Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
13 1,657.87 205.79 12.41  
1 ALIPURDUAR Alipurduar - I Northern Mechanical Division II SIDHABARI PIED WATER SUPPLY SCHEME , SM/10175 New Quotation for new service connection at SIDHABARI P/H NO-II VCH/001310/2022-2023 null 27/09/2022 WBSEDCL 1.75 0.00 0 0
2 ALIPURDUAR Alipurduar - I Northern Mechanical Division II SIDHABARI PIED WATER SUPPLY SCHEME , SM/10175 New Quotation for new connection of Sidahabari PWSS P/H no-I, Application no. 4002994696, Ref: 402875912 VCH/001423/2022-2023 BP-71/22-23 30/09/2022 WBSEDCL 1.75 0.00 0 0
3 ALIPURDUAR Alipurduar - I Northern Mechanical Division II SIDHABARI PIED WATER SUPPLY SCHEME , SM/10175 New Quotation for new connection of Sidahabari W/Ss P/H no-II, Application no. 4002994719, Ref: 402875931 VCH/001422/2022-2023 BP-70/22-23 30/09/2022 WBSEDCL 1.75 0.00 0 0
4 ALIPURDUAR Alipurduar - I Northern Mechanical Division II SIDHABARI PIED WATER SUPPLY SCHEME , SM/10175 New Quotation for new service connection at SIDHABARI P/H NO-I VCH/001311/2022-2023 null 27/09/2022 WBSEDCL 1.75 0.00 0 0
5 ALIPURDUAR Alipurduar - I Alipurduar Division SIDHABARI PIED WATER SUPPLY SCHEME , SM/10175 New Construction of 250cum OHR for Sidhabari Water Supply Scheme under Alipurduar Division, PHE Dte. Alipurduar RWS Birpara Sub Division ORD/000418/2021-2022 2585/ALD 17/02/2022 180 MS CTR CONSTRUCTION 57.53 35.97 62.52 55
6 ALIPURDUAR Alipurduar - I Alipurduar Division SIDHABARI PIED WATER SUPPLY SCHEME , SM/10175 New Laying of HDPE and distribution pipes in different suitable locations of Sidhabari PWSS under Alipurduar Division, PHE Dte. Alipurduar RWS Birpara Sub Division ORD/000453/2022-2023 2970/ALD 31/01/2023 90 BILTU DAS 165.16 58.58 35.47 35
7 ALIPURDUAR Alipurduar - I Northern Mechanical Division II SIDHABARI PIED WATER SUPPLY SCHEME , SM/10175 New Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for SIDHABARI water supply scheme, TW no II in the district of Alipurduar under Northern Mechanical Division-II, Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 2,Alipurduar Mechanical sub-division,PH ORD/000827/2022-2023 489/NMD-II 02/03/2023 30 MITRA ENTERPRISE 9.85 7.53 76.45 50
8 ALIPURDUAR Alipurduar - I Northern Mechanical Division II SIDHABARI PIED WATER SUPPLY SCHEME , SM/10175 New Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for Sidhabari water supply scheme, TW no I in the district of Alipurduar under Northern Mechanical Division-II, PHE Dte. APD. Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 2,Alipurduar Mechanical sub-division,PH ORD/000867/2022-2023 674/NMD-II 27/03/2023 30 SOUMEN ELECTRIC 9.87 0.00 0 0
9 ALIPURDUAR Alipurduar - I Alipurduar Division SIDHABARI PIED WATER SUPPLY SCHEME , SM/10175 New Construction of Pump House, Boundary Wall, Tube well Boring by Reverse Rotary Method of drilling including providing FHTC and Rising main for SIDHABARI Piped Water Supply Scheme Under Alipurduar Division PHE DTE Alipurduar RWS Birpara Sub Division ORD/000005/2022-2023 15/ALD 01/04/2022 120 BILTU DAS 181.30 102.74 56.67 56
10 ALIPURDUAR Alipurduar - I Alipurduar Division SIDHABARI PIED WATER SUPPLY SCHEME , SM/10175 New Carrying of different dia AC pipes from Alipurduar Stackyard and withdrawing CI pipes at Alipurduar Sadar Sub-Division under Alipurduar Division, PHE Dte. HQ-A.E RWS Kalchini Block ORD/000094/2022-2023 458/ALD 13/05/2022 30 ALIPURDUAR CO-OPERATIVE LABOUR CONTRUCT & CONSTRUCTION SOCIETY LTD. 0.99 0.00 0 58.14
11 ALIPURDUAR Alipurduar - I Alipurduar Division SIDHABARI PIED WATER SUPPLY SCHEME , SM/10175 New Supply of different materials for Alipurduar Divisional Stack Yard under Alipurduar Division, PHE Dte. HQ-A.E RWS Kalchini Block ORD/000495/2021-2022 939/ALD 08/09/2021 30 EXECUTIVE ENGINEER, RESOURCE DIVISION 1,200.00 0.00 0 0
12 ALIPURDUAR Alipurduar - I Alipurduar Division SIDHABARI PIED WATER SUPPLY SCHEME , SM/10175 New Preparation of detailed D.P.R. booklets in connection to Sidhabari PWSS under Alipurduar-I Block under Alipurduar Division P.H.E Dte. Alipurduar RWS Birpara Sub Division ORD/000418/2022-2023 2821/ALD 11/01/2023 30 ANIK BHATTACHARJEE 0.97 0.97 100 56
13 ALIPURDUAR Alipurduar - I Alipurduar Division SIDHABARI PIED WATER SUPPLY SCHEME , SM/10175 New Material Requisition To Resource Division RTOR000016/2022-2023 827/ALD 28/06/2022 Resource Division 25.20 0.00 0 0
Total 1,657.87 205.80 12.41