Sl No. | District
As per Census (2011)
|
Scheme SM Code | Scheme
Schemes for which Work Order has been issued as per PHED-MIS
|
Scheme Type
Type of Scheme as per PHED-MIS
|
Name of JE entrusted | SLSSC Date
Date of SLSSC in which the Scheme has been Approved
|
FHTC Involved
Approved FHTC Count Modified after the appropriation in YDU considered under the Schemes for which Work Order has been Issued as per PHED-MIS
|
Estimated Cost | AAFS Cost
Approved Implementation as mentioned in AAFS considered under the Schemes for which Work Order has been Issued as per PHED-MIS
|
Resource Material | Date of First Work Order
Total No. of Work Orders Issued under the Scheme as per PHED-MIS
|
No. of Work Orders Issued
Total No. of Work Orders Issued under the Scheme as per PHED-MIS
|
Work Value
Total Cost for all the Issued Work Order under the Scheme as per PHED-MIS
|
Payment
Total Payment made for these Work Orders as per PHED-MIS
|
Payment % | Physical Progress % |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
173 | 67,062 | 72,816.28 | 72,816.28 | 0 | # | 525 | 67,751.79 | 8,692.92 | # | # | ||||||
1 | KALIMPONG | SM/07872 | Retrofitting for FHTC & Improvement of piped water supply scheme for Pedong Bazar & adjoining areas in connection with (JJM & Jal swapno) | Retrofitting | 04/12/2020 | 625 | 72.63 | 72.63 | 0.00 | 12/10/2020 | 5 | 67.79 | 49.50 | 73.02 | 0 | |
2 | KALIMPONG | SM/08693 | Retrofitting of Neorakhola piped water supply scheme to provide Functional Household Tap Connection to the enroute villages of the scheme in Kalimpong Block I & II in Kalimpong District under JJM & JAL SWAPNA Programme | Retrofitting | Junior Engineer I,Junior Engineer IV | 10/02/2021 | 1,000 | 99.42 | 99.42 | 0.00 | 06/09/2021 | 4 | 99.17 | 97.95 | 98.77 | 100 |
3 | KALIMPONG | SM/09539 | PWS SCHEME FROM HARI KHOLA TO UPPER LOWER GUMTI | New | Junior Engineer-4 | 29/09/2021 | 121 | 151.50 | 151.50 | 0.00 | 14/01/2022 | 2 | 147.73 | 33.81 | 22.89 | 100 |
4 | KALIMPONG | SM/09540 | PWS SCHEME FROM BARA SUKAY KHOLA TO CHOTTA MANZING | New | Junior Engineer-4 | 29/09/2021 | 61 | 91.94 | 91.94 | 0.00 | 14/01/2022 | 2 | 89.37 | 71.94 | 80.5 | 90 |
5 | KALIMPONG | SM/09541 | PWS SCHEME FROM GAIRIBAS KHOLA& GEET KHOLA TO JHANDI | New | Junior Engineer III | 29/09/2021 | 400 | 568.83 | 568.83 | 0.00 | 04/04/2022 | 3 | 553.22 | 170.48 | 30.82 | 86 |
6 | KALIMPONG | SM/09542 | PWS SCHEME FROM CHINDAY JHORA TO YONZON, BOMZON, LAMA GAON | New | Junior Engineer III | 29/09/2021 | 87 | 108.18 | 108.18 | 0.00 | 28/03/2022 | 2 | 96.64 | 76.60 | 79.26 | 80 |
7 | KALIMPONG | SM/09543 | PWS SCHEME FROM CHAR CHAREY JHORA TO PUBUNG BUSTY | New | Junior Engineer-4 | 29/09/2021 | 213 | 365.16 | 365.16 | 0.00 | 21/02/2022 | 2 | 355.16 | 107.46 | 30.26 | 65 |
8 | KALIMPONG | SM/09544 | PIPED WATER SUPPLY SCHEME FROM CHISO PANI PEEPAL DHARA TO LAMINI,RAI, DHAJEY GOAN. | New | Junior Engineer-2,Junior Engineer-I | 29/09/2021 | 147 | 198.74 | 198.74 | 0.00 | 14/01/2022 | 2 | 193.65 | 97.35 | 50.27 | 100 |
9 | KALIMPONG | SM/09545 | PWSS SCHEME FROM NIMBONG KHOLA TO UPPER AND LOWER GESHOK AND GAIRIGAON | New | Junior Engineer-4 | 29/09/2021 | 125 | 160.48 | 160.48 | 0.00 | 07/01/2022 | 3 | 160.58 | 17.77 | 11.07 | 100 |
10 | KALIMPONG | SM/09546 | PWS SCHEME FROM MAWATAR TO UPPER DABLING | New | Junior Engineer-2 | 29/09/2021 | 50 | 192.44 | 192.44 | 0.00 | 07/01/2022 | 4 | 186.52 | 89.68 | 48.08 | 100 |
11 | KALIMPONG | SM/09547 | PWS SCHEM FROM OKHERBOTEY KHOLA TO UPPER PEDONG | New | Junior Engineer-3,Junior Engineer-II | 29/09/2021 | 300 | 237.68 | 237.68 | 0.00 | 14/01/2022 | 6 | 239.34 | 121.78 | 50.88 | 80 |
12 | KALIMPONG | SM/09548 | PWS from Samphong Khola to Kagey Busty District Kalimpong | New | Junior Engineer-3,Junior Engineer-III | 29/09/2021 | 641 | 679.86 | 679.86 | 0.00 | 21/02/2022 | 3 | 675.69 | 339.93 | 50.31 | 85 |
13 | KALIMPONG | SM/09584 | PWS SCHEME FROM JHOLUNG KHOLA TO 45 DHURA | New | Junior Engineer-4,Junior Engineer-I | 08/10/2021 | 160 | 138.09 | 138.09 | 0.00 | 14/01/2022 | 2 | 134.78 | 69.04 | 51.22 | 90 |
14 | KALIMPONG | SM/09594 | PWS SCHEME FROM THUKCHUK KHOLA TO 20TH MILE | New | Junior Engineer IV | 29/09/2021 | 480 | 776.35 | 776.35 | 0.00 | 04/04/2022 | 2 | 743.50 | 169.18 | 22.75 | 70 |
15 | KALIMPONG | SM/09595 | PWS SCHEME FROM UNEAK KHOLA TO DABLING | New | Junior Engineer-2 | 29/09/2021 | 95 | 126.98 | 126.98 | 0.00 | 07/01/2022 | 2 | 123.18 | 59.27 | 48.12 | 100 |
