H2- Exception Report on Scheme

Update Data
Rs. in Lakh
Sl. No. Division District Block Scheme Name Scheme Category Sub Division Name of AE entrusted Name of JE entrusted Date of Sanction Date of Commencement Target Date of Completion Date Of Updation Work Order Issued FHTCs Sanctioned Cost Payment Physical Progress (in %) Financial Progress (in %)
99 1,085 2,65,186 45,618.61 16,524.89   36
1 Burdwan Division PURBA BARDHAMAN Kalna - I Providing Functional Household Tap Connection (FHTC) under the command area of Dharma Danga Piped Water Supply Scheme,SM/07545 Retrofitting Kalna Sub-division Assistant Engineer 31/12/2020 08/02/2022 31/12/2023 12/06/2023 11 1,555 73.51 49.98 80 68
2 Burdwan Division PURBA BARDHAMAN Jamalpur Providing Functional Household Tap Connection (FHTC) under the command area of Itla Piped Water Supply Scheme,SM/07549 Retrofitting Burdwan Division AE(HQs) 31/12/2020 08/02/2022 31/12/2023 12/06/2023 7 1,744 82.44 24.88 75 30
3 Burdwan Division PURBA BARDHAMAN Manteswar Providing Functional Household Tap Connection (FHTC) under the command area of Shushuni Piped Water Supply Scheme ,SM/07557 Retrofitting Kalna Sub-division Assistant Engineer 31/12/2020 08/02/2022 31/12/2023 12/06/2023 8 1,153 74.73 39.31 75 53
4 Burdwan Division PURBA BARDHAMAN Jamalpur Providing Functional Household Tap Connection (FHTC) by retrofitting withinthe command area of Gopikantapur Piped Water Supply Scheme at Jamalpur Block,SM/07775 Retrofitting Burdwan Division AE(HQs),Assistant Engineer 08/01/2021 08/02/2022 31/12/2023 12/06/2023 13 2,550 120.55 54.50 75 45
5 Burdwan Division PURBA BARDHAMAN Jamalpur Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Balarampur Piped Water Supply Scheme at Jamalpur Block,SM/07776 Retrofitting Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. RWS_JAMALPUR 08/01/2021 08/02/2022 31/12/2023 12/06/2023 7 2,615 123.62 35.96 65 29
6 Burdwan Division PURBA BARDHAMAN Bhatar Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gramdihi Piped Water Supply Scheme at Bhatar Block,SM/07777 Retrofitting Kalna Sub-division Assistant Engineer 08/01/2021 08/02/2022 31/12/2023 12/06/2023 8 2,118 100.12 71.33 60 71
7 Burdwan Division PURBA BARDHAMAN Bhatar Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Eruar Piped Water Supply Scheme at Bhatar Block,SM/07780 Retrofitting Durgapur Sub-DIvision Assistant Engineer, Durgapur Sub Division, P.H.E. Dte 08/01/2021 08/02/2022 31/12/2023 12/06/2023 14 5,098 297.21 129.70 70 44
8 Burdwan Division PURBA BARDHAMAN Jamalpur Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Mahishgaria Piped Water Supply Scheme at Jamalpur Block,SM/07799 Retrofitting Burdwan Division AE(HQs) 07/01/2021 08/02/2022 31/12/2023 12/06/2023 2 1,431 67.65 16.66 95 25
9 Burdwan Division PURBA BARDHAMAN Mangolkote Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Gopalpur Piped Water Supply Scheme,SM/07800 Retrofitting Katwa Sub-division Assistant Engineer 07/01/2021 08/02/2022 31/12/2023 12/06/2023 5 1,910 90.29 20.01 80 22
10 Burdwan Division PURBA BARDHAMAN Jamalpur Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Sahhosenpur Piped Water Supply Scheme at Jamalpur Block,SM/07813 Retrofitting Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. RWS_JAMALPUR 08/01/2021 08/02/2022 31/12/2023 12/06/2023 18 2,942 139.08 72.79 80 52
11 Burdwan Division PURBA BARDHAMAN Bhatar Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Orgram Piped Water Supply Scheme at Bhatar Block,SM/07814 Retrofitting Durgapur Sub-DIvision Assistant Engineer, Durgapur Sub Division, P.H.E. Dte 08/01/2021 08/02/2022 31/12/2023 12/06/2023 9 4,050 191.46 79.26 70 41
12 Burdwan Division PURBA BARDHAMAN Jamalpur Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kanshra Piped Water Supply Scheme at Jamalpur Block,SM/07816 Retrofitting Burdwan Division AE(HQs) 08/01/2021 08/02/2022 31/12/2023 12/06/2023 17 2,307 109.06 86.03 80 79
