Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
38 1,328.27 1,039.5 78.26  
1 ALIPURDUAR Alipurduar Division AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation Construction of pathway, surface drain and chatal, installation of paver block, land development along with the others allied works at Samuktala Zone-I head work site PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division RWS Alipurduar - II Block ORD/000197/2023-2024 1495/ALD 16/08/2023 60 DIPAK DAS 13.04 0.00 0 0
2 ALIPURDUAR Alipurduar Division AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation Construction of excess work of Boundary wall & 3m Span open Foundation Culvert with Boulder Protection works and other alied works at 2nd Site of Samuktala PWSS Zone-I PWSS Alipurduar Sadar Sub-Division, under Alipurduar Division PHE DTE. (SM/12561) Alipurduar Sadar Sub Division RWS Alipurduar - II Block ORD/000228/2024-2025 2281/ALD 05/08/2024 60 PRITAM DAS 12.58 0.00 0 0
3 ALIPURDUAR Alipurduar Division AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation Construction of 100cum. OHR for SAMUKTALA ZONE-III Water Supply Scheme under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division RWS Alipurduar - II Block ORD/000265/2022-2023 1658/ALD 19/09/2022 180 ALIPURDUAR CO-OPERATIVE LABOUR CONTRUCT & CONSTRUCTION SOCIETY LTD. 43.90 21.25 48.41 66
4 ALIPURDUAR Alipurduar Division AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation Soil investigation work at 3 different places of Samuktala within Alipurduar District under Alipurduar Division PHE Dte. Alipurduar Sadar Sub Division RWS Alipurduar - II Block ORD/000266/2022-2023 1657/ALD 19/09/2022 30 ASIS ENTERPRISE 3.65 3.65 100 50
5 ALIPURDUAR Alipurduar Division AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation Construction of Boundary wall at 3rd TW site of Samuktalata PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division RWS Alipurduar - II Block ORD/000267/2022-2023 1666/ALD 19/09/2022 30 PRITAM DAS 4.74 4.74 100 47
6 ALIPURDUAR Alipurduar Division AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation Construction of Boundary wall at 5th TW site of Samuktalata PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division RWS Alipurduar - II Block ORD/000268/2022-2023 1668/ALD 19/09/2022 210 ROY & PANDIT CONSTRUCTIONS 4.76 4.13 86.76 100
7 ALIPURDUAR Alipurduar Division AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation Construction of Pump House at 1st TW site of Samuktalata PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division ORD/000269/2022-2023 1669/ALD 19/09/2022 60 KOUSHIK BHOWMICK 4.77 3.88 81.34 95
8 ALIPURDUAR Alipurduar Division AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation Construction of Pump House at 3rd TW site of Samuktalata PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division ORD/000270/2022-2023 1671/ALD 19/09/2022 60 SWADESH DEV 4.75 4.65 97.89 100
9 ALIPURDUAR Alipurduar Division AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation Construction of Pump House at 4th TW site of Samuktalata PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division RWS Alipurduar - II Block ORD/000271/2022-2023 1672/ALD 19/09/2022 60 PROJIT HALDER 4.77 0.00 0 0
10 ALIPURDUAR Alipurduar Division AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation Construction of Pump House at 5th TW site of Samuktalata PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division RWS Alipurduar - II Block ORD/000272/2022-2023 1673/ALD 19/09/2022 60 CHITTA RANJAN DEY 4.75 2.35 49.47 100
11 ALIPURDUAR Alipurduar Division AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation Construction of Boundary wall at 4th TW site of Samuktalata PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division ORD/000273/2022-2023 1667/ALD 19/09/2022 45 DHANENDRA SARKAR 4.77 4.74 99.37 100
12 ALIPURDUAR Alipurduar Division AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation Construction of 400cum OHR for SAMUKTALA ZONE-I Water Supply Scheme under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division RWS Alipurduar - II Block ORD/000274/2022-2023 1659/ALD 19/09/2022 180 DILIP MAHATO 77.32 72.80 94.15 100
13 ALIPURDUAR Alipurduar Division AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation Construction of 350cum OHR for SAMUKTALA ZONE-II Water Supply Scheme under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division RWS Alipurduar - II Block ORD/000275/2022-2023 1661/ALD 19/09/2022 180 MATARA CONSTRUCTION CO 71.41 60.80 85.14 100