16 | KALIMPONG | SM/09596 | PWS SCHEME FROM DHATURAY JHORA TO DEWARLI GAON, GUMBA GAON, BICH GAON | New | 29/09/2021 | 320 | 314.39 | 314.39 | 0.00 | 27/01/2022 | 5 | 316.24 | 202.20 | 63.94 | 100 | |
17 | KALIMPONG | SM/09597 | PWS SCHEME FROM HIGHEST POINT JHORA TO UGEN MINDRU SAMTENLING GUMBA | New | Junior Engineer-4,Junior Engineer-III | 29/09/2021 | 74 | 199.67 | 199.67 | 0.00 | 14/01/2022 | 2 | 193.29 | 83.81 | 43.36 | 100 |
18 | KALIMPONG | SM/09598 | PWS SCHEME FROM OKHERBOTEY JHORA TO DARA GAON | New | Junior Engineer-3 | 29/09/2021 | 56 | 96.33 | 96.33 | 0.00 | 07/01/2022 | 2 | 93.59 | 0.00 | 0 | 100 |
19 | KALIMPONG | SM/09599 | PIPED WATER SUPPLY SCHEME FROM DHOBI KHOLA TO KASHYONE. | New | Junior Engineer III | 29/09/2021 | 502 | 312.00 | 312.00 | 0.00 | 21/02/2022 | 3 | 308.40 | 156.00 | 50.58 | 90 |
20 | KALIMPONG | SM/09600 | PWS SCHEME FROM SISNEY AND ANKUREY JHORA TO NOKDARA | New | Junior Engineer-2,Junior Engineer-II | 29/09/2021 | 234 | 169.19 | 169.19 | 0.00 | 14/01/2022 | 4 | 165.26 | 60.00 | 36.31 | 90 |
21 | KALIMPONG | SM/09601 | PWS SCHEME FROM CHAMUNG KHOLA TO GITDABLING BAZAR | New | Junior Engineer-3,Junior Engineer-III | 29/09/2021 | 245 | 206.39 | 206.39 | 0.00 | 07/01/2022 | 5 | 199.21 | 88.49 | 44.42 | 100 |
22 | KALIMPONG | SM/09602 | Pws scheme from 7th Mile Jhora to Algarah | New | Junior Engineer IV | 29/09/2021 | 450 | 321.38 | 321.38 | 0.00 | 21/02/2022 | 3 | 303.02 | 159.32 | 52.58 | 97 |
23 | KALIMPONG | SM/09603 | PWS SCHEME FROM 9TH MILE JHORA TO 18TH MILE | New | Junior Engineer III | 29/09/2021 | 120 | 258.69 | 258.69 | 0.00 | 21/02/2022 | 5 | 257.42 | 163.51 | 63.52 | 100 |
24 | KALIMPONG | SM/09605 | PWS SCHEME FROM JHOLUNGAY KHOLA(BANDUKEY) TO DOKAN DARA | New | Junior Engineer-4,Junior Engineer-I | 29/09/2021 | 220 | 164.46 | 164.46 | 0.00 | 14/01/2022 | 2 | 160.83 | 130.66 | 81.24 | 100 |
25 | KALIMPONG | SM/09606 | PWS SCHEME BHERI POSHYER KHOLA TO KOTHI LINE | New | Junior Engineer-4 | 29/09/2021 | 230 | 198.35 | 198.35 | 0.00 | 07/01/2022 | 2 | 193.36 | 75.76 | 39.18 | 100 |
26 | KALIMPONG | SM/09607 | PWS SCHEME FROM BHUPALEY KHOLA TO PAREN | New | Junior Engineer-4,Junior Engineer-I | 29/09/2021 | 208 | 108.86 | 108.86 | 0.00 | 14/01/2022 | 2 | 106.77 | 54.43 | 50.98 | 80 |
27 | KALIMPONG | SM/09608 | PWS SCHEME FROM AMBIOK KHOLA (PARBALAKHA) TO GORUBATHAN TAR | New | Junior Engineer-4,Junior Engineer-I | 29/09/2021 | 448 | 367.78 | 367.78 | 0.00 | 21/02/2022 | 4 | 361.24 | 22.42 | 6.21 | 90 |
28 | KALIMPONG | SM/09609 | PWS SCHEME FROM REON KHOLA TO LOWER PEMBLING | New | Junior Engineer-3,Junior Engineer-I | 29/09/2021 | 75 | 98.66 | 98.66 | 0.00 | 07/01/2022 | 2 | 95.48 | 49.33 | 51.67 | 100 |
29 | KALIMPONG | SM/09610 | PWS SCHEME FROM CHAWA KHOLA TO RELLI | New | Junior Engineer-4 | 29/09/2021 | 125 | 122.01 | 122.01 | 0.00 | 07/01/2022 | 2 | 180.95 | 115.11 | 63.61 | 100 |
30 | KALIMPONG | SM/09611 | PWS SCHEME FROM BICHRI DHARA TO LOWER SUNGDUNG | New | Junior Engineer-3,Junior Engineer-II | 29/09/2021 | 70 | 80.80 | 80.80 | 0.00 | 07/01/2022 | 2 | 78.77 | 18.52 | 23.51 | 100 |
31 | KALIMPONG | SM/09612 | PWS SCHEME FROM SAMTHARA KHOLA TO CENTRE GAON, PINTALAY GAON, GUDARA GAON, BICH GAON, CHETTRI GAON | New | Junior Engineer III | 29/09/2021 | 110 | 180.96 | 180.96 | 0.00 | 28/02/2022 | 1 | 154.60 | 0.00 | 0 | 80 |
32 | KALIMPONG | SM/09613 | PWSS SCHEME FROM SISNEY KHOLA TO UPPER AND LOWER KAMBAL & DINGALI GAON | New | Junior Engineer IV | 29/09/2021 | 88 | 110.68 | 110.68 | 0.00 | 28/02/2022 | 2 | 107.88 | 26.16 | 24.25 | 100 |
33 | KALIMPONG | SM/09614 | PWS SCHEME FROM KAIJARBOTEY JHORA TO LOWER POSHYER BHASMEY | New | Junior Engineer-2,Junior Engineer-II | 29/09/2021 | 61 | 88.27 | 88.27 | 0.00 | 14/01/2022 | 2 | 86.02 | 44.14 | 51.31 | 100 |
34 | KALIMPONG | SM/09615 | PWS SCHEME FROM CHAGEY KHOLA TO KATAREY GAON | New | Junior Engineer-4 | 29/09/2021 | 55 | 118.44 | 118.44 | 0.00 | 14/01/2022 | 3 | 117.29 | 108.04 | 92.11 | 100 |
35 | KALIMPONG | SM/09616 | PWS SCHEME FROM KAMZER KHOLA TO LOLAY DOKAN DARA | New | Junior Engineer-2,Junior Engineer-II | 29/09/2021 | 50 | 143.99 | 143.99 | 0.00 | 07/01/2022 | 2 | 139.12 | 60.00 | 43.13 | 100 |
36 | KALIMPONG | SM/09617 | PWSS FROM MALI KHOLA TO KASHMI FOREST VILLAGE | New | Junior Engineer-4,Junior Engineer-I | 29/09/2021 | 99 | 100.06 | 100.06 | 0.00 | 15/05/2023 | 4 | 91.96 | 32.28 | 35.1 | 100 |
37 | KALIMPONG | SM/09664 | PWS SCHEME FROM CHAGEY KHOLA TO SAURENI | New | 29/09/2021 | 60 | 137.62 | 137.62 | 0.00 | 07/01/2022 | 2 | 133.81 | 99.98 | 74.72 | 100 | |