13 Burdwan Division PURBA BARDHAMAN Memari - I Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Alipur Piped Water Supply Scheme,SM/07819 Retrofitting Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE 08/01/2021 08/02/2022 31/12/2023 12/06/2023 3 3,993 257.15 18.82 80 7
14 Burdwan Division PURBA BARDHAMAN Raina - II Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Keunta Piped Water Supply Scheme,SM/07820 Retrofitting Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. 08/01/2021 08/02/2022 31/12/2023 12/06/2023 12 2,176 141.29 96.44 80 68
15 Burdwan Division PURBA BARDHAMAN Memari - I Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Ghosh Piped Water Supply Scheme,SM/07821 Retrofitting Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE 08/01/2021 08/02/2022 31/12/2023 12/06/2023 7 1,654 105.81 57.85 80 55
16 Burdwan Division PURBA BARDHAMAN Burdwan - II Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Suhari Piped Water Supply Scheme,SM/07823 Retrofitting Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. 08/01/2021 08/02/2022 31/12/2023 12/06/2023 15 2,579 151.83 53.98 75 36
17 Burdwan Division PURBA BARDHAMAN Purbasthali - II Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Krishnabati Piped Water Supply Scheme at Purbasthali-II Block,SM/07827 Retrofitting Kalna Sub-division Assistant Engineer 08/01/2021 08/02/2022 31/12/2023 03/10/2023 2 1,969 126.36 95.04 90 75
18 Burdwan Division PURBA BARDHAMAN Bhatar Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Serua Piped Water Supply Scheme at Bhatar Block,SM/07828 Retrofitting Durgapur Sub-DIvision Assistant Engineer, Durgapur Sub Division, P.H.E. Dte 08/01/2021 08/02/2022 31/12/2023 12/06/2023 12 3,257 261.00 133.26 70 51
19 Burdwan Division PURBA BARDHAMAN Jamalpur Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of SIALI Piped Water Supply Scheme at Jamalpur Block,SM/07856 Retrofitting Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. RWS_JAMALPUR 14/01/2021 08/02/2022 31/12/2023 12/06/2023 17 2,730 129.06 76.39 80 59
20 Burdwan Division PURBA BARDHAMAN Burdwan - I Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ISUFABAD Piped Water Supply Scheme ,SM/07860 Retrofitting Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. 14/01/2021 08/02/2022 31/12/2023 12/06/2023 7 1,853 115.29 14.63 80 13
21 Burdwan Division PURBA BARDHAMAN Jamalpur Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of ABUJHATI Piped Water Supply Scheme at Jamalpur Block,SM/07861 Retrofitting Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. RWS_JAMALPUR 14/01/2021 08/02/2022 31/12/2023 12/06/2023 15 3,926 253.82 159.44 80 63
22 Burdwan Division PURBA BARDHAMAN Jamalpur Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of MADHABPUR Piped Water Supply Scheme ,SM/07862 Retrofitting Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. RWS_JAMALPUR 14/01/2021 08/02/2022 31/12/2023 12/06/2023 22 2,107 136.50 97.49 80 71
23 Burdwan Division PURBA BARDHAMAN Burdwan - I Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of KHETIA Piped Water Supply Scheme ,SM/07863 Retrofitting Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. 14/01/2021 08/02/2022 31/12/2023 12/06/2023 10 2,164 125.64 61.85 55 49
24 Burdwan Division PURBA BARDHAMAN Burdwan - II Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of NABASTHA Piped Water Supply Scheme ,SM/07864 Retrofitting Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. 14/01/2021 08/02/2022 31/12/2023 12/06/2023 13 2,535 148.07 124.66 80 84
