Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
24 535.02 276.8 51.74  
1 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Quotation from WBSEDCL for new connection charges of Selimabad w/s scheme of T.W.-3 under Burdwan Division, PHE Dte. BILL/01932/2023-2024 1824/JJM 27/03/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 10.47 0.00 0 0
2 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Augmentation of SELIMABAD Piped Water Supply Scheme with LDS, FHTC, Rising main, Construction of 350 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation including construction of switch-rooms (5.40mx3.6m) & Boundary walls for new TW site under Jamalpur Block, District:- Purba-Burdwan. [Treated as "New Scheme in place of Augmentation" vide Corrigendum Notice No. 1545/CC, dated 02.08.2022.] AE(HQs) J.E. 3 BURDWAN,Junior Engineer, Burdwan Division ORD/000234/2022-2023 3386/BWD 04/08/2022 365 S. DUTTA 435.08 243.52 55.97 70
3 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. to be used by the Assistant Engineer, Headquarters, P.H.E. Dte. [Period from 01.06.2024 to 31.07.2024] AE(HQs) J.E. 1 BURDWAN ORD/000439/2024-2025 304/AE/HQ 31/05/2024 60 SK. ASRAFUDDIN 0.80 0.80 100 0
4 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. to be used by the Assistant Engineer, Headquarters, P.H.E. Dte. [Period from 01.08.2024 to 30.09.2024] AE(HQs) Contractual Junior Engineer ORD/000506/2024-2025 545/AE/HQ 01/08/2024 60 SK. ASRAFUDDIN 0.80 0.80 100 0
5 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. to be used by the Assistant Engineer, Headquarters, P.H.E. Dte. [Period from 01.02.2024 to 31.03.2024] AE(HQs) J.E. 1 BURDWAN ORD/001206/2023-2024 44/AE/HQ 29/01/2024 60 SK. ASRAFUDDIN 0.80 0.80 100 50
6 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Continuation work for Supply of one no. Diesel / LPG / CNG driven Motor Cab / Maxi Cab (Air Condition) on hire basis for the office of the Executive Engineer, Burdwan Division, P.H.E. Dte. to be used by the Assistant Engineer, Headquarters, P.H.E. Dte. [Period from 01.04.2024 to 31.05.2024] AE(HQs) J.E. 1 BURDWAN ORD/001232/2023-2024 226/AE/HQ 27/03/2024 60 SK. ASRAFUDDIN 0.80 0.80 100 0
7 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Material Requisition To Resource Division RTOR000052/2022-2023 5524/BWD 23/12/2022 Resource Division 12.41 0.00 0 0
8 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Material Requisition To Resource Division RTOR000117/2023-2024 2155/BWD 10/05/2023 Resource Division 5.49 0.00 0 0
9 PURBA BARDHAMAN Jamalpur Central Mechanical GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Additional Quotation for new service connection at Selimabad PWSS PH-3. BILL/00460/2024-2025 BP-2024-25-248 01/08/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.95 0.00 0 0
10 PURBA BARDHAMAN Jamalpur Central Mechanical GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New New service connection charges for Selimabad W/S Scheme TW-1 BILL/00607/2023-2024 BP-2023-24-16 22/05/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 7.37 0.00 0 0
11 PURBA BARDHAMAN Jamalpur Central Mechanical GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New New service connection charges for Selimabad PWSS TW-2 BILL/01523/2023-2024 BP-2023-24-191 09/10/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.82 0.00 0 0
12 PURBA BARDHAMAN Jamalpur Central Mechanical GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New NEW SERVICE CONNECTION FOR SELIMABAD PWSS. BILL/02698/2023-2024 BP-2023-24-565 23/02/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 0.66 0.00 0 0
13 PURBA BARDHAMAN Jamalpur Central Mechanical GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 at Selimabad Water Supply Scheme [ Block- Jamalpur ] under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000611/2022-2023 3117/CMD 23/11/2022 30 M/S. DAS ELECTRIC CO. 11.08 10.67 96.3 80