38 | KALIMPONG | SM/09665 | PIPED WATER SUPPLY SCHEME FROM SISNEY JHORA TO NORTH PEDONG | New | Junior Engineer-3,Junior Engineer-II | 29/09/2021 | 221 | 142.76 | 142.76 | 0.00 | 14/01/2022 | 2 | 139.48 | 45.78 | 32.82 | 80 |
39 | KALIMPONG | SM/09666 | PWS SCHEME FROM THAKALEY JHORA TO VATTY DARA 3RD MILE | New | Junior Engineer-II | 29/09/2021 | 140 | 138.81 | 138.81 | 0.00 | 07/01/2022 | 2 | 135.39 | 34.30 | 25.33 | 75 |
40 | KALIMPONG | SM/09667 | PWS SCHEME FROM JHOLUNG KHOLA TO UPPER, LOWER AND MIDDLE DHAP | New | 29/09/2021 | 350 | 476.50 | 476.50 | 0.00 | 21/02/2022 | 2 | 528.15 | 339.12 | 64.21 | 100 | |
41 | KALIMPONG | SM/09668 | PWS SCHEME FROM ARDHALI JHORA TO TINKATAREY, CHAPLATEY, BARAL, GURDAY GAON | New | Junior Engineer-4,Junior Engineer-I | 29/09/2021 | 140 | 182.37 | 182.37 | 0.00 | 14/01/2022 | 5 | 179.08 | 40.96 | 22.87 | 80 |
42 | KALIMPONG | SM/09669 | PWSS SCHEME FROM KHANI KHOLA TO WEST SAMALBONG | New | Junior Engineer-4,Junior Engineer-I | 29/09/2021 | 56 | 125.27 | 125.27 | 0.00 | 07/01/2022 | 2 | 121.87 | 85.86 | 70.45 | 100 |
43 | KALIMPONG | SM/09670 | PWS SCHEME FROM NIMBONG KHOLA TO SALDARA | New | Junior Engineer-2,Junior Engineer-II | 29/09/2021 | 65 | 122.05 | 122.05 | 0.00 | 07/01/2022 | 2 | 118.14 | 7.93 | 6.71 | 100 |
44 | KALIMPONG | SM/10052 | Augmentation of Neorakhola Water Supply Scheme for extending FHTC Facility to the enroute habitations under Kalimpong Block-I & Block-II under Neorakhola W/S & Mtc Division ,PHE Dte., Kalimpong | Augmentation | Junior Engineer III,Junior Engineer IV | 15/09/2021 | 0 | 4,402.74 | 4,402.74 | 0.00 | 28/02/2022 | 25 | 2,084.64 | 581.57 | 27.9 | 47 |
45 | KALIMPONG | SM/10265 | Functional household tap connection under Jal Swapno Programme, 14 Nos. existing schemes to be provided with FHTC under GTA. | Retrofitting | 08/01/2021 | 1,475 | 228.22 | 228.22 | 0.00 | 14/12/2022 | 14 | 199.13 | 161.25 | 80.98 | 0 | |
46 | KALIMPONG | SM/10266 | Functional household tap connection under Jal Swapno Programme, 10 Nos. existing schemes to be provided with FHTC under GTA. | Retrofitting | 08/01/2021 | 1,769 | 187.99 | 187.99 | 0.00 | 14/12/2022 | 12 | 163.77 | 110.68 | 67.58 | 0 | |
47 | KALIMPONG | SM/10267 | Functional household tap connection under Jal Swapno Programme, 8 Nos. existing schemes to be provided with FHTC under GTA. | Retrofitting | 08/01/2021 | 1,116 | 127.68 | 127.68 | 0.00 | 14/12/2022 | 9 | 116.84 | 102.69 | 87.89 | 0 | |
48 | KALIMPONG | SM/10512 | Detail Project Report on Extension of pipeline by way of Retrofitting of Neorakhola Piped water Scheme to provide Functional Household Tap Connection to the remaining households of en-route villages of the Scheme in Kalimpong Block I-II , under Kalimpong | Retrofitting | Junior Engineer I,Junior Engineer III,Junior Engineer IV | 17/02/2022 | 677 | 504.20 | 504.20 | 0.00 | 13/04/2022 | 5 | 483.72 | 270.68 | 55.96 | 95 |
49 | KALIMPONG | SM/10562 | Gravity based piped water supply scheme for Bokhim khasmahal & paygang khasmahal (PC) under Gitdabling G.P. Kalimpong Blick-II in the District of Kalimpong in connection under Neorakhola Water Supply & Maintenance Division, P.H.E Directorate. | New | Junior Engineer IV | 16/03/2022 | 67 | 132.05 | 132.05 | 0.00 | 24/05/2022 | 1 | 124.76 | 0.00 | 0 | 95 |
50 | KALIMPONG | SM/10563 | Gravity based piped water supply scheme for pemling forest under Kaffer - Kankebong G.P. Kalimpong Block-I, Dist-Kalimpong in connection under Neorakhola W/S & Mtc, Div. PHE. Dte. Kalimpong. | New | 16/03/2022 | 34 | 62.89 | 62.89 | 0.00 | 26/05/2022 | 3 | 60.98 | 0.00 | 0 | 100 | |
51 | KALIMPONG | SM/10575 | Gravity based piped water supply scheme for BIRIK FOREST VILLAGE under G.P. Kalimpong Block-I, District- Kalimpong in Connection under Neorakhola Water Supply & Maintenance Division, P.H.E Directorate. | New | Junior Engineer IV | 16/03/2022 | 43 | 49.33 | 49.33 | 0.00 | 26/05/2022 | 3 | 47.61 | 0.00 | 0 | 90 |
52 | KALIMPONG | SM/10576 | Gravity based piped water supply scheme for Paren forest Village under Paten Godak GP in Gorubathan Block in connection with implementation in the district of Kalimpong under Neorakhola W/S & Mtc, Div. PHE. Dte. Kalimpong. | New | 16/03/2022 | 45 | 49.14 | 49.14 | 0.00 | 26/05/2022 | 2 | 48.22 | 0.00 | 0 | 50 | |
53 | KALIMPONG | SM/10599 | Gravity based piped water supply scheme for chumang forest under Gitdabling G.P Kalimpong Block-II, Dist- Kalimpong in connection under Neorakhola W/S & Mtc, Div. PHE. Dte. Kalimpong. | New | Junior Engineer IV | 16/03/2022 | 28 | 67.06 | 67.06 | 0.00 | 26/05/2022 | 1 | 61.94 | 0.00 | 0 | 100 |