25 Burdwan Division PURBA BARDHAMAN Bhatar Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Kashipur Piped Water Supply Scheme at Bhatar Block,SM/07868 Retrofitting Durgapur Sub-DIvision Assistant Engineer, Durgapur Sub Division, P.H.E. Dte 14/01/2021 08/02/2022 31/12/2023 12/06/2023 15 3,050 249.54 45.28 50 18
26 Burdwan Division PURBA BARDHAMAN Bhatar Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of BALGANA Piped Water Supply Scheme at Bhatar Block,SM/07871 Retrofitting Durgapur Sub-DIvision Assistant Engineer, Durgapur Sub Division, P.H.E. Dte 14/01/2021 08/02/2022 31/12/2023 12/06/2023 15 3,125 255.84 52.20 59 20
27 Burdwan Division PURBA BARDHAMAN Purbasthali - II Providing Functional Household Tap Connection (FHTC) by retrofitting along with intake jetty protection and minor repair of WTP at Surface Water Based Piped Water Supply Scheme for Arsenic affected areas of Purbasthali-II Block,SM/08030 Retrofitting Kalna Sub-division Assistant Engineer 25/01/2021 08/02/2022 31/12/2023 12/06/2023 21 34,987 1,902.40 1,473.57 45 77
28 Burdwan Division PURBA BARDHAMAN Memari - I Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of RASULPUR Piped Water Supply Scheme,SM/08031 Retrofitting Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE 25/01/2021 08/02/2022 31/12/2023 12/06/2023 8 5,077 301.39 180.40 30 60
29 Burdwan Division PURBA BARDHAMAN Bhatar Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme Block-Bhatar,SM/08033 Retrofitting Durgapur Sub-DIvision Assistant Engineer, Durgapur Sub Division, P.H.E. Dte 25/01/2021 08/02/2022 30/09/2024 18/04/2024 30 6,580 1,100.67 350.38 70 32
30 Burdwan Division PURBA BARDHAMAN Jamalpur Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Nabagram Piped Water Supply Scheme at Jamalpur Block,SM/08101 Retrofitting Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. RWS_JAMALPUR 19/02/2021 08/02/2022 31/12/2023 12/06/2023 7 6,182 402.29 149.73 55 37
31 Burdwan Division PURBA BARDHAMAN Burdwan - I Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Rayan Piped Water Supply Scheme,SM/08102 Retrofitting Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. 19/02/2021 08/02/2022 31/12/2023 12/06/2023 9 8,834 489.24 184.99 60 38
32 Burdwan Division PURBA BARDHAMAN Purbasthali - I Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Srirampur Piped Water Supply Scheme, Purbasthali-I, Purba Bardhaman,SM/08103 Retrofitting Kalna Sub-division Assistant Engineer 19/02/2021 08/02/2022 31/12/2023 12/06/2023 8 5,112 331.60 173.77 60 52
33 Burdwan Division PURBA BARDHAMAN Kalna - I Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Nandai and adj.Mouzas Piped Water Supply Scheme, Block Kalna-I, District Purba Bardhaman,SM/08104 Retrofitting Kalna Sub-division Assistant Engineer 19/02/2021 08/02/2022 31/12/2023 12/06/2023 13 5,704 365.23 167.16 60 46
34 Burdwan Division PURBA BARDHAMAN Bhatar Retrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the command area of of Amarun Piped Water Supply Scheme, Block Bhatar, District Purba Bardhaman,SM/08105 Retrofitting Durgapur Sub-DIvision Assistant Engineer, Durgapur Sub Division, P.H.E. Dte 19/02/2021 08/02/2022 31/12/2023 12/06/2023 17 5,098 311.16 140.93 40 45
35 Burdwan Division PURBA BARDHAMAN Jamalpur Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of AJHAPUR Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE.,SM/08701 Retrofitting Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. RWS_JAMALPUR 03/09/2021 08/02/2022 31/12/2023 12/06/2023 13 5,237 505.33 87.01 70 17
36 Burdwan Division PURBA BARDHAMAN Jamalpur Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of Antpara Piped Water Supply Scheme at Jamalpur Block under Burdwan Division, P.H.E. DTE.,SM/08703 Retrofitting Burdwan Division AE(HQs) JE/RWS/JAMALPUR 03/09/2021 08/02/2022 31/12/2023 12/06/2023 26 3,098 196.29 68.65 75 35