14 PURBA BARDHAMAN Jamalpur Central Mechanical GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-2 at Selimabad Water Supply Scheme [ Block- Jamalpur ] under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000612/2022-2023 3118/CMD 23/11/2022 30 SUBRATA BHADRA 11.07 5.36 48.42 95
15 PURBA BARDHAMAN Jamalpur Central Mechanical GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-3 at Selimabad Water Supply Scheme [ Block- Jamalpur ] under CMD, PHE Dte., Dist.- Purba-Bardhaman ORD/000615/2022-2023 3119/CMD 23/11/2022 30 MITRA ENTERPRISE 10.73 0.00 0 0
16 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Providing pea size Gravels and Bentonite Powder sodium based at site with other works for construction of tube well at Selimabad PWSS( TW-III),Jamalpur Block under Purba Bardhaman ,Central Drilling Division, P.H.E Dte Driller In Charge Junior Engineer ORD/000064/2023-2024 269/CMSD-I(D) 04/12/2023 15 C.M. ENTERPRISE 1.88 0.39 20.74 100
17 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Providing Tube well materials Conforming to IS: 12818:2010 with other Works at site for construction of Tube Well at Selimabad PWSS (TW-III),Jamalpur Block under Purba Bardhaman , Central Drilling Division, P.H.E Dte. Driller In Charge Junior Engineer ORD/000065/2023-2024 271/CMSD-I(D) 04/12/2023 15 C.M. ENTERPRISE 3.28 1.20 36.59 100
18 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Providing drilling crews for construction of TW (250mm x 150mm) by Departmental Rig machine for Selimabad PWSS (TW-III), Jamalpur block under Purba Midnapur, CDD, PHE Dte. Driller In Charge Junior Engineer ORD/000146/2023-2024 270/CMSD-I(D) 04/12/2023 15 C.M. ENTERPRISE 1.73 0.78 45.09 100
19 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New PROVIDING DRILLING CREWS FOR CONSTRUCTION OF TUBE WELL (250MM X 150MM) BY DEPARTMENTAL RIG MACHINE FOR SELIMABAD PWSS (TW-I), JAMALPUR BLOCK UNDER PURBA BARDAMAN, CDD, PHE DTE. ORD/000285/2022-2023 312/CMSD-I 22/07/2022 15 UTTAM KUMAR CHATTERJEE 1.74 1.38 79.31 1
20 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New PROVIDING TUBE WELLMATERIALS CONFORMING TO IS: 12818:2010 WITH OTHER WORKS AT SITE FOR CONSTRUCTION OF TUBE WELL AT SELIMABAD PWSS (TW-I), JAMALPUR BLOCK UNDER PURBA BARDHAMAN, CDD, PHE DTE. ORD/000286/2022-2023 313/CMSD-I 22/07/2022 15 UTTAM KUMAR CHATTERJEE 3.29 3.16 96.05 1
21 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New PROVIDING PEA SIZE GRAVELS AND BENTONITE POWDER SODIUM BASED AT SITE WITH OTHER WORKS FOR CONSTRUCTION OF TUBE WELL AT SELIMABAD PWSS (TW-I), JAMALPUR BLOCK UNDER PURBA BARDHAMAN, CDD, PHE DTE. ORD/000291/2022-2023 315/CMSD-I 12/07/2022 15 UTTAM KUMAR CHATTERJEE 1.88 1.19 63.3 1
22 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Providing Drilling crew and other allied works for construction of Tube well (250mm x 150mm) by utilising Departmental machineries for Selimabad PWSS(TW-I), Jamalpur block under Purba Bardhaman District, CDD PHE Dte. ORD/000450/2022-2023 322/CMSD-I(D) 12/07/2022 15 M/S SREEJIT ENTERPRISE 1.73 1.55 89.6 100
23 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Providing pea size Gravels and Bentonite Powder sodium based at site with other works for construction of Tube well at Selimabad PWSS(TW-II), Jamalpur block under Purba Bardhaman District, CDD PHE Dte. ORD/000451/2022-2023 324/CMSD-I(D) 12/07/2022 15 M/S SREEJIT ENTERPRISE 1.88 1.16 61.7 100
24 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED SELIMABAD PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11492 New Providing Tube well materials conforming to IS: 12818:2010 with other works at site for construction of Tube well at Selimabad PWSS(TW-II), Jamalpur block under Purba Bardhaman District, CDD PHE Dte. ORD/000452/2022-2023 321/CMSD-I(D) 12/07/2022 15 M/S SREEJIT ENTERPRISE 3.28 3.24 98.78 100
Total 535.03 276.78 51.73