54 | KALIMPONG | SM/10600 | Gravity based piped water supply scheme for Tashiding forest Village under Tashiding GP in Kalimpong Block I in connecion with implementation in the district of Kalimpong under Neorakhola W/S & Mtc, Div. PHE. Dte., Kalimpong. | New | 16/03/2022 | 13 | 10.62 | 10.62 | 0.00 | 26/05/2022 | 2 | 10.28 | 0.00 | 0 | 100 | |
55 | KALIMPONG | SM/10601 | Gravity based piped water supply scheme for Dalapchand slip reserve forest Village under Dalapchand GP in Kalimpong Block II in connecion with implementation in the district of Kalimpong under Neorakhola W/S & Mtc, Div. PHE. Dte. Kalimpong. | New | Junior Engineer IV | 16/03/2022 | 10 | 9.66 | 9.66 | 0.00 | 26/05/2022 | 2 | 9.29 | 4.35 | 46.82 | 0 |
56 | KALIMPONG | SM/10602 | Gravity based piped water supply scheme for Rissium forest Village under Santook GP in Kalimpong Block-II, in the District of Kalimpong in connecion with implementation under Neorakhola W/S & Mtc, Div. PHE. Dte. Kalimpong. | New | Junior Engineer IV | 16/03/2022 | 27 | 25.25 | 25.25 | 0.00 | 26/05/2022 | 1 | 21.57 | 0.00 | 0 | 100 |
57 | KALIMPONG | SM/10603 | Gravity based piped water supply scheme for Noam forest Village under Pokhriabong GP in Gorubathan Block in connecion with implementation in the district of Kalimpong under Neorakhola W/S & Mtc, Div. PHE. Dte. Kalimpong. | New | 16/03/2022 | 55 | 41.32 | 41.32 | 0.00 | 15/05/2023 | 3 | 46.86 | 0.00 | 0 | 10 | |
58 | KALIMPONG | SM/10623 | Gravity based piped water supply scheme for Kolbong Forest Village under Lava Gitbeong G.P. Kalimpong Block-II, in the District of Kalimpong in Connection under Neorakhola Water Supply & Maintenance Division, P.H.E Directorate. | New | Junior Engineer III | 16/03/2022 | 28 | 41.40 | 41.40 | 0.00 | 25/05/2022 | 1 | 38.82 | 20.70 | 53.32 | 95 |
59 | KALIMPONG | SM/10624 | Gravity based piped water supply scheme for Icha forest Village under Sangsey GP Kalimpong Block-II, in the District of Kalimpong in connecion with implementation under Neorakhola W/S & Mtc, Div. PHE. Dte. Kalimpong. | New | 16/03/2022 | 42 | 40.13 | 40.13 | 0.00 | 25/05/2022 | 1 | 60.93 | 20.06 | 32.92 | 0 | |
60 | KALIMPONG | SM/10625 | Gravity based piped water supply scheme for Paiengoan forest Village under Santook GP in Kalimpong Block-II in the district of Kalimpong in connecion with implementation under Neorakhola W/S & Mtc, Div. PHE. Dte. Kalimpong. | New | Junior Engineer I | 16/03/2022 | 62 | 49.50 | 49.50 | 0.00 | 26/05/2022 | 3 | 51.49 | 0.00 | 0 | 90 |
61 | KALIMPONG | SM/10635 | PROPOSED SURFACE WATER BASED YAKPRINTAM KHASMAHAL (part) PWSS TO ACCOMMODATE FHTC IN KALIMPONG-I BLOCK WITHIN KALIMPONG DISTRICT UNDER NEORAKHOKA W/S & MTC. DIVISION, PHE DTE. | New | Junior Engineer III | 16/03/2022 | 70 | 143.53 | 143.53 | 0.00 | 30/06/2022 | 2 | 137.52 | 70.74 | 51.44 | 85 |
62 | KALIMPONG | SM/10694 | PIPED WATER SUPPLY SCHEME FROM NEROLA JHORA TO LOWER ECHHEY UNDER KALIMPONG BLOCK - I UNDER JJM AND JAL SWAPNO PROGRAMME | New | Junior Engineer-2,Junior Engineer-II | 17/02/2022 | 105 | 94.15 | 94.15 | 0.00 | 25/05/2022 | 2 | 93.09 | 47.07 | 50.56 | 75 |
63 | KALIMPONG | SM/10695 | PIPED WATER SUPPLY SCHEME FROM GURUNG JHORA TO PACHIM KABI GAON UNDER KALIMPONG BLOCK - I UNDER JJM AND JAL SWAPNO PROGRAMME | New | Junior Engineer-3,Junior Engineer-II | 17/02/2022 | 136 | 138.07 | 138.07 | 0.00 | 26/05/2022 | 1 | 133.86 | 69.04 | 51.58 | 100 |
64 | KALIMPONG | SM/10696 | PIPED WATER SUPPLY SCHEME FROM AGINGAREY KHOLCHA TO 8 12 AND KHOTILINE UNDER GORUBATHAN BLOCK UNDER JJM AND JAL SWAPNO PROGRAMME | New | Junior Engineer-4,Junior Engineer-I | 17/02/2022 | 135 | 115.09 | 115.09 | 0.00 | 25/05/2022 | 2 | 107.89 | 54.67 | 50.67 | 100 |
65 | KALIMPONG | SM/10697 | PIPED WATER SUPPLY SCHEME FROM KATHAREY KHOLA TO BHUTIA BUSTY UNDER GORUBATHAN BLOCK UNDER JJM AND JAL SWAPNO PROGRAMME | New | Junior Engineer-4,Junior Engineer-I | 17/02/2022 | 100 | 126.09 | 126.09 | 0.00 | 01/08/2022 | 1 | 120.90 | 22.25 | 18.4 | 100 |
66 | KALIMPONG | SM/10698 | PIPED WATER SUPPLY SCHEME FROM DORKHOLA TO LUNGSEL UNDER GORUBATHAN BLOCK UNDER JJM AND JAL SWAPNO PROGRAMME | New | Junior Engineer-4,Junior Engineer-I | 17/02/2022 | 169 | 206.41 | 206.41 | 0.00 | 25/05/2022 | 1 | 196.26 | 93.39 | 47.58 | 100 |
67 | KALIMPONG | SM/10699 | PIPED WATER SUPPLY SCHEME FROM DADALEY JHORA TO BURMAIK UNDER SANGSEY G.P BLOCK-II, KALIMPONG UNDER JJM AND JAL SWAPNO PROGRAMME | New | Junior Engineer-2,Junior Engineer-II | 17/02/2022 | 350 | 152.76 | 152.76 | 0.00 | 25/05/2022 | 1 | 147.75 | 0.00 | 0 | 90 |