37 Burdwan Division PURBA BARDHAMAN Memari - I Providing Functional House hold Tap Connection (FHTC) by retrofitting within the command area of Bagila piped Water Supply Scheme at Memari-I Block under Burdwan Division, P.H.E. DTE.,SM/08704 Retrofitting Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE 03/09/2021 08/02/2022 31/12/2023 12/06/2023 11 4,909 267.25 114.72 75 43
38 Burdwan Division PURBA BARDHAMAN Kalna - I Providing Functional House hold Tap Connection (FHTC) by retrofitting at Jotshyam, Jurepar, Kadipur, Medgachi, Muragachha, Naopara, Ramanandapur mouzas within the command area of Manikhar piped Water Supply Scheme at Mangolkote Block under Burdwan Divisio,SM/08712 Retrofitting Kalna Sub-division Assistant Engineer 03/09/2021 08/02/2022 31/12/2023 12/06/2023 6 2,643 147.70 82.70 90 56
39 Burdwan Division PURBA BARDHAMAN Burdwan - II Providing Functional Household Tap connection (FHTC) by retrofitting within the command area of PALSIT Piped Water Supply Scheme at BURDWAN-II Block under Burdwan Division, P.H.E. DTE.,SM/08714 Retrofitting Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. 03/09/2021 08/02/2022 30/04/2024 29/02/2024 11 2,879 177.72 91.05 80 51
40 Burdwan Division PURBA BARDHAMAN Memari - II AUGMENTATION OF GROUND WATER BASED PARHATI PWSS TO ACCOMMODATE FHTC IN MEMARI-II BLOCK UNDER KATWA SUB DIVISION OF BURDWAN DIVISION IN PURBA BURDWAN DISTRICT,SM/08998 Augmentation Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER RWS BURDWAN SUB-DIVISION PHE DTE 29/10/2021 08/02/2022 30/04/2024 13/03/2024 9 2,744 497.47 394.80 99 79
41 Burdwan Division PURBA BARDHAMAN Jamalpur Providing Functional Household Tap Connection (FHTC) by retrofitting within the command area of Jaugram piped Water Supply Scheme at Jamalpur Block under Burdwan Division PHE. DTE.,SM/09104 Retrofitting Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. RWS_JAMALPUR 28/10/2021 08/02/2022 31/12/2023 12/06/2023 20 4,335 245.18 71.30 60 29
42 Burdwan Division PURBA BARDHAMAN Kalna - II Augmentation of ANUKHAL PWSS for providing Functional Household Tap Connection (FHTC) KALNA-II block under KALNA Sub Division of Burdwan Division in Purba Bardhaman District,SM/09403 Augmentation Kalna Sub-division Assistant Engineer 17/11/2021 08/02/2022 31/12/2023 12/06/2023 12 657 651.77 343.24 40 53
43 Burdwan Division PURBA BARDHAMAN Raina - I Augmentation of ground water based SEHARA PWSS to accommodate FHTC in RAINA-I Block under Burdwan Suv Division of Burdwan Division in Purba Bardhaman,SM/09408 Augmentation Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. 17/11/2021 08/02/2022 30/09/2024 13/03/2024 10 2,829 495.29 375.93 65 76
44 Burdwan Division PURBA BARDHAMAN Purbasthali - I DETAILED PROJECT REPORT FOR AUGMENTATION SAMUDRAGARH PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK PURBASTHALI-I PURBA BARDHAMAN WEST BENGAL,SM/09409 Augmentation Kalna Sub-division Assistant Engineer 17/11/2021 08/02/2022 30/06/2024 13/03/2024 13 3,783 532.80 318.28 80 60
45 Burdwan Division PURBA BARDHAMAN Purbasthali - I Augmentation of Ganganandapur PWSS for providing FHTC.,SM/09411 Augmentation Kalna Sub-division Assistant Engineer 17/11/2021 08/02/2022 31/10/2024 13/03/2024 20 2,940 808.85 479.36 65 59
46 Burdwan Division PURBA BARDHAMAN Purbasthali - I Augmentation of CHAMPAHATI PWSS for providing functional household tap connection FHTC in Purbasthali-I block under Burdwan Division in Purba Bardhaman District,SM/09416 Augmentation Kalna Sub-division Assistant Engineer 17/11/2021 08/02/2022 31/05/2024 13/03/2024 13 1,935 563.41 296.43 85 53
47 Burdwan Division PURBA BARDHAMAN Khandaghosh AUGMENTATION OF GROUND WATER BASED SAGRIA PWSS TO ACCOMMODATE FHTC IN KHANDOGHOSH BLOCK UNDER BURDWAN SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT ,SM/09492 Augmentation Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE 19/11/2021 08/02/2022 30/06/2024 13/03/2024 9 3,020 586.55 469.25 95 80
