 | 52 |
194 | ALIPURDUAR | SM/15210 | AUGMENTATION OF DHUMCHIPARA TG PIPED WATER SUPPLY SCHEME. | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/11/2022 | 0 | 111.32 | 111.32 | 13/03/2023 | 7 | 109.89 | 8.44 | 7.68 | 43 |
195 | ALIPURDUAR | SM/15482 | KALCHINI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 27/01/2022 | 5,753 | 1,380.67 | 1,380.67 | 19/02/2021 | 18 | 1,159.90 | 105.96 | 9.14 | 33 |
196 | ALIPURDUAR | SM/15517 | MADHYA KAMAKHYAGURI PIPED WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 09/09/2022 | 1,645 | 1,067.02 | 1,067.02 | 22/02/2023 | 8 | 639.86 | 405.66 | 63.4 | 66 |
197 | ALIPURDUAR | SM/15534 | CHALNIPAK PIPED WATER SUPPLY SCHEME. | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Madarihat - Birpara Block | 26/09/2022 | 1,648 | 1,024.40 | 1,024.40 | 31/07/2023 | 10 | 566.12 | 345.70 | 61.06 | 39 |
198 | ALIPURDUAR | SM/15758 | NARASINGPUR PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 16/11/2022 | 2,461 | 842.46 | 842.46 | 11/08/2023 | 9 | 784.14 | 269.92 | 34.42 | 33 |
199 | ALIPURDUAR | SM/15914 | UTTAR BARAJHAR FOREST PIPE WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 30/09/2022 | 567 | 358.24 | 358.24 | 24/04/2023 | 5 | 231.67 | 15.00 | 6.47 | 9 |
200 | ALIPURDUAR | SM/16114 | UMACHARANPUR PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 16/11/2022 | 3,053 | 950.07 | 950.07 | 11/08/2023 | 5 | 673.10 | 44.96 | 6.68 | 15 |
201 | ALIPURDUAR | SM/16115 | REJUVENATION OF SIDHABARI PIPED WATER SUPPLY SCHEME | Augmentation | Birpara Sub Division | 16/11/2022 | 0 | 240.25 | 240.25 | 31/01/2023 | 1 | 82.58 | 0.00 | 0 | 58 |
202 | ALIPURDUAR | SM/16506 | 28&29 MILE BASTI PIPE WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 28/12/2022 | 1,752 | 990.41 | 990.41 | 04/04/2023 | 10 | 401.55 | 12.04 | 3 | 7 |
203 | ALIPURDUAR | SM/16507 | BUXA PIPE WATER SUPPLY SCHEME | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 28/12/2022 | 219 | 219.61 | 219.61 | 23/03/2023 | 4 | 74.85 | 0.00 | 0 | 3 |
204 | ALIPURDUAR | SM/16537 | PURBBA NARATHALI PIPED WATER SUPPLY SCHEME. | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 09/09/2022 | 1,778 | 1,261.38 | 1,261.38 | 14/09/2023 | 12 | 1,101.17 | 237.37 | 21.56 | 53 |
205 | ALIPURDUAR | SM/16538 | UTTAR MAJID KHANA PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 09/09/2022 | 1,888 | 1,074.69 | 1,074.69 | 27/07/2023 | 10 | 582.97 | 322.68 | 55.35 | 66 |
206 | ALIPURDUAR | SM/16539 | UTTAR MANDABARI PIPED WATER SUPPLY SCHEME | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 09/09/2022 | 2,329 | 1,121.63 | 1,121.63 | 15/09/2023 | 7 | 848.44 | 150.58 | 17.75 | 64 |
207 | ALIPURDUAR | SM/16817 | UTTAR DEOGAON PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 28/12/2022 | 1,601 | 808.50 | 808.50 | 18/08/2023 | 7 | 698.31 | 139.62 | 19.99 | 28 |
208 | ALIPURDUAR | SM/16818 | MALSAGAON PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 28/12/2022 | 1,481 | 777.46 | 777.46 | 22/08/2023 | 4 | 625.26 | 245.87 | 39.32 | 38 |
209 | ALIPURDUAR | SM/16819 | LACHHIMANDABRI PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 28/12/2022 | 1,272 | 658.29 | 658.29 | 16/08/2023 | 6 | 587.39 | 49.26 | 8.39 | 20 |