68 | KALIMPONG | SM/10700 | PIPED WATER SUPPLY SCHEME FROM SIRISE KHOLA TO ROCKY ISLAND UNDER KALIMPONG GORUBATHAN BLOCK UNDER JJM AND JAL SWAPNO PROGRAMME | New | Junior Engineer-4,Junior Engineer-I | 17/02/2022 | 242 | 173.31 | 173.31 | 0.00 | 24/05/2022 | 1 | 164.25 | 0.00 | 0 | 100 |
69 | KALIMPONG | SM/10701 | PIPED WATER SUPPLY SCHEME FROM SETHI KHOLA TO UPPER KHANI UNDER KALIMPONG BLOCK - I UNDER JJM AND JAL SWAPNO PROGRAMME | New | Junior Engineer-4,Junior Engineer-III | 17/02/2022 | 90 | 114.57 | 114.57 | 0.00 | 30/06/2022 | 1 | 104.88 | 26.84 | 25.59 | 100 |
70 | KALIMPONG | SM/10702 | PIPED WATER SUPPLY SCHEME FROM HARISEY JHORA TO LOWER BHAGEY UNDER SANGSEY G.P BLOCK-II, KALIMPONG UNDER JJM AND JAL SWAPNO PROGRAMME | New | Junior Engineer-3,Junior Engineer-II | 17/02/2022 | 131 | 113.56 | 113.56 | 0.00 | 13/05/2022 | 1 | 100.81 | 52.04 | 51.62 | 75 |
71 | KALIMPONG | SM/10703 | PIPED WATER SUPPLY SCHEME FROM BULBULEY JHORA TO SURUK UNDER SAMTHAR G.P BLOCK-I, KALIMPONG UNDER JJM AND JAL SWAPNO PROGRAMME | New | Junior Engineer-4 | 17/02/2022 | 407 | 286.37 | 286.37 | 0.00 | 26/05/2022 | 1 | 277.69 | 252.26 | 90.84 | 100 |
72 | KALIMPONG | SM/10704 | PIPED WATER SUPPLY SCHEME FROM BURMAIK JHORA TO MAHAKAL DARA UNDER BHALUKHOP G.P BLOCK-I, KALIMPONG UNDER JJM AND JAL SWAPNO PROGRAMME | New | Junior Engineer-2,Junior Engineer-III | 17/02/2022 | 226 | 338.99 | 338.99 | 0.00 | 05/08/2022 | 2 | 328.86 | 7.41 | 2.25 | 80 |
73 | KALIMPONG | SM/10705 | Augmentation of Lolaygoan Bazar Water Supply Scheme (IMIS Code-0001723403) for providing Functional Household Tap Connections (FHTC) in connection with Jal Jeevan Mission (JJM) under Neorakhola Water Supply & Maintenance Division, P.H.E Directorate. | Augmentation | Junior Engineer III | 27/01/2022 | 105 | 99.21 | 99.21 | 0.00 | 13/04/2022 | 1 | 95.54 | 0.00 | 0 | 80 |
74 | KALIMPONG | SM/10729 | Chunabhatti Bazar D.I.F & Lish Forest Piped Water Supply Scheme. | New | Junior Engineer I | 16/03/2022 | 197 | 136.35 | 136.35 | 0.00 | 26/05/2022 | 8 | 137.80 | 89.20 | 64.73 | 100 |
75 | KALIMPONG | SM/10739 | Gravity based piped water supply scheme for Mangber forest Village under Teesta GP in Kalimpong Block-I in connection with implementation in the district of Kalimpong under Neorakhola W/S & Mtc, Div. PHE. Dte. Kalimpong. | New | 16/03/2022 | 7 | 5.37 | 5.37 | 0.00 | 26/05/2022 | 1 | 4.77 | 2.69 | 56.39 | 100 | |
76 | KALIMPONG | SM/10741 | PWS SCHEME FROM CHIP CHHIPEY JHORA TO CFC FOREST VILLAGE | New | Junior Engineer-4,Junior Engineer-I | 17/02/2022 | 80 | 92.28 | 92.28 | 0.00 | 26/05/2022 | 3 | 84.35 | 14.16 | 16.79 | 100 |
77 | KALIMPONG | SM/10742 | PWS SCHEME FROM SISNEY JHORA TO SAMTHAR BAZAR | New | Junior Engineer-4,Junior Engineer-II | 17/02/2022 | 252 | 197.78 | 197.78 | 0.00 | 25/05/2022 | 1 | 191.91 | 106.48 | 55.48 | 100 |
78 | KALIMPONG | SM/10743 | PWS SCHEME FROM UTISHEY JHORA TO LOWER YOGDA | New | Junior Engineer-2,Junior Engineer-II | 17/02/2022 | 87 | 79.81 | 79.81 | 0.00 | 25/05/2022 | 1 | 76.69 | 25.28 | 32.96 | 90 |
79 | KALIMPONG | SM/10744 | PWS SCHEME FROM PARANG KHOLA TO MUNSONG CINCHONA PLANTATION | New | Junior Engineer-3,Junior Engineer-I | 17/02/2022 | 405 | 225.47 | 225.47 | 0.00 | 25/05/2022 | 1 | 294.49 | 177.46 | 60.26 | 100 |
80 | KALIMPONG | SM/10745 | PWS SCHEME FROM OKHERBOTEY JHORA TO DUN | New | Junior Engineer-2,Junior Engineer-II | 17/02/2022 | 90 | 91.35 | 91.35 | 0.00 | 26/05/2022 | 1 | 88.59 | 29.25 | 33.02 | 100 |
81 | KALIMPONG | SM/10746 | PWS SCHEME FROM PAREN KHOLA TO RANGPO DIVISON | New | 17/02/2022 | 205 | 194.83 | 194.83 | 0.00 | 25/05/2022 | 2 | 348.09 | 145.77 | 41.88 | 100 | |
82 | KALIMPONG | SM/10747 | PWS SCHEME FROM BHADRA JHORA TO CHOTTA SURUK | New | Junior Engineer-2,Junior Engineer-II | 17/02/2022 | 135 | 72.57 | 72.57 | 0.00 | 30/06/2022 | 1 | 70.29 | 34.47 | 49.04 | 100 |
83 | KALIMPONG | SM/10748 | PWS SCHEME FROM PHENTO SOURCE TO DUKA | New | Junior Engineer-3,Junior Engineer-III | 17/02/2022 | 143 | 165.77 | 165.77 | 0.00 | 25/05/2022 | 1 | 155.54 | 32.83 | 21.11 | 55 |
84 | KALIMPONG | SM/10749 | PWS SCHEME FROM KHARKHOLA TO SARDAR AND LOWER TOP LINE | New | Junior Engineer-4,Junior Engineer-I | 17/02/2022 | 105 | 105.72 | 105.72 | 0.00 | 25/05/2022 | 1 | 102.55 | 83.48 | 81.4 | 100 |
85 | KALIMPONG | SM/10750 | PWS SCHEME FROM BANGLA JHORA TO JOGITAR | New | Junior Engineer-4,Junior Engineer-I | 17/02/2022 | 60 | 65.73 | 65.73 | 0.00 | 25/05/2022 | 1 | 48.43 | 0.00 | 0 | 100 |