48 Burdwan Division PURBA BARDHAMAN Raina - I Augmentation of ground water based RAINA PWSS to accommodate FHTC in Raina-I block under Burdwan Sub Division of Burdwan Division in Purba Bardhaman District ,SM/09493 Augmentation Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER 19/11/2021 03/03/2022 31/08/2024 13/03/2024 12 2,087 371.84 277.45 80 75
49 Burdwan Division PURBA BARDHAMAN Purbasthali - II Augmentation of Sajiara PWSS for providing FHTC under Baurdwan Division.,SM/09716 Augmentation Kalna Sub-division Assistant Engineer 26/11/2021 03/04/2023 31/03/2024 13/03/2024 19 2,772 652.10 40.08 98 6
50 Burdwan Division PURBA BARDHAMAN Manteswar Augmentation of Kaigram PWSS for providing Functional House Hold Tap Connection (FHTC),SM/09717 Augmentation Kalna Sub-division Assistant Engineer 26/11/2021 08/02/2022 31/05/2024 13/03/2024 15 1,762 530.67 254.09 90 48
51 Burdwan Division PURBA BARDHAMAN Extension of PWS to Anganwadi Centers (AWCs) located within the command area of PWSS under Burdwan Division. ,SM/10016 Anganwadi Burdwan Sadar Sub-Division Assistant Engineer,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE.,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte 30/12/2021 08/02/2022 31/03/2024 29/02/2024 21 0 471.57 304.45 80 65
52 Burdwan Division PURBA BARDHAMAN Kalna - II AGUMENTATION OF GROUND WATER BASED BAIDYAPUR PWSS TO ACCOMMODATE FHTC IN KALNA-II BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT (ZONE-I & ZONE-II),SM/10032 Augmentation Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 19/01/2022 08/02/2022 30/09/2024 15/07/2024 19 5,865 1,069.93 772.90 77 72
53 Burdwan Division PURBA BARDHAMAN Kalna - I DETAILED PROJECT REPORT FOR AUGMENTATION F GROUND WATER BASED DHATRIGRAM PWSS TO ACCOMMODATE FHTC IN KALNA I BLOCK UNDER KALNA SUB DIVISION OF BURDWAN DIVISION IN PURBA BARDHAMAN DISTRICT,SM/10270 Augmentation Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 25/02/2022 28/02/2022 30/11/2024 19/06/2024 18 6,540 1,096.06 734.39 57 67
54 Burdwan Division PURBA BARDHAMAN Details Project Report on Providing Water Tap Connection in each School (1021 Nos) for 100% School Coverage from existing Distribution system within scheme jurisdiction of different Piped Water Supply Schemes within Purba Bardhaman District under Burdwan ,SM/10378 School Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. 23/03/2022 05/12/2022 31/03/2024 10/08/2023 26 0 130.06 53.47 50 41
55 Burdwan Division PURBA BARDHAMAN Bhatar AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BONPAS KAMARPARA TO ACCOMMODATE FHTC UNDER BHATAR BLOCK IN PURBA BARDHAMAN DISTRICT UNDER BURDWAN DIVISION PHE DTE,SM/10391 Augmentation Durgapur Sub-DIvision ASSISTANT ENGINEER,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte 24/03/2022 30/03/2022 31/03/2024 03/10/2023 11 4,079 942.30 515.14 39 55
56 Burdwan Division PURBA BARDHAMAN Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(290 nos) for 100% School Coverage in Purba Bardhaman within Kalna Sub Division under Burdwan Division P.H.E. DTE.,SM/11283 School Kalna Sub-division Assistant Engineer 28/06/2022 01/03/2023 31/03/2024 09/08/2023 8 0 548.04 197.33 20 36
57 Burdwan Division PURBA BARDHAMAN Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(292 nos) for 100% School Coverage in Purba Bardhaman within Burdwan North Sub Division under Burdwan Division P.H.E. DTE.,SM/11284 School Durgapur Sub-DIvision Assistant Engineer, Durgapur Sub Division, P.H.E. Dte 28/06/2022 01/09/2022 31/03/2023 05/05/2023 8 0 551.82 151.34 0 27
