Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
15 372.47 228.1 61.24  
1 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New Augmentation of KALERA Piped Water Supply Scheme with LDS, FHTC, Rising main, Construction of 350 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil investigation including construction of switch-rooms(5.40mx3.6m) & Boundary walls for new TW site under Jamalpur Block, District:- Purba-Burdwan. [Treated as "New Scheme in place of Augmentation" vide Corrigendum Notice No. 1544/CC, dated 02.08.2022.] AE(HQs) Junior Engineer, Burdwan Division ORD/000256/2022-2023 3855/BWD 07/09/2022 365 M/S MAA TARA CONSTRUCTION 302.71 195.64 64.63 90
2 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New Material Requisition To Resource Division RTOR000053/2022-2023 5522/BWDQ 23/12/2022 Resource Division 8.88 0.00 0 0
3 PURBA BARDHAMAN Jamalpur Burdwan Division GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New Material Requisition To Resource Division RTOR000118/2023-2024 2155/BWD 10/05/2023 Resource Division 12.90 0.00 0 0
4 PURBA BARDHAMAN Jamalpur Central Mechanical GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New New Service Connection Charges for Kalera W/S Scheme PH-1 BILL/00002/2022-2023 25 02/01/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 4.51 0.00 0 0
5 PURBA BARDHAMAN Jamalpur Central Mechanical GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New New Service Connection Charges for Kalera W/S Scheme PH-2 BILL/00003/2022-2023 26 02/01/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD. (WBSEDCL) 5.90 0.00 0 0
6 PURBA BARDHAMAN Jamalpur Central Mechanical GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-1 at Kalera Water Supply Scheme [ Block- Jamalpur ] under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000609/2022-2023 3115/CMD 23/11/2022 30 P.K. ENGINEERING 11.07 10.73 96.93 80
7 PURBA BARDHAMAN Jamalpur Central Mechanical GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New Supply & Installation of Submersible Pumping Machinery, Voltage Stabilizer, Chlorination System and Internal House Wiring for Tube well No.-2 at Kalera Water Supply Scheme [ Block- Jamalpur ] under CMD, PHE Dte., Dist.- Purba-Bardhaman ASSISTANT ENGINEER JUNIOR ENGINEER ORD/000610/2022-2023 3116/CMD 23/11/2022 30 DUTTA ENTERPRISE 11.08 7.74 69.86 80
8 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New Hiring of Diesel driven motor cab (BS-III & above) having contract carriage permit along with driver for the office of the Executive Engineer, CDD, PHE Dte. Assistant Engineer Junior Engineer ORD/000004/2023-2024 45/S&WSD 26/04/2023 7 ASHUTOSH DAS & CO 0.87 1.43 164.37 83
9 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New PROVIDING PEA SIZE GRAVELS AND BENTONITE POWDER SODIUM BASED AT SITE WITH OTHER WORKS FOR CONSTRUCTION OF TUBE WELL AT KELERA W/S (TW-I) SCHEME, JAMALPUR BLOCK UNDER PURBA BARDHAMAN, CDD, PHE DTE. ORD/000287/2022-2023 320/CMSD-I 21/07/2022 15 C.M. ENTERPRISE 1.88 1.19 63.3 1
10 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New PROVIDING DRILLING CREWS FOR CONSTRUCTION OF TUBE WELL (250MM X 150MM) BY DEPARTMENTAL RIG MACHINE FOR KALERA W/S (TW-I) SCH, JAMALPUR BLOCK UNDER PURBA BARDHAMAN, CDD, PHE DTE. ORD/000288/2022-2023 319/CMSD-I 21/07/2022 15 C.M. ENTERPRISE 1.74 1.74 100 1
11 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New PROVIDING TUBE WELL MATERIALS CONFORMING TO IS: 12818:2010 WITH OTHER WORKS AT SITE FOR CONSTRUCTION OF TUBE WELL AT KALERA W/S (TW-I) SCH, JAMALPUR BLOCK UNDER PURBA BARDHAMAN, CDD, PHE DTE. ORD/000289/2022-2023 316/CMSD-I 22/07/2022 15 C.M. ENTERPRISE 3.28 3.22 98.17 1
12 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New PROVIDING TUBE WELL MATERIALS CONFORMING TO IS: 12818:2010 WITH OTHER WORKS AT SITE FOR CONSTRUCTION OF TUBE WELL AT KALERA W/S SCH (TW-II) SCH, JAMALPUR BLOCK UNDER PURBA BARDHAMAN, CDD, PHE DTE. ORD/000290/2022-2023 317/CMSD-I 22/07/2022 15 C.M. ENTERPRISE 3.28 3.12 95.12 1
13 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New PROVIDING PEA SIZE GRAVELS AND BENTONITE POWDER SODIUM BASED AT SITE WITH OTHER WORKS FOR CONSTRUCTION OF TUBE WELL AT KALERA W/S SCH (TW-II) SCH, JAMALPUR BLOCK UNDER PURBA BARDHAMAN, CDD, PHE DTE. ORD/000292/2022-2023 331/CMSD-I 15/07/2022 15 C.M. ENTERPRISE 1.88 1.16 61.7 1
14 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New Additional Transportation of Departmental rig unit no. Super RR with compressor and pump unit from Kalera PWSS under CDD, PHE dte. Driller In Charge Junior Engineer ORD/000307/2022-2023 532/CMSD-II(D) 01/12/2022 7 PADMA ENGINEERING & CO. 0.75 0.75 100 1
15 PURBA BARDHAMAN Jamalpur Central Drilling GROUND WATER BASED KALERA PIPED WATER SUPPLY SCHEME JAMALPUR BLOCK PURBA BARDHAMAN , SM/11491 New Providing drilling crews for construction of TW (250mm x 150mm) by Departmental rig machine for kalera WS (TW-II), Jamalpur block purba Burdwan, CDD, PHE Dte. ORD/000308/2022-2023 330/CMSD-I(D) 15/07/2022 15 C.M. ENTERPRISE 1.74 1.38 79.31 1
Total 372.50 228.10 61.23