86 | KALIMPONG | SM/10751 | PWS SCHEME FROM MANDIR KHOLA TO TANYANG | New | Junior Engineer-3,Junior Engineer-III | 17/02/2022 | 195 | 214.24 | 214.24 | 0.00 | 26/05/2022 | 1 | 211.87 | 0.00 | 0 | 97 |
87 | KALIMPONG | SM/10752 | PWS SCHEME FROM SISNEY KHOLA TO NAJOK BUSTY | New | Junior Engineer-2,Junior Engineer-II | 17/02/2022 | 72 | 75.91 | 75.91 | 0.00 | 30/06/2022 | 1 | 73.59 | 12.51 | 17 | 100 |
88 | KALIMPONG | SM/10753 | PWS SCHEME FROM KHANI KHOLA TO CHUKIM | New | Junior Engineer-4,Junior Engineer-III | 17/02/2022 | 122 | 138.36 | 138.36 | 0.00 | 25/05/2022 | 1 | 134.25 | 65.72 | 48.95 | 100 |
89 | KALIMPONG | SM/10754 | PWS SCHEME FROM KAMZER KHOLA TO LOWER LOLAY | New | Junior Engineer-2,Junior Engineer-II | 17/02/2022 | 160 | 176.39 | 176.39 | 0.00 | 26/05/2022 | 1 | 174.61 | 17.64 | 10.1 | 100 |
90 | KALIMPONG | SM/10755 | PWS SCHEME FROM DHOBI KHOLA TO LOWER DALEP | New | Junior Engineer-3,Junior Engineer-II | 17/02/2022 | 160 | 201.10 | 201.10 | 0.00 | 25/05/2022 | 1 | 199.10 | 90.50 | 45.45 | 75 |
91 | KALIMPONG | SM/10756 | PWS SCHEME FROM KHARKHOLA TO LOWER REON | New | Junior Engineer-2,Junior Engineer-I | 17/02/2022 | 102 | 105.07 | 105.07 | 0.00 | 25/05/2022 | 1 | 101.69 | 24.38 | 23.97 | 75 |
92 | KALIMPONG | SM/10787 | Proposed surface water based Nabgaon Khasmahal PWSS to accommodate FHTC in Kalimpong-I Block within Kalimpong District under Neorakhola W/S & Mtc Division P.H.E Dte. | New | Junior Engineer III | 16/03/2022 | 613 | 975.33 | 975.33 | 0.00 | 12/07/2022 | 3 | 958.85 | 386.73 | 40.33 | 95 |
93 | KALIMPONG | SM/10791 | PROPOSED SURFACE WATER BASED KANKE BONG KHASMAHAL PWSS TO ACCOMMODATE FHTC IN KALIMPONG-I BLOCK WITHIN KALIMPONG DISTRICT UNDER NEORAKHOKA W/S & MTC. DIVISION, PHE DTE. | New | Junior Engineer IV | 16/03/2022 | 373 | 470.31 | 470.31 | 0.00 | 30/06/2022 | 1 | 448.31 | 35.18 | 7.85 | 85 |
94 | KALIMPONG | SM/10792 | PROPOSED SURFACE WATER BASED SAMALBONG KHASMAHAL PWSS TO ACCOMMODATE FHTC IN KALIMPONG-I BLOCK WITHIN KALIMPONG DISTRICT UNDER NEORAKHOKA W/S & MTC. DIVISION, PHE DTE. | New | Junior Engineer IV | 16/03/2022 | 457 | 606.74 | 606.74 | 0.00 | 12/07/2022 | 2 | 587.18 | 92.06 | 15.68 | 70 |
95 | KALIMPONG | SM/10793 | PROPOSED SURFACE WATER BASED NIMBONG KHASMAHAL PWSS TO ACCOMMODATE FHTC IN KALIMPONG-I BLOCK WITHIN KALIMPONG DISTRICT UNDER NEORAKHOKA W/S & MTC. DIVISION, PHE DTE. | New | Junior Engineer IV | 16/03/2022 | 342 | 731.44 | 731.44 | 0.00 | 12/07/2022 | 6 | 694.24 | 150.64 | 21.7 | 75 |
96 | KALIMPONG | SM/10820 | Mini Piped Water Supply Scheme for Lehti Forest Village under Block Gorubathan District Kalimpong | New | 16/03/2022 | 48 | 47.33 | 47.33 | 0.00 | 30/06/2022 | 2 | 179.68 | 0.00 | 0 | 0 | |
97 | KALIMPONG | SM/11312 | PURBA KABI GAON GRAVITY BASED PIPE WATER SUPPLY SCHEME | New | Junior Engineer IV | 16/03/2022 | 98 | 100.81 | 100.81 | 0.00 | 30/06/2022 | 1 | 96.46 | 0.00 | 0 | 98 |
98 | KALIMPONG | SM/11313 | SURFACE WATER BASED PARINAGAR KHASMAHAL PWSS TO ACCOMMODATE FHTC IN KALIMPONG-I BLOCK WITHIN KALIMPONG DISTRICT UNDER NEORAKHOKA W/S & MTC. DIVISION, PHE DTE. | New | Junior Engineer I | 16/03/2022 | 462 | 829.30 | 829.30 | 0.00 | 12/07/2022 | 7 | 763.43 | 267.21 | 35 | 70 |
99 | KALIMPONG | SM/11340 | PWS SCHEME FROM SAWRENI KHOLA TO NIM BUSTY | New | Junior Engineer-4,Junior Engineer-I | 17/02/2022 | 280 | 220.09 | 220.09 | 0.00 | 30/06/2022 | 1 | 174.02 | 0.00 | 0 | 85 |
100 | KALIMPONG | SM/11341 | PWS SCHEME FROM DEORALI KHOLA TO PAKANG | New | Junior Engineer-2,Junior Engineer-II | 17/02/2022 | 150 | 117.19 | 117.19 | 0.00 | 30/06/2022 | 1 | 113.45 | 55.66 | 49.06 | 100 |
101 | KALIMPONG | SM/11342 | PWS SCHEME FROM DALDALEY JHORA TO PASSABONG | New | Junior Engineer-2,Junior Engineer-II | 17/02/2022 | 65 | 100.52 | 100.52 | 0.00 | 30/06/2022 | 1 | 96.00 | 45.23 | 47.11 | 100 |
102 | KALIMPONG | SM/11343 | PWSS FROM BHARKHOP JHORA TO LOWER KAFFER | New | Junior Engineer-2,Junior Engineer-II | 17/02/2022 | 85 | 99.53 | 99.53 | 0.00 | 30/06/2022 | 1 | 96.58 | 47.28 | 48.95 | 100 |
103 | KALIMPONG | SM/11354 | PWS SCHEME FROM HARESAY JHORA TO MUNSI DHURA and KARBUTAR | New | Junior Engineer-3,Junior Engineer-III | 16/03/2022 | 106 | 143.23 | 143.23 | 0.00 | 21/09/2022 | 1 | 135.69 | 0.00 | 0 | 50 |
104 | KALIMPONG | SM/11376 | RIYONG FOREST & RIYANG RAILWAY STATION PIPED WATER SUPPLY SCHEME UNDER TEESTA G.P, BLOCK:-KALIMPONG-I, P.S:-KALIMPONG, DISTRICT:KALIMPONG. | New | Junior Engineer IV | 30/03/2022 | 147 | 191.02 | 191.02 | 0.00 | 12/07/2022 | 6 | 189.16 | 72.89 | 38.53 | 74 |