58 Burdwan Division PURBA BARDHAMAN Providing Water Supply Arrangement by Sinking of Tube Well at leftout Primary Schools(359 nos) for 100% School Coverage in Purba Bardhaman within Burdwan South Sub Division under Burdwan Division P.H.E. DTE.,SM/11285 School Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. 28/06/2022 01/09/2022 31/03/2023 05/05/2023 13 0 678.43 409.59 0 60
59 Burdwan Division PURBA BARDHAMAN Jamalpur GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN,SM/11491 New Burdwan Division AE(HQs),ASSISTANT ENGINEER JUNIOR ENGINEER 19/07/2022 08/09/2022 31/03/2024 21/02/2024 15 1,442 457.23 238.51 90 52
60 Burdwan Division PURBA BARDHAMAN Jamalpur GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN,SM/11492 New Burdwan Division AE(HQs),ASSISTANT ENGINEER JUNIOR ENGINEER 19/07/2022 05/08/2022 31/03/2024 21/02/2024 24 2,015 666.43 296.02 77 44
61 Burdwan Division PURBA BARDHAMAN Providing Water Supply Arrangement by Sinking of Tube Well at left out Primary Schools(250 nos) for 100% School Coverage in Purba Bardhaman within Katwa Sub Division under Burdwan Division P.H.E. DTE.,SM/11514 School Katwa Sub-division Assistant Engineer 19/07/2022 15/11/2022 31/05/2023 05/05/2023 10 0 472.45 279.22 0 59
62 Burdwan Division PURBA BARDHAMAN Mangolkote PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) PHASE-II BY AREA OF KASIARA PIPED WATER SUPPLY SCHEME AT MONGALKOTE BLOCK UNDER BURDWAN DIVISION PHE DTE.,SM/12080 Retrofitting Katwa Sub-division Assistant Engineer 02/09/2022 02/12/2022 12/06/2023 6 414 26.74 17.18 80 64
63 Burdwan Division PURBA BARDHAMAN Katwa - I PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BY RETROFITTING (PHASE III) AT KALYANBATI, NARAYANPUR,RADHKRISHNAPUR & SUDPUR MOUZAS WITHIN THE COMMAND AREA OF SUDPUR PIPED WATER SUPPLY SCHEME AND AT KATWA-I BLOCK UNDER KATWA SUB DIVISION WITHIN BUR,SM/12081 Retrofitting Katwa Sub-division Assistant Engineer 02/09/2022 15/12/2022 31/03/2024 29/02/2024 5 1,250 58.96 38.29 50 65
64 Burdwan Division PURBA BARDHAMAN Manteswar GROUND WATER SUPPLY BASED PIPED WATER SUPPLY SCHEME FOR SUTRA PWSS IN MANTESHWAR BLOCK OF PURBA BURDWAN DISTRICT UNDER BURDWAN DIVISION, P.H.E. DTE.,SM/13280 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER,JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE 17/10/2022 15/03/2023 31/03/2024 24/11/2023 11 1,672 575.10 300.50 56 52
65 Burdwan Division PURBA BARDHAMAN Purbasthali - I HARIPUR PIPED WATER SUPPLY SCHEME ,SM/13315 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER,JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE 17/10/2022 23/03/2023 31/05/2024 13/03/2024 9 543 342.07 134.35 71 39
66 Burdwan Division PURBA BARDHAMAN Burdwan - II GROUND WATER BASED KANDARSONA PWSS,SM/13339 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer 17/10/2022 30/01/2023 31/07/2024 13/03/2024 11 1,011 497.29 242.42 90 49
67 Burdwan Division PURBA BARDHAMAN Purbasthali - I ARJUNPUKUR PIPED WATER SUPPLY SCHEME,SM/13413 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER,JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE 02/11/2022 06/04/2023 30/06/2024 13/03/2024 8 1,316 653.36 263.03 77 40
68 Burdwan Division PURBA BARDHAMAN Khandaghosh BICHKHARA PIPED WATER SUPPLY SCHEME ,SM/13422 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer 02/11/2022 17/01/2023 31/03/2024 27/09/2023 9 382 287.39 114.88 78 40
69 Burdwan Division PURBA BARDHAMAN Khandaghosh GUIR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK,SM/13424 New Durgapur Sub-DIvision ASSISTANT ENGINEER,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer,Junior Engineer2, Durgapur Sub-Division, PHE Dte. 02/11/2022 14/04/2023 31/03/2024 21/02/2024 10 2,435 997.78 346.07 71 35
70 Burdwan Division PURBA BARDHAMAN Memari - I SAHAPUR PIPED WATER SUPPLY SCHEME,SM/13425 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer,JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE 02/11/2022 10/01/2023 31/03/2024 13/03/2024 9 1,188 572.23 270.45 88 47
