Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
20 3,816.74 472.76 12.39  
1 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Quotation from WBSEDCL for new service connection of Ganganandapur w/s scheme. T.W.-3 BILL/00401/2023-2024 537/JJM 21/08/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LTD. 6.60 0.00 0 0
2 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Augmentation of GANGANANDAPUR Piped Water Supply Scheme with LDS, FHTC, Rising Main, Construction of 300 Cum capacity OHR with 20.0 Mtr. Staging height inclusive of soil investigation & construction of pump house ( 3.60mx 3.0m) & boundary wall at new TW site under Purbasthali ¿ I Block, District - Purba Bardhaman. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000019/2022-2023 2013/BWD 18/04/2022 365 MANASH GHOSH 421.40 377.79 89.65 70
3 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Sinking of additional 250 X 150mm dia Tube Well 150 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) for GANGANANDAPUR Piped Water Supply Scheme, Block - Purbasthali - I, Dist - Purba Bardhaman under Burdwan Division, PHE Dte. Assistant Engineer ORD/000070/2022-2023 2424/BWD 11/05/2022 30 M/S SYCHROTECH INDUSTRY 9.01 8.47 94.01 0
4 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Work Order for " Renovation of Pump house along with laboratory building of Ganganandapur piped water supply scheme in connection with Augmentation of Ganganandapur Piped Water Supply Scheme under Burdwan Division, PHE Dte." Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000135/2024-2025 318/KSD 07/06/2024 30 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 4.31 2.12 49.19 100
5 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Work Order for "Additional work in connection with renovation of Pump house and laboratory building of Ganganandapur piped water supply scheme in connection with Augmentation of Ganganandapur Piped Water Supply Scheme under Burdwan Division, PHE Dte." Assistant Engineer ORD/000136/2024-2025 319/KSD 07/06/2024 30 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 3.83 0.00 0 0
6 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Laying of rising main along with crossing of pipeline by HDD/Jack pushing method with other allied work in connection with augmentation of Ganganandapur PWSS (SM/09411) & Rajapur PWSS (SM/ 14021), Purbasthali-I block under Kalna Sub-Division under Burdwan Division, PHE Dte. Assistant Engineer ORD/000278/2024-2025 2710/BWD 11/07/2024 90 MANASH GHOSH 81.34 0.00 0 0
7 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Supply and delivery of different dia. CIDF sluice valve for Augmentation of Jahannagar, Ganganandapur, Nowapara & Monteswar Piped Water Supply Scheme within Kalna Sub-Division under Burdwan Division, P.H.E. Dte.[Part ¿ A] Assistant Engineer ORD/000323/2022-2023 3632/BWD 22/08/2022 20 RAMASISH ENTERPRISE 12.80 0.00 0 1
8 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Digital structurization of pipeline alignment and asset evaluation including holistic design, preparation of design drawings of overall LDS & preparation of estimate for 14 Nos. Piped W/S. Schemes under Purbasthali I Block under Kalna Sub-Division under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000337/2024-2025 3017/BWD 05/08/2024 75 HORIZEN 38.00 7.60 20 45
9 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Interconnection of rising main from 2nd Tube Well site and renovation of boundary wall and pump house at 2nd Tube Well Site of Ganganandapur W/S Scheme within Kalna Sub-Division under Burdwan Division , PHE Dte. (Sl No-C) Assistant Engineer ORD/000449/2021-2022 88/KSD 21/01/2022 30 ER CONSTRUCTION & GENERAL ORDER SUPPLIER 1.20 0.86 71.67 1
10 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Preparation of DPR for augmentation of Ganganandapur W/S Scheme within Kalna Sub-Division under Burdwan Division, PHE Dte. (Sl No-E) Assistant Engineer ORD/000571/2021-2022 207/KSD 23/02/2022 21 ROY CHOWDHURY ASSOCIATES 2.84 2.82 99.3 1
11 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Work Order for "Supervision and extend support to NABL recognised Water Quality Testing Block level Laboratory under The Assistant Engineer, Kalna Sub- Division, Public Health Engineering Directorate, Government of West Bengal by assigining team of competent resource personnel who will be engeged for complete supervision for retaining NABL recognition and compilation of preparatory up-to-date documentation,Calibration for on-site survelliance by NABL (as per NABL 139) for a period of one month from the date of commencement. (Name of SDL : Ganganandapur Sub District Water Testing Laboratory under Kalna Sub Division)". Assistant Engineer JUNIOR ENGINEER R.W.S. BURDWAN SUB-DIVISION PHE DTE ORD/000671/2023-2024 1334/KSD 28/08/2023 30 BHARATI CHEMICAL & SCIENTIFIC WORKS 0.51 0.00 0 0
12 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Additional works to implement the GANGANANDAPUR Piped Water Supply Scheme under Purbasthali-I Block, Dist :- Purba Bardhaman under Burdwan Division, PHE. Dte. Assistant Engineer JUNIOR ENGINEER KALNA SUB-DIVISION PHE DTE ORD/000707/2022-2023 754/BWD 23/02/2023 60 MANASH GHOSH 76.57 67.88 88.65 85
13 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Construction of Pump House cum switch room (5.40 mtr x 3.60 mtr) with sanitary arrangement (as per drawing no. PHE/SE/CC/PH/DWG-01/2022-2023) at GANGANANDAPUR Water Supply Scheme within Kalna Sub-Divn. under Burdwan Division, PHE Dte. Dist.-Purba Bardhaman. ORD/000708/2023-2024 4481/BWD 11/10/2023 60 LOKNATH ENTERPRISE 6.31 0.00 0 0
14 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Material Requisition To Resource Division RTOR000036/2021-2022 553/BWD 27/01/2022 Resource Division 18.08 0.00 0 0
15 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Material Requisition To Resource Division RTOR000042/2022-2023 4626/BWD 17/10/2022 Resource Division 18.48 0.00 0 0
16 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Material Requisition To Resource Division RTOR000081/2021-2022 603/BWD 28/01/2022 Resource Division 24.12 0.00 0 0
17 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Material Requisition To Resource Division RTOR000105/2021-2022 952/BWD 17/02/2022 Resource Division 74.99 0.00 0 0
18 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Material Requisition To Resource Division RTOR000201/2021-2022 1524/BWD 15/03/2022 Resource Division 0.37 0.00 0 0
19 PURBA BARDHAMAN Burdwan Division Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Supply of materials for different water supply scheme under Burdwan Division, PHE Dte. VCH/001578/2021-2022 1207/DW 10/03/2022 EXECUTIVE ENGINEER, RESOURCES DIVISION, P.H.E. DTE. 3,005.00 0.00 0 0
20 PURBA BARDHAMAN Central Mechanical Augmentation of Ganganandapur PWSS for providing FHTC. , SM/09411 Augmentation Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 at Augumentation of Ganganandapur Water Supply Scheme under CMD, PHE Dte., Dist.- Purba-Bardhaman. ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000073/2023-2024 2562/CMD 06/06/2023 30 SUDIPTA GHOSH 10.98 5.22 47.54 95
Total 3,816.74 472.77 12.39