105 | KALIMPONG | SM/11377 | SUNTALAY KHASMAHAL PIPED WATER SUPPLY SCHEME UNDER TEESTA G.P, BLOCK:-KALIMPONG-I, P.S:-KALIMPONG, DISTRICT:KALIMPONG | New | Junior Engineer III | 30/03/2022 | 55 | 89.16 | 89.16 | 0.00 | 12/07/2022 | 2 | 92.09 | 0.00 | 0 | 56 |
106 | KALIMPONG | SM/11577 | DETAIL PROJECT REPORT OF SEPKHOLA PIPED WATER SUPPLY SCHEME (PWSS) UNDER MAZEOK FOREST, SAMTHAR G.P, BLOCK:-KALIMPONG-I, P.S:-KALIMPONG, DISTRICT:KALIMPONG. | New | Junior Engineer-4,Junior Engineer-II | 30/03/2022 | 32 | 47.54 | 47.54 | 0.00 | 28/09/2022 | 2 | 46.76 | 0.00 | 0 | 60 |
107 | KALIMPONG | SM/11578 | DETAIL PROJECT REPORT OF SURUK KHASMAHAL (THREE HABITATION) PIPED WATER SUPPLY SCHEME (PWSS) UNDER SAMTHAR G.P, BLOCK:-KALIMPONG-I, P.S:-KALIMPONG, DISTRICT:KALIMPONG | New | Junior Engineer-3,Junior Engineer-III | 30/03/2022 | 296 | 393.32 | 393.32 | 0.00 | 14/10/2022 | 2 | 374.22 | 88.17 | 23.56 | 95 |
108 | KALIMPONG | SM/11579 | DETAIL PROJECT REPORT OF LOWER DARA GAON AND UPPER & LOWER GAIRI GAON PIPED WATER SUPPLY SCHEME (PWSS) UNDER SAMTHAR G.P, BLOCK:-KALIMPONG-I, P.S:-KALIMPONG, DISTRICT:KALIMPONG. | New | Junior Engineer-3,Junior Engineer-III | 30/03/2022 | 249 | 312.68 | 312.68 | 0.00 | 14/10/2022 | 1 | 306.11 | 0.00 | 0 | 95 |
109 | KALIMPONG | SM/11806 | Mayrong Forest & Tendrabong Village ( Partly) Piped Water Supply Scheme (PWSS) under Sakyong G.P, Block- Kalimpong-II, P.S- Kalimpong, District: Kalimpong. | New | Junior Engineer III | 16/03/2022 | 139 | 204.57 | 204.57 | 0.00 | 12/08/2022 | 2 | 186.80 | 79.75 | 42.69 | 65 |
110 | KALIMPONG | SM/11955 | DETAIL PROJECT REPORT OF Dr. GRAHAM'S HOME (PART) PIPED WATER SUPPLY SCHEME (PWSS) UNDER DR. GRAHAM'S HOME G.P, BLOCK:-KALIMPONG-I, P.S:-KALIMPONG, DISTRICT:KALIMPONG | New | Junior Engineer-2,Junior Engineer-II | 20/05/2022 | 221 | 242.62 | 242.62 | 0.00 | 04/11/2022 | 1 | 229.27 | 0.00 | 0 | 100 |
111 | KALIMPONG | SM/12180 | GRAVITY BASED WATER SUPPLY SCHEME FOR SEOKBIR KHASMAHAL PWSS IN KALIMPONG-1 BLOCK, UNDER KALIMPONG DISTRICT | New | Junior Engineer-2,Junior Engineer-II | 20/05/2022 | 295 | 520.75 | 520.75 | 0.00 | 18/10/2022 | 1 | 400.34 | 0.00 | 0 | 100 |
112 | KALIMPONG | SM/12181 | GRAVITY BASED WATER SUPPLY SCHEME FOR SINGI KAHSMAHAL PWSS IN KALIMPONG-I BLOCK | New | Junior Engineer-2,Junior Engineer-II | 20/05/2022 | 514 | 695.67 | 695.67 | 0.00 | 03/11/2022 | 2 | 662.05 | 0.00 | 0 | 100 |
113 | KALIMPONG | SM/12629 | PROPOSED GRAVITY BASED & PUMPING BASED PIPED WATER SUPPLY SCHEME FOR PEDONG KHASMAHAL (PART) UNDER PEDONG G.P, BLOCK : KALIMPONG - II, DISTRICT:KALIMPONG | New | Junior Engineer-4 | 20/05/2022 | 588 | 752.80 | 752.80 | 0.00 | 29/09/2022 | 2 | 733.03 | 376.40 | 51.35 | 40 |
114 | KALIMPONG | SM/12630 | PROPOSED GRAVITY BASED & PUMPING BASED PIPED WATER SUPPLY SCHEME FOR KASHONE KHASMAHAL (PART) UNDER KASHONE G.P, BLOCK : KALIMPONG - II, DISTRICT:KALIMPONG | New | Junior Engineer-4,Junior Engineer-I | 20/05/2022 | 530 | 939.41 | 939.41 | 0.00 | 28/11/2022 | 2 | 888.80 | 0.00 | 0 | 90 |
115 | KALIMPONG | SM/13602 | MANOPONG FOREST (PART) PIPED WATER SUPPLY SCHEME | New | Junior Engineer-4,Junior Engineer-III | 20/05/2022 | 445 | 335.49 | 335.49 | 0.00 | 20/01/2023 | 5 | 327.61 | 2.66 | 0.81 | 69 |
116 | KALIMPONG | SM/13603 | LOLAY KHASMAHAL PIPED WATER SUPPLYSCHEME, BLOCK : KALIMPONG - II, DISTRICT :KALIMPONG | New | Junior Engineer-2,Junior Engineer-II | 20/05/2022 | 664 | 341.66 | 341.66 | 0.00 | 01/02/2023 | 4 | 333.80 | 0.55 | 0.16 | 83 |
117 | KALIMPONG | SM/13604 | DETAILED PROJECT REPORT FORPROPOSED GRAVETY BASED & PUMPING BASEDPIPED WATER SUPPLY SCHEME FOR BONGKHASMAHAL, BLOCK : KALIMPONG - I, DISTRICT: Kalimpong | New | Junior Engineer III | 20/05/2022 | 1,015 | 564.20 | 564.20 | 0.00 | 14/12/2022 | 6 | 567.85 | 5.66 | 1 | 60 |
118 | KALIMPONG | SM/13605 | GRAVETY BASED PIPED WATER SUPPLY SCHEME FOR SAKIYONG KHASMAHAL (PART), BLOCK : KALIMPONG - II, DISTRICT : Kalimpong | New | Junior Engineer-2,Junior Engineer-II | 20/05/2022 | 991 | 419.43 | 419.43 | 0.00 | 04/05/2023 | 7 | 403.54 | 2.39 | 0.59 | 80 |
119 | KALIMPONG | SM/13606 | DETAILED PROJECT REPORT FOR PROPOSED GRAVITY BASED WATER SUPPLY SCHEME FOR PUDDUNG KHAS MAHAL PWSS,BLOCK : KALIMPONG - I, DISTRICT : KALIMPONG | New | Junior Engineer-4 | 20/05/2022 | 692 | 427.72 | 427.72 | 0.00 | 24/07/2023 | 1 | 345.67 | 0.00 | 0 | 60 |
120 | KALIMPONG | SM/13607 | SURUK PIPED WATER SUPPLY SCHEME | New | Junior Engineer-4,Junior Engineer-I | 05/07/2022 | 338 | 643.20 | 643.20 | 0.00 | 09/02/2023 | 3 | 640.68 | 0.00 | 0 | 75 |