71 Burdwan Division PURBA BARDHAMAN Khandaghosh PUNSHUR PIPED WATER SUPPLY SCHEME IN KHANDOGHOSH BLOCK,SM/13450 New Durgapur Sub-DIvision ASSISTANT ENGINEER,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer,Junior Engineer2, Durgapur Sub-Division, PHE Dte. 02/11/2022 12/01/2023 31/03/2024 21/02/2024 12 800 450.26 153.13 61 34
72 Burdwan Division PURBA BARDHAMAN Memari - II NOAHATI PIPED WATER SUPPLY SCHEME ,SM/13452 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer,JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE 02/11/2022 15/03/2023 31/07/2024 13/03/2024 9 1,938 921.11 31.64 74 3
73 Burdwan Division PURBA BARDHAMAN Memari - II KUCHUT PIPED WATER SUPPLY SCHEME,SM/13464 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer,JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE 02/11/2022 15/03/2023 30/04/2024 13/03/2024 15 2,306 910.64 326.77 88 36
74 Burdwan Division PURBA BARDHAMAN Khandaghosh KHUNDKURI PIPED WATER SUPPLY SCHEME,SM/13465 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer,JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE 02/11/2022 17/03/2023 30/07/2024 13/03/2024 11 2,692 992.74 332.05 74 33
75 Burdwan Division PURBA BARDHAMAN Purbasthali - I LAKSHAMPUR PIPED WATER SUPPLY SCHEME,SM/13493 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 02/11/2022 29/03/2023 30/04/2024 13/03/2024 10 182 146.50 46.27 69 32
76 Burdwan Division PURBA BARDHAMAN Raina - II GROUND WATER BASED CHAK BATASPURR SINGLE VILLAGE PIPED WATER SUPPPLY SCHEME ,SM/13495 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER 02/11/2022 11/05/2023 30/06/2024 13/03/2024 8 320 213.85 60.04 65 28
77 Burdwan Division PURBA BARDHAMAN Bhatar BALSIDANGA PIPED WATER SUPPLY SCHEME,SM/13904 New Durgapur Sub-DIvision ASSISTANT ENGINEER,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER 29/11/2022 25/03/2023 22/08/2024 15/07/2024 11 319 245.44 61.36 57 25
78 Burdwan Division PURBA BARDHAMAN Khandaghosh CHAGRAM PIPED WATER SUPPLY SCHEME,SM/13941 New Durgapur Sub-DIvision ASSISTANT ENGINEER,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte Junior Engineer,Junior Engineer2, Durgapur Sub-Division, PHE Dte. 01/12/2022 04/05/2023 31/03/2024 21/02/2024 8 1,984 846.16 263.80 51 31
79 Burdwan Division PURBA BARDHAMAN Bhatar RAMCHANDRAPUR PIPED WATER SUPPLY SCHEME,SM/14909 New Durgapur Sub-DIvision ASSISTANT ENGINEER,Assistant Engineer, Durgapur Sub Division, P.H.E. Dte JUNIOR ENGINEER 04/02/2023 25/08/2023 04/08/2024 15/07/2024 10 1,666 849.53 16.02 4 2
80 Burdwan Division PURBA BARDHAMAN Raina - I MACHKHARA PIPED WATER SUPPLY SCHEME,SM/14967 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER 04/02/2023 06/10/2023 04/08/2024 16/01/2024 8 1,661 878.93 10.68 10 1
81 Burdwan Division PURBA BARDHAMAN Raina - I BHAGABATIPUR PIPED WATER SUPPLY SCHEME,SM/14977 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER 04/02/2023 06/10/2023 04/08/2024 28/12/2023 9 1,708 841.52 5.82 2 1
82 Burdwan Division PURBA BARDHAMAN Mangolkote SITAHATI PIPE WATER SUPPLY SCHEME,SM/15161 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 08/02/2023 05/10/2023 08/08/2024 04/03/2024 9 3,022 784.13 18.34 3 2
83 Burdwan Division PURBA BARDHAMAN Raina - I AUGMENTATION OF SEHERA PWSS IN RAINA-I BLOCK,SM/15173 Augmentation Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. 07/02/2023 29/08/2023 07/08/2023 12/06/2023 2 0 287.77 0.00 0 0
84 Burdwan Division PURBA BARDHAMAN Memari - II AUGMENTATION OF SATGACHIA PWSS (ZONE-I)(PART-B),SM/15178 Augmentation Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer,JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE 07/02/2023 18/08/2023 31/10/2024 13/03/2024 4 0 273.13 3.00 77 1
