Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
15 659.86 403.64 61.17  
1 ALIPURDUAR Alipurduar - II Alipurduar Division BRAJERKUTHI PIPED WATER SUPPLY SCHEME , SM/13300 New Road Restoration of Volka Road against Brajerkuthi PWSS BILL/00320/2024-2025 189/24-25/PFMS 10/09/2024 EXECUTIVE ENGINEER, ALIPURDUAR DIVISION 10.73 0.00 0 0
2 ALIPURDUAR Alipurduar - II Alipurduar Division BRAJERKUTHI PIPED WATER SUPPLY SCHEME , SM/13300 New Providing balance FHTC for Brajerkuthi PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division Alipurduar Sub Division ORD/000209/2023-2024 1563/ALD 23/08/2023 45 TAPASH KUMAR BHOWMICK 6.25 0.00 0 0
3 ALIPURDUAR Alipurduar - II Alipurduar Division BRAJERKUTHI PIPED WATER SUPPLY SCHEME , SM/13300 New Supply of CIDF & CISS Pipes and specials for Brajerkuti WSS Under Alipurduar Division P.H.E Dte. Alipurduar Sadar Sub Division Birpara Sub Division ORD/000230/2023-2024 1602/ALD 25/08/2023 30 TAPASH KUMAR BHOWMICK 6.76 6.76 100 99
4 ALIPURDUAR Alipurduar - II Alipurduar Division BRAJERKUTHI PIPED WATER SUPPLY SCHEME , SM/13300 New Laying of new UPVC / DI pipeline for filling of Gap in the distribution system and laying of delivery line connection, Land Development works, Construction of surface drain, supply of CIDF specials and other allied works in connection with the Brajerkuti PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division Alipurduar Sub Division ORD/000349/2023-2024 2601/ALD 04/12/2023 90 TAPASH KUMAR BHOWMICK 77.06 26.26 34.08 25
5 ALIPURDUAR Alipurduar - II Alipurduar Division BRAJERKUTHI PIPED WATER SUPPLY SCHEME , SM/13300 New Cons. of pump house and Sinking of 250 mm x 200 mm X 150 mtr. Big dia. TW at HW site and 2nd site, LDS with UPVC pipeline, Cons. of 200 Cum OHR as per Departmental Design and drawing inclu. Soil testing, providing FHTC and others allied works for Brajerkuthi PWSS Under Alipurduar Division PHE DTE. Alipurduar Sadar Sub Division Alipurduar Sub Division ORD/000428/2022-2023 2855/ALD 17/01/2023 180 TAPASH KUMAR BHOWMICK 460.44 361.98 78.62 90
6 ALIPURDUAR Alipurduar - II Alipurduar Division BRAJERKUTHI PIPED WATER SUPPLY SCHEME , SM/13300 New Continuation for the work of Hiring of Additional Diesel Vehicle Maxi Cab(At least 7 seater ) for inspection and monitoring of Jal Jeevan Mission (JJM) works under Alipurduar Division, P.H.E. Dte.(from 01.11.2023 to 31.01.2024) HQ-A.E ORD/000456/2023-2024 2340/ALD 30/10/2023 90 NIRANJAN KIRTANIA 0.50 0.00 0 0
7 ALIPURDUAR Alipurduar - II Alipurduar Division BRAJERKUTHI PIPED WATER SUPPLY SCHEME , SM/13300 New Continuation for the work of Supply of fuel for Additional Diesel Vehicle Maxi Cab(At least 7 seater ) for inspection and monitoring of Jal Jeevan Mission (JJM) works under Alipurduar Division, P.H.E. Dte.(from 01.11.2023 to 31.01.2024) HQ-A.E ORD/000457/2023-2024 2341/ALD 30/10/2023 90 NIRANJAN KIRTANIA 0.70 0.00 0 0
8 ALIPURDUAR Alipurduar - II Alipurduar Division BRAJERKUTHI PIPED WATER SUPPLY SCHEME , SM/13300 New Supply of CIDF/CIPE Pipes and Special & CI Jeffy Coupling for Brajerkuthi Water Supply Scheme under Alipurduar Division P.H.E. Dte. Alipurduar Sadar Sub Division Birpara Sub Division ORD/000484/2023-2024 740/ALD 12/03/2024 30 TAPASH KUMAR BHOWMICK 17.30 0.00 0 51
9 ALIPURDUAR Alipurduar - II Alipurduar Division BRAJERKUTHI PIPED WATER SUPPLY SCHEME , SM/13300 New Material Requisition To Resource Division RTOR000036/2023-2024 1474/ALD 16/08/2023 Resource Division 38.52 0.00 0 0
10 ALIPURDUAR Alipurduar - II Alipurduar Division BRAJERKUTHI PIPED WATER SUPPLY SCHEME , SM/13300 New Material Requisition To Resource Division RTOR000117/2023-2024 141/ALD 10/01/2024 Resource Division 11.38 0.00 0 0
11 ALIPURDUAR Alipurduar - II Northern Mechanical Division II BRAJERKUTHI PIPED WATER SUPPLY SCHEME , SM/13300 New New Service Connection for Brajerkuti PWSS P/HNo-I BILL/02311/2023-2024 BP-2023-24-493 21/12/2023 WBSEDCL 0.71 0.00 0 0
12 ALIPURDUAR Alipurduar - II Northern Mechanical Division II BRAJERKUTHI PIPED WATER SUPPLY SCHEME , SM/13300 New New Service Connection For Brajerkuthi PWSS P/H No-II BILL/02312/2023-2024 BP-2023-24-492 21/12/2023 WBSEDCL 0.71 0.00 0 0
13 ALIPURDUAR Alipurduar - II Northern Mechanical Division II BRAJERKUTHI PIPED WATER SUPPLY SCHEME , SM/13300 New Additional quotation For Brajerkuthi P/H No.I BILL/02444/2023-2024 BP-2023-24-560 19/01/2024 WBSEDCL 4.21 0.00 0 0
14 ALIPURDUAR Alipurduar - II Northern Mechanical Division II BRAJERKUTHI PIPED WATER SUPPLY SCHEME , SM/13300 New Additional service Connection Charge for Brajerkuthi Ph No.II BILL/02445/2023-2024 BP-2023-24-559 19/01/2024 WBSEDCL 6.00 0.00 0 0
15 ALIPURDUAR Alipurduar - II Northern Mechanical Division II BRAJERKUTHI PIPED WATER SUPPLY SCHEME , SM/13300 New Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for Brajerkuthi water supply scheme, TW no I and II of under Northern Mechanical Division-II, PHE Dte.APD Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 2,Alipurduar Mechanical sub-division,PH ORD/000801/2023-2024 2377/NMD-II 09/08/2023 30 SARKAR ELECTRIC 18.59 8.64 46.48 90
Total 659.86 403.64 61.17