121 | KALIMPONG | SM/13608 | GODAK BUSTY PIPED WATER SUPPLY SCHEME. | New | 05/07/2022 | 136 | 356.95 | 356.95 | 0.00 | 24/07/2023 | 1 | 350.72 | 0.00 | 0 | 50 | |
122 | KALIMPONG | SM/13609 | PAREN FOREST PIPED WATER SUPPLY SCHEME | New | 05/07/2022 | 46 | 133.18 | 133.18 | 0.00 | 17/07/2023 | 5 | 97.64 | 1.97 | 2.02 | 10 | |
123 | KALIMPONG | SM/13610 | AMBEOK TEA GARDEN PIPED WATER SUPPLY SCHEME | New | Junior Engineer-4,Junior Engineer-I | 15/07/2022 | 309 | 260.67 | 260.67 | 0.00 | 20/01/2023 | 2 | 257.62 | 0.00 | 0 | 85 |
124 | KALIMPONG | SM/13611 | SAMABIYONG TEA GARDEN PIPED WATER SUPPLY SCHEME. | New | Junior Engineer-4,Junior Engineer-I | 15/07/2022 | 383 | 648.24 | 648.24 | 0.00 | 09/02/2023 | 3 | 645.11 | 4.25 | 0.66 | 90 |
125 | KALIMPONG | SM/13612 | KUMAI FOREST PIPED WATER SUPPLY SCHEME. | New | 15/07/2022 | 245 | 290.97 | 290.97 | 0.00 | 05/06/2023 | 4 | 282.46 | 1.09 | 0.39 | 10 | |
126 | KALIMPONG | SM/13613 | SAMSING MIDDLE & UPPER PIPED WATER SUPPLY SCHEME. | New | 15/07/2022 | 303 | 351.35 | 351.35 | 0.00 | 26/05/2023 | 3 | 351.21 | 0.00 | 0 | 5 | |
127 | KALIMPONG | SM/13615 | PROPOSED GRAVITY BASED PIPED WATER SUPPLY SCHEME FOR LAVA FOREST UNDER LAVA GITBEONG G.P, BLOCK : KALIMPONG - II, DISTRICT:KALIMPONG | New | Junior Engineer III | 22/08/2022 | 35 | 101.26 | 101.26 | 0.00 | 01/02/2023 | 2 | 93.71 | 0.00 | 0 | 50 |
128 | KALIMPONG | SM/13616 | PROPOSED PUMPING BASED PIPED WATER SUPPLY SCHEME FOR MARIA KHASMAHAL (PART) (UPPER RABEK) UNDER KAGAY G.P, BLOCK : KALIMPONG - II, DISTRICT:KALIMPONG | New | Junior Engineer III | 22/08/2022 | 123 | 268.04 | 268.04 | 0.00 | 20/01/2023 | 4 | 271.84 | 0.92 | 0.34 | 15 |
129 | KALIMPONG | SM/13617 | PROPOSED PUMPING BASED PIPED WATER SUPPLY SCHEME FOR GIT DUBLING KHASMAHAL (PART) (POCHAK HABITATION) UNDER GITDABLING G.P, BLOCK : KALIMPONG - II, DISTRICT:KALIMPONG | New | Junior Engineer-4,Junior Engineer-I | 22/08/2022 | 240 | 442.25 | 442.25 | 0.00 | 14/12/2022 | 3 | 421.75 | 82.25 | 19.5 | 85 |
130 | KALIMPONG | SM/13621 | PROPOSED PUMPING BASED PIPED WATER SUPPLY SCHEME FOR TURZUM FOREST UNDER TEESTA G.P, BLOCK : KALIMPONG - I, DISTRICT:KALIMPONG | New | Junior Engineer-2,Junior Engineer-II | 22/08/2022 | 124 | 236.28 | 236.28 | 0.00 | 23/12/2022 | 6 | 254.88 | 0.00 | 0 | 90 |
131 | KALIMPONG | SM/13622 | BINDU PIPED WATER SUPPLY SCHEME | New | Junior Engineer-4,Junior Engineer-I | 22/08/2022 | 174 | 130.17 | 130.17 | 0.00 | 20/01/2023 | 2 | 123.46 | 0.00 | 0 | 75 |
132 | KALIMPONG | SM/13953 | SAKAM FOREST & DARJILING HILLDOARS TEA GARDEN PWSS | New | Junior Engineer-4 | 22/08/2022 | 663 | 882.37 | 882.37 | 0.00 | 09/02/2023 | 3 | 882.57 | 0.00 | 0 | 60 |
133 | KALIMPONG | SM/13954 | UPPER FAGU PIPED WATER SUPPLY SCHEME. | New | 22/08/2022 | 924 | 819.76 | 819.76 | 0.00 | 18/07/2023 | 4 | 808.19 | 0.00 | 0 | 5 | |
134 | KALIMPONG | SM/14170 | PANKHASARI KHASMAHAL PWSS | New | Junior Engineer III | 22/08/2022 | 666 | 1,201.07 | 1,201.07 | 0.00 | 06/02/2023 | 2 | 1,197.70 | 0.00 | 0 | 50 |
135 | KALIMPONG | SM/14171 | TODAY TANGTA KHASMAHAL PWSS | New | Junior Engineer III,Junior Engineer IV | 22/08/2022 | 970 | 1,635.15 | 1,635.15 | 0.00 | 01/02/2023 | 8 | 1,601.74 | 0.00 | 0 | 5 |
136 | KALIMPONG | SM/14172 | GORUBATHAN-I PWSS | New | Junior Engineer-4 | 22/08/2022 | 1,818 | 1,146.86 | 1,146.86 | 0.00 | 18/07/2023 | 2 | 1,132.56 | 0.00 | 0 | 20 |
137 | KALIMPONG | SM/14191 | SANTUK KHASMAHAL PIPED WATER SUPPLYSCHEME, BLOCK : KALIMPONG - II, DISTRICT :KALIMPONG | New | Junior Engineer-3,Junior Engineer-I | 20/05/2022 | 915 | 693.21 | 693.21 | 0.00 | 09/02/2023 | 4 | 678.65 | 0.00 | 0 | 60 |
138 | KALIMPONG | SM/14192 | DETAILED PROJECT REPORT FOR PROPOSED GRAVETY BASED & PUMPING BASED PIPED WATER SUPPLY SCHEME FOR PEMLINGKHASMAHAL, BLOCK : KALIMPONG - I, DISTRICT : Kalimpong | New | Junior Engineer-4,Junior Engineer-I | 20/05/2022 | 690 | 839.64 | 839.64 | 0.00 | 03/03/2023 | 6 | 798.06 | 0.00 | 0 | 85 |
139 | KALIMPONG | SM/14193 | DETAILED PROJECT REPORT FOR PROPOSED GRAVETY BASED & PUMPING BASED PIPED WATER SUPPLY SCHEME FOR YANGMAKHUM KHAS MAHAL (Part) PWSS,BLOCK : KALIMPONG - I, DISTRICT : Kalimpong | New | Junior Engineer-3 | 20/05/2022 | 724 | 701.20 | 701.20 | 0.00 | 26/05/2023 | 2 | 649.45 | 0.00 | 0 | 10 |
140 | KALIMPONG | SM/14194 | DETAILED PROJECT REPORT FOR PROPOSED GRAVITY BASED & PUMPING BASED WATER SUPPLY SCHEME FOR BHALUKHOP KHAS MAHAL PWSS, BLOCK : KALIMPONG - I, District : Kalimpong | New | Junior Engineer-2 | 20