85 Burdwan Division PURBA BARDHAMAN Jamalpur AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR ABUJHATI,SM/15184 Augmentation Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER,RWS_JAMALPUR 07/02/2023 17/05/2023 31/03/2024 17/07/2023 9 544 220.43 49.32 17 22
86 Burdwan Division PURBA BARDHAMAN Memari - II AUGMENTATION OF BERWA PIPED WATER SUPPLY SCHEME,SM/15568 Augmentation Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER RWS BURDWAN SUB-DIVISION PHE DTE 16/02/2023 28/07/2023 01/07/2024 29/02/2024 4 444 583.85 75.87 5 13
87 Burdwan Division PURBA BARDHAMAN Purbasthali - II AUGMENTATION OF PURBASTHALI SURFACE WATER BASED PWSS ZONE III,SM/15588 Augmentation Kalna Sub-division Assistant Engineer 16/02/2023 17/11/2023 03/03/2024 29/02/2024 4 1,000 793.59 0.00 2 0
88 Burdwan Division PURBA BARDHAMAN Jamalpur AUGMENTATION OF GROUND WATER BASED WATER SUPPLY SCHEME FOR JAUGRAM,SM/15602 Augmentation Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. RWS_JAMALPUR 16/02/2023 01/03/2023 31/03/2024 14/07/2023 4 500 700.54 174.90 50 25
89 Burdwan Division PURBA BARDHAMAN Raina - II AUGUMENTATION OF GROUND WATER BASED PIPE WATER SUPPLY SCHEME FOR KUENTA,SM/15718 Augmentation Burdwan Sadar Sub-Division Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. 20/02/2023 01/03/2023 30/06/2024 13/03/2024 1 140 56.48 0.00 27 0
90 Burdwan Division PURBA BARDHAMAN Ketugram - II KANKURHATI PIPED WATER SUPPLY SCHEME,SM/16031 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 21/02/2023 24/03/2023 31/03/2024 12/03/2024 7 466 251.87 81.86 91 33
91 Burdwan Division PURBA BARDHAMAN Kalna - II DWARIATAN PIPED WATER SUPPLY SCHEME,SM/16285 New Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 23/02/2023 25/08/2023 23/08/2024 09/01/2024 8 1,996 891.16 9.67 3 1
92 Burdwan Division PURBA BARDHAMAN Manteswar RETROFITTING OF MAJHERGRAM PIPED WATER SUPPLY SCHEME(PART-B),SM/16290 Retrofitting Kalna Sub-division Assistant Engineer 23/02/2023 01/06/2023 31/03/2024 24/11/2023 6 600 167.64 30.44 20 18
93 Burdwan Division PURBA BARDHAMAN Purbasthali - II AUGMENTATION OF JHAUDANGA (PART-B) PIPED WATER SUPPLY SCHEME,SM/16293 Augmentation Kalna Sub-division Assistant Engineer JUNIOR ENGINEER 23/02/2023 12/10/2023 23/08/2023 12/06/2023 5 300 252.07 47.80 5 19
94 Burdwan Division PURBA BARDHAMAN Mangolkote PURBA NAYAPARA PIPE WATER SUPPLY SCHEME,SM/16477 New Central Mechanical Sub-Division Assistant Engineer Junior Engineer 02/03/2023 05/10/2023 02/09/2024 04/03/2024 8 1,812 753.31 11.72 3 2
95 Burdwan Division PURBA BARDHAMAN Burdwan - I AUGMENTATION OF RAYAN (PART-II) PWSS,SM/16486 Augmentation Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer 02/03/2023 07/06/2023 31/03/2024 12/06/2023 3 4,085 772.37 5.11 5 1
96 Burdwan Division PURBA BARDHAMAN Mangolkote AUGMENTATION OF MANGALKOT PIPED WATER SUPPLY SCHEME,SM/16487 Augmentation Central Mechanical Sub-Division Assistant Engineer Junior Engineer 02/03/2023 13/04/2023 03/10/2024 12/03/2024 5 2,200 857.85 16.53 5 2
97 Burdwan Division PURBA BARDHAMAN Raina - I NETRAKHANDA PIPED WATER SUPPLY SCHEME,SM/16616 New Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER 14/03/2023 22/12/2023 14/09/2024 28/12/2023 8 1,424 663.07 5.28 5 1
98 Burdwan Division PURBA BARDHAMAN Khandaghosh AUGMENTATION OF GROUND WATER BASED SAGRAI PWSS (PART B),SM/16774 Augmentation Burdwan Sadar Sub-Division ASSISTANT ENGINEER,Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer 13/03/2023 21/03/2023 31/07/2024 03/06/2024 14 0 275.12 57.79 10 21
99 Burdwan Division PURBA BARDHAMAN Kalna - I AUGMENTATION OF SIMLON PWSS FOR PROVIDING FUNCTIONAL HOUSEHOLD TAP CONNECTION (FHTC) BLOCK KALNA I PURBA BARDHAMAN WEST BENGAL,SM/18439 Augmentation 18/07/2023 08/08/2023 18/07/2024 05/01/2024 6 9,130 2,281.19 597.14 29 26
Total 1,085 2,65,186 45,618.61 16,524.89   36