210 | ALIPURDUAR | SM/16820 | BENGKANDI PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 28/12/2022 | 2,074 | 964.09 | 964.09 | 16/08/2023 | 8 | 805.54 | 74.79 | 9.28 | 33 |
211 | ALIPURDUAR | SM/16821 | DALMONI TEA GARDEN PIPED WATER SUPPLY SCHEME | New | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 28/12/2022 | 442 | 405.28 | 405.28 | 31/03/2023 | 5 | 259.31 | 0.00 | 0 | 14 |
212 | ALIPURDUAR | SM/16822 | TASTI TEA GARDEN PIPED WATER SUPPLY SCHEME. | New | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 28/12/2022 | 1,184 | 569.65 | 569.65 | 19/05/2023 | 6 | 385.50 | 27.39 | 7.11 | 18 |
213 | ALIPURDUAR | SM/16823 | DALGAON TEA GARDEN PIPED WATER SUPPLY SCHEME. | New | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 28/12/2022 | 1,298 | 739.67 | 739.67 | 16/08/2023 | 7 | 499.05 | 108.25 | 21.69 | 42 |
214 | ALIPURDUAR | SM/16824 | AUGMENTATION OF GARGENDA TG PIPED WATER SUPPLY SCHEME. | Augmentation | Birpara Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 28/12/2022 | 0 | 273.66 | 273.66 | 22/03/2023 | 8 | 188.72 | 0.00 | 0 | 22 |
215 | ALIPURDUAR | SM/18150 | Malangi Tea Garden Area Piped Water Supply Scheme | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 10/03/2023 | 2,115 | 561.45 | 561.45 | 20/07/2023 | 6 | 388.35 | 4.50 | 1.16 | 33 |
216 | ALIPURDUAR | SM/18151 | Khagenhat Piped Water Supply Scheme | New | Birpara Sub Division,Junior Engineer 2, Cooch-Behar Mechanical Sub-Division, PHE Dte.(Gourab Mallick) | 10/03/2023 | 2,057 | 822.98 | 822.98 | 25/08/2023 | 6 | 635.81 | 0.00 | 0 | 19 |
217 | ALIPURDUAR | SM/18152 | Chengmari Piped Water Supply Scheme | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 10/03/2023 | 1,699 | 772.15 | 772.15 | 25/08/2023 | 6 | 550.21 | 235.54 | 42.81 | 47 |
218 | ALIPURDUAR | SM/18153 | Dhantali Piped Water Supply Scheme | New | Alipurduar Sub Division,Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda) | 10/03/2023 | 206 | 285.56 | 285.56 | 25/08/2023 | 3 | 213.82 | 53.93 | 25.22 | 43 |
219 | ALIPURDUAR | SM/18154 | Uttar Dhalkar Piped Water Supply Scheme | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 10/03/2023 | 594 | 404.14 | 404.14 | 22/08/2023 | 3 | 499.47 | 0.00 | 0 | 18 |
220 | ALIPURDUAR | SM/18156 | Bhutri Forest Piped Water Supply Scheme | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Kalchini Block | 10/03/2023 | 48 | 59.54 | 59.54 | 12/10/2023 | 3 | 18.35 | 4.10 | 22.34 | 68 |
221 | ALIPURDUAR | SM/18157 | Purbba Majherdabri Tea Garden Area Piped Water Supply Scheme | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - II Block | 10/03/2023 | 725 | 360.16 | 360.16 | 22/05/2023 | 4 | 243.60 | 37.62 | 15.44 | 38 |
222 | ALIPURDUAR | SM/18158 | Parpatla Khawa Piped Water Supply Scheme | New | Junior Engineer 2,Alipurduar Mechanical sub-division,PHE Dte (Md. saquib Hoda),RWS Alipurduar - I Block | 10/03/2023 | 189 | 187.87 | 187.87 | 25/08/2023 | 2 | 248.64 | 0.00 | 0 | 12 |
223 | ALIPURDUAR | SM/18254 | AUGMENTATION OF DALIMPUR PWSS | Augmentation | 27/01/2022 | 3,047 | 1,020.25 | 1,020.25 | 12/07/2023 | 14 | 900.03 | 87.45 | 9.72 | 18 | |
Total | 3,44,018 | 89,667.07 | 89,667.07 | # | 2,076 | 71,821.92 | 28,711.61 | # | # |