Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 680.53 149.73 22  
1 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Nabagram Piped Water Supply Scheme at Jamalpur Block , SM/08101 Retrofitting Laying of pipeline for providing FHTC 100% coverage and also construction & installation of Sluice Valve & Valve Chamber to control the flow of water, road restoration work etc. of different Piped W/S Schemes, Block Jamalpur under Burdwan Division, PHE Dte. AE(HQs) ORD/000194/2024-2025 2488/BWD 01/07/2024 120 M/S NATIONAL CONSTRUCTION 480.97 0.00 0 0
2 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Nabagram Piped Water Supply Scheme at Jamalpur Block , SM/08101 Retrofitting Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Nabagram Piped Water Supply Scheme at Ajhapur (Part) (Masagram Habitation), Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. (Agreement No. 115/2020-2021 OF SE/CC/PHE. DTE.) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000440/2020-2021 1402/BWD 15/02/2021 60 M/S ASHA CONSTRUCTION 67.11 57.25 85.31 1
3 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Nabagram Piped Water Supply Scheme at Jamalpur Block , SM/08101 Retrofitting Formal Work Order for Providing Functional Household Tap Connection (FHTC) from existing distribution system within the command area of Nabagram Piped Water Supply Scheme at Ajhapur (Part) (Ajhapur Habitation), Village (Mouza), Jamalpur Block under Burdwan Division, PHE Dte. (Agreement no. 116/SE/CC/PHE/Dte of 2020-2021) Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. Junior Engineer, R.W.S. Burdwan Sub Division, P.H.E. Dt ORD/000470/2020-2021 1515/BWD 19/02/2021 60 S.S. CONSTRUCTION 75.65 75.24 99.46 0
4 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Nabagram Piped Water Supply Scheme at Jamalpur Block , SM/08101 Retrofitting Providing FHTC for 100% coverage at Nabagram, Basishta Pur, Keliri, Ajhapur & Dattapur Mouza (Village) for NABAGRAM Piped W/S Scheme, Jamalpur Dev. Block under Burdwan Division, PHE Dte. AE(HQs) RWS_JAMALPUR ORD/000570/2023-2024 3716/BWD 24/08/2023 30 M/S UNIQUE 23.77 11.82 49.73 50
5 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Nabagram Piped Water Supply Scheme at Jamalpur Block , SM/08101 Retrofitting Construction of boundary wall (Back side of OHR) including land development & Pumping out of water at Pump house no - 1 Site of Nabagram Water Supply Scheme under Jamalpur Dev. Block of Burdwan Division, PHE Dte. (Length -50.00 Mtr, Col-20 Nos). Gr.G. Assistant Engineer Burdwan Sadar Sub-Division PHE. DTE. ORD/000659/2021-2022 472/BSD 21/03/2022 45 MOHAMMAD ISSA 3.77 0.00 0 1
6 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Nabagram Piped Water Supply Scheme at Jamalpur Block , SM/08101 Retrofitting Sinking of 300 mm X 200 mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CM) and UPVC Medium Well Screen (RMS) with construction of Pump House, Boundary wall, Land Development and Rising main connection of NABAGRAM Piped Water Supply Scheme, Block- Jamalpur, District:- Purba-Bardhaman under Burdwan Division PHE Dte. [FOR 3rd. TUBE WELL SITE]. AE(HQs) Junior Engineer, Burdwan Division ORD/001041/2023-2024 784/BWD 27/02/2024 60 ANIRUDDHA FARUQUE 29.04 5.42 18.66 35
7 PURBA BARDHAMAN Burdwan Division Providing Functional Household Tap Connection (FHTC) retrofitting in the command area of of Nabagram Piped Water Supply Scheme at Jamalpur Block , SM/08101 Retrofitting Emergency repair of 90mm(OD)UPVC Pipeline including dismantling and reconcreting drain at Lahapara,Nabagram PWSS under Jamalpur Dev. Block within Burdwan Division,PHE Dte AE(HQs) Junior Engineer, Burdwan Division ORD/001096/2023-2024 521/BSD 13/03/2024 15 A.R. TRADERS 0.22 0.00 0 100
Total 680.53 149.73 22