Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 732.74 16.53 2.26  
1 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF MANGALKOT PIPED WATER SUPPLY SCHEME , SM/16487 Augmentation Detail route survey, design of distribution network and preparation of estimate, drawing & DPR for providing FHTC in the scheme MONGALKOTE PWSS (Sl No-06) Assistant Engineer JUNIOR ENGINEER KATWA SUB-DIVISION PHE DTE ORD/000074/2023-2024 399/KTS 13/04/2023 30 SIRCON ENGINEERING SERVICES 2.93 2.93 100 100
2 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF MANGALKOT PIPED WATER SUPPLY SCHEME , SM/16487 Augmentation Extension and replacement of pipe line from the existing Distribution System within scheme jurisdiction at Mongalkote village under Mongalkote PWSS under Mongalkote Block within Katwa Sub-Division under Burdwan Division PHE Dte. [Sl No-01] Assistant Engineer ORD/000153/2022-2023 437/KTS 27/06/2022 30 NANGTASWAR CO. OP. LABOUR CONT. AND CONSTRUCTION SOCIETY LTD. 4.84 4.81 99.38 0
3 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF MANGALKOT PIPED WATER SUPPLY SCHEME , SM/16487 Augmentation Sinking of 300 X 200mm dia Tube Well 200 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Deep Well Screen (RMS) for Augmentation of Mongalkote & Natunhat and its adjoining mouzas Piped Water Supply Scheme, Block - Mongalkote, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer ORD/000517/2022-2023 4658/BWD 18/10/2022 30 ANIRUDDHA FARUQUE 13.24 8.79 66.39 1
4 PURBA BARDHAMAN Burdwan Division AUGMENTATION OF MANGALKOT PIPED WATER SUPPLY SCHEME , SM/16487 Augmentation Augmentation of MANGALKOTE Piped Water Supply Scheme with sinking of Tube-well, LDS, Rising Main, FHTC, Construction of 350 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drain and internal pathway at different TW site under MONGALKOTE Block, District:- Purba-Bardhaman. Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000696/2023-2024 4365/BWD 04/10/2023 365 M/S NATIONAL CONSTRUCTION 689.68 0.00 0 0
5 PURBA BARDHAMAN Central Mechanical AUGMENTATION OF MANGALKOT PIPED WATER SUPPLY SCHEME , SM/16487 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1&2 at Augmentation of Mongolkot Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. Driller In-Charge Junior Engineer ORD/000120/2023-2024 2631/CMD 13/06/2023 30 S.K. ELECTRICALS 22.05 0.00 0 0
Total 732.73 16.53 2.26