14 ALIPURDUAR Alipurduar Division AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation Laying Distribution pipe with DI and UPVC pipe of SAMUKTALA ZONE-II WSS under Alipurduar Division, PHE Dte. (Part-A) Alipurduar Sadar Sub Division RWS Alipurduar - II Block ORD/000276/2022-2023 1662/ALD 19/09/2022 180 M/S SSB CONSTRUCTION CO. 100.42 92.48 92.09 48
15 ALIPURDUAR Alipurduar Division AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation Laying Distribution pipe with DI and UPVC pipe of SAMUKTALA ZONE-II WSS under Alipurduar Division, PHE Dte. (Part-B) Alipurduar Sadar Sub Division RWS Alipurduar - II Block ORD/000277/2022-2023 1663/ALD 19/09/2022 180 MATARA CONSTRUCTION CO 101.06 92.43 91.46 50
16 ALIPURDUAR Alipurduar Division AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation Laying Distribution pipe with DI and UPVC pipe of Baniadabri and Samuktala Bazar Area under SAMUKTALA WSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division RWS Alipurduar - II Block ORD/000278/2022-2023 1664/ALD 19/09/2022 180 DILIP MAHATO 100.58 92.15 91.62 46
17 ALIPURDUAR Alipurduar Division AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation Laying Distribution pipe with DI and UPVC pipe of Baniadabri and Garokhota Area under SAMUKTALA WSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division RWS Alipurduar - II Block ORD/000279/2022-2023 1665/ALD 19/09/2022 180 GOUTAM KUMAR DAS 101.20 95.10 93.97 47
18 ALIPURDUAR Alipurduar Division AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation Laying distribution pipeline with UPVC pipe of Samuktala Zone-III Water Supply Scheme under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division RWS Alipurduar - II Block ORD/000280/2022-2023 1660/ALD 19/09/2022 60 LONGLAST PIPES (INDIA)PVT.LTD. 97.26 95.08 97.76 50
19 ALIPURDUAR Alipurduar Division AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation Construction of boundary wall (remaining portion) at Headwork site under Samuktala Zone-III PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division RWS Alipurduar - II Block ORD/000289/2023-2024 1903/ALD 07/09/2023 360 SWAPAN MALAKAR 6.00 2.96 49.33 100
20 ALIPURDUAR Alipurduar Division AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation Construction of Pump House at 2nd TW site of Samuktalata PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division RWS Alipurduar - II Block ORD/000293/2022-2023 1670/ALD 19/09/2022 60 M/S SADHAN SAHA & CO. 4.76 4.60 96.64 100
21 ALIPURDUAR Alipurduar Division AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation Tube well boring by ODEX-165 Method of drilling, Construction of Pump House, Boundary wall at proposed 6th site of SAMUKTALA PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division RWS Alipurduar - II Block ORD/000324/2023-2024 2421/ALD 09/11/2023 240 DULAL DAS 17.57 0.00 0 0
22 ALIPURDUAR Alipurduar Division AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation Cons. Of pathway, surface drain and chatal, Installation of Paver block, land development along with the other allied works at Samuktala Zone-II H/W, 2nd site and 3rd Tube well Site under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division RWS Alipurduar - II Block ORD/000333/2023-2024 2519/ALD 24/11/2023 60 CREATIVE UN EMPLOYED ENGINEERSCO OPER SOCYLIMITED 23.26 0.00 0 0
23 ALIPURDUAR Alipurduar Division AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation Laying of rising main and delivery line connection, construction of boundary wall at headwork site of Samuktala Zone-I PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division RWS Alipurduar - II Block ORD/000340/2023-2024 2541/ALD 28/11/2023 180 DIPAK DAS 28.74 3.97 13.81 100
24 ALIPURDUAR Alipurduar Division AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation 5 nos Tube well boring by ODEX - 165 Method of drilling for the works of augmentation of SAMUKTALA PWSS under Alipurduar Division ,PHE Dte Alipurduar Sadar Sub Division RWS Alipurduar - II Block ORD/000342/2022-2023 2221/ALD 21/11/2022 30 S.G. CONSTRUCTION 32.14 25.17 78.31 50
25 ALIPURDUAR Alipurduar Division AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation Laying distribution system with new UPVC pipeline, providing FHTC and other allied works for Samuktala Zone-II PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division RWS Alipurduar - II Block ORD/000355/2022-2023 2500/ALD 13/12/2022 120 TAPASH KUMAR BHOWMICK 88.46 80.56 91.07 50
