Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 142.06 57.84 40.72  
1 ALIPURDUAR Alipurduar Division AUGMENTATION OF TOTOPARA AREA PIPED WATER SUPPLY SCHEME , SM/11765 Augmentation Laying of overground distribution system by using HDPE pipes under Augmentation of Totopara PWSS under Alipurduar Division PHE Dte. Birpara A.E RWS Madarihat - Birpara Block ORD/000001/2023-2024 04/ALD 04/04/2023 60 DULAL DAS 39.82 39.61 99.47 100
2 ALIPURDUAR Alipurduar Division AUGMENTATION OF TOTOPARA AREA PIPED WATER SUPPLY SCHEME , SM/11765 Augmentation Sinking of Big dia Tube Well (250 x 200 x 150 mm dia) by Modified DTH - ODEX of drilling for Aug. of Totopara PWSS within Madarihat-Birpara Block of RWS SUB-Division under Alipurduar Division, PHE Dte.(SM/11765) Alipurduar RWS JUNIOR ENGINEER ORD/000236/2024-2025 2296/ALD 07/08/2024 30 EFFLUENT AND WATERTREATMENT ENGINEERS PVT LTD 27.04 0.00 0 0
3 ALIPURDUAR Alipurduar Division AUGMENTATION OF TOTOPARA AREA PIPED WATER SUPPLY SCHEME , SM/11765 Augmentation Construction of intake structure ground level reservoir, boundary wall, Pump House, laying of distribution network and providing FHTC under Augmentation of Totopara PWSS under Alipurduar Division, PHE Dte. Alipurduar RWS,Birpara A.E JUNIOR ENGINEER ORD/000352/2023-2024 2604/ALD 04/12/2023 300 DULAL DAS 63.10 6.13 9.71 35
4 ALIPURDUAR Northern Mechanical Division II AUGMENTATION OF TOTOPARA AREA PIPED WATER SUPPLY SCHEME , SM/11765 Augmentation Supply, installation, commissioning and Trial operation of Electro Mechanical components of TOTOPARA Water Supply Scheme TW No.-IV under NMD-II,PHE Dte Alipurduar. Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 2,Alipurduar Mechanical sub-division,PH ORD/000756/2021-2022 69/NMD-II 24/01/2022 30 SUNLIT 7.57 7.57 100 0
5 ALIPURDUAR Northern Mechanical Division II AUGMENTATION OF TOTOPARA AREA PIPED WATER SUPPLY SCHEME , SM/11765 Augmentation Supply, delivery and installation of 15 KVA servo motor operated Copper wound line voltage corrector at TOTOPARA Water Supply Scheme TW No.-III under NMD-II, PHE.Dte, Alipurduar. Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 2,Alipurduar Mechanical sub-division,PH ORD/000762/2021-2022 1096/NMD-II 20/09/2021 30 SUNLIT 2.38 2.38 100 0
6 ALIPURDUAR Northern Mechanical Division II AUGMENTATION OF TOTOPARA AREA PIPED WATER SUPPLY SCHEME , SM/11765 Augmentation Supply, delivery & installation of 15 KVA, Servo Motor operated Copper wound line voltage stabilizer of Totopara Water Supply Scheme TW No.-IV under NMD-II, PHE. Dte, Alipurduar. Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 2,Alipurduar Mechanical sub-division,PH ORD/000881/2021-2022 1374/NMD-II 22/12/2021 30 SANJIB SAHA 2.15 2.15 100 0
Total 142.05 57.84 40.72