Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 1,522.95 0.28 0.02  
1 PURBA BARDHAMAN Raina - I Burdwan Division BHAGABATIPUR PIPED WATER SUPPLY SCHEME , SM/14977 New Continuation Work Order for supply of inspection Vehicle for inspection of different JJM related(schemes)works as and when required including supply of driver & fuel(minimum 8 hours duty per day) and all taxes etc. for Burdwan Sub-Division under Burdwan Division,PHE Dte consider 96.00 Km. run per day (Period from 01-05-2024 to 31-07-2024) JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000108/2024-2025 807/BSD 29/04/2024 66 PARVIN BEGAM 0.85 0.28 32.94 100
2 PURBA BARDHAMAN Raina - I Burdwan Division BHAGABATIPUR PIPED WATER SUPPLY SCHEME , SM/14977 New Different works related (sinking of Tube-wells, LDSs, Rising Mains, FHTCs, Construction of different capacity RCC OHRs each with 20.0 mtr. with Staging height including soil investigation & construction of switch rooms & boundary walls with gates and land development, drains and internal pathways at different TW site) to BHAGABATIPUR, MACHKHARA & UDGARA Piped Water Supply Scheme under Raina ¿ I Block, District:- Purba-Bardhaman [NEW SCHEME] Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. JUNIOR ENGINEER BURDWAN SADAR SUB-DIVISION PHE DTE ORD/000690/2023-2024 4386/BWD 05/10/2023 365 SK ALIM 1,378.97 0.00 0 40
3 PURBA BARDHAMAN Raina - I Burdwan Division BHAGABATIPUR PIPED WATER SUPPLY SCHEME , SM/14977 New Material Requisition To Resource Division RTOR000205/2023-2024 2155/BWD 10/05/2023 Resource Division 5.77 0.00 0 0
4 PURBA BARDHAMAN Raina - I Burdwan Division BHAGABATIPUR PIPED WATER SUPPLY SCHEME , SM/14977 New Material Requisition To Resource Division RTOR000534/2023-2024 4286/BWD 29/09/2023 Resource Division 1.53 0.00 0 0
5 PURBA BARDHAMAN Raina - I Burdwan Division BHAGABATIPUR PIPED WATER SUPPLY SCHEME , SM/14977 New Material Requisition To Resource Division RTOR000656/2023-2024 5101/BWD 23/11/2023 Resource Division 20.46 0.00 0 0
6 PURBA BARDHAMAN Raina - I Central Mechanical BHAGABATIPUR PIPED WATER SUPPLY SCHEME , SM/14977 New New Service connection for BHAGABATIPUR W/S Scheme PH No.-1 BILL/01795/2023-2024 BP-2023-24-312 30/12/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.93 0.00 0 0
7 PURBA BARDHAMAN Raina - I Central Mechanical BHAGABATIPUR PIPED WATER SUPPLY SCHEME , SM/14977 New New electric connection for Bhagabatipur PWSS, PH-1 BILL/01886/2023-2024 BP-2023-24-343 11/01/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 3.15 0.00 0 0
8 PURBA BARDHAMAN Raina - I Central Mechanical BHAGABATIPUR PIPED WATER SUPPLY SCHEME , SM/14977 New Installation of two tank chlorination system, Yard lighting arrangement & allied works at Bajitpur, Belsar & other water supply scheme under Raina-1 Block under Central Mechanical Division, P.H.E. Dte., Dist.- Purba Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000117/2024-2025 2589/CMD 27/08/2024 90 DEY ENTERPRISE 74.58 0.00 0 0
9 PURBA BARDHAMAN Raina - I Central Mechanical BHAGABATIPUR PIPED WATER SUPPLY SCHEME , SM/14977 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 & 2 at Bhagabatipur Water Supply Scheme [ Block- Raina-1 ] under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000908/2023-2024 4172/CMD 29/08/2023 30 SOUNAK ENTERPRISE 29.71 0.00 0 0
Total 1,522.94 0.28 0.02