26 ALIPURDUAR Alipurduar Division AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation Laying distribution system with new UPVC pipeline, providing FHTC and other allied works for Samuktala Zone-III PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division RWS Alipurduar - II Block ORD/000356/2022-2023 2501/ALD 13/12/2022 120 MADHAB SAHA 93.21 71.72 76.94 49
27 ALIPURDUAR Alipurduar Division AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation Laying distribution system with new UPVC/DI pipeline along with rising and delivery line connection, providing FHTC and others allied works for Samuktala Zone-II PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division RWS Alipurduar - II Block ORD/000393/2022-2023 2658/ALD 22/12/2022 360 HARIDAS GHOSH 88.71 79.04 89.1 48
28 ALIPURDUAR Alipurduar Division AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation Laying distribution system with new UPVC/DI pipeline along with rising and delivery line connection, providing FHTC and other allied works for Samuktala Zone-III PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division RWS Alipurduar - II Block ORD/000394/2022-2023 2659/ALD 22/12/2022 120 ESCON INDIA 90.53 50.31 55.57 50
29 ALIPURDUAR Alipurduar Division AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation Supply of CIPE Special & CI Jeffy Coupling for Augmentation of Samuktala Water Supply Scheme under Alipurduar Division P.H.E. Dte. (SM/12561) Alipurduar Sadar Sub Division Birpara Sub Division,RWS Alipurduar - II Block ORD/000467/2023-2024 673/ALD 06/03/2024 30 BHAGWATI BHUJEL 11.36 5.67 49.91 15
30 ALIPURDUAR Alipurduar Division AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation Land development works at headwork site and laying of new UPVC/DI pipeline for filling gap in distribution system Samuktala Zone-III PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division RWS Alipurduar - II Block ORD/000488/2022-2023 3320/ALD 13/03/2023 60 BHAGWATI BHUJEL 9.19 4.58 49.84 100
31 ALIPURDUAR Alipurduar Division AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation Laying of UPVC pipeline for filling of Gap in distribution system Samuktala Zone-I PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division RWS Alipurduar - II Block ORD/000489/2022-2023 3321/ALD 13/03/2023 60 CHANDAN KIRTONIA 5.37 5.37 100 0
32 ALIPURDUAR Alipurduar Division AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation Repairing of HW Site Boundary Wall (15M) Samuktala WSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division RWS Alipurduar - II Block ORD/000556/2022-2023 3501/ALD 23/03/2023 120 PROGRESSIVE UNEMPLOYED CO-OPERATIVE LABOUR CONTRACT & CONSTRUCTION SOCIETY LTD. 2.14 0.90 42.06 100
33 ALIPURDUAR Northern Mechanical Division II AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation NEW SEVICE CONNECTION CHARGES FOR SAMUKTALA PWSS ZONE-IIP/H NO.I BILL/00741/2023-2024 BP-2023-24-218 13/07/2023 WBSEDCL 1.54 0.00 0 0
34 ALIPURDUAR Northern Mechanical Division II AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation NEW SERVICE CONNECTION CHARGE FOR SAMUKTALA ZONE -III P/H NO.I BILL/00785/2023-2024 BP-2023-24-219 13/07/2023 WBSEDCL 1.54 0.00 0 0
35 ALIPURDUAR Northern Mechanical Division II AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation NEW SERVICE CONNECTION CHARGE FOR SAMUKTALA ZONE -III P/H NO.II BILL/00786/2023-2024 BP-2023-24-220 13/07/2023 WBSEDCL 1.54 0.00 0 0
36 ALIPURDUAR Northern Mechanical Division II AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation New Service Connection Charge For Samuktala Z-I P/H NO-II BILL/00901/2023-2024 BP-2023-24-221 13/07/2023 WBSEDCL 1.54 0.00 0 0
37 ALIPURDUAR Northern Mechanical Division II AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation New Service Connection Charge For Samuktala Z-I P/H No.I BILL/00902/2023-2024 BP-2023-24-222 13/07/2023 WBSEDCL 1.54 0.00 0 0
38 ALIPURDUAR Northern Mechanical Division II AUGMENTATION OF SAMUKTALA PIPED WATER SUPPLY SCHEME , SM/12561 Augmentation Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for Augmentation of SAMUKTALA water supply scheme, TW no I AND II OF ZONE-I , TW no I AND II OF ZONE-II , TW no I AND II OF ZONE-III under Jal Jeevan Mission under NMD-II, PHE Dte.APD. Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 2,Alipurduar Mechanical sub-division,PH ORD/000002/2023-2024 759/NMD-II 04/04/2023 30 AHALYA ENGINEERING WORKS 63.40 54.42 85.84 40
Total 1,328.29 1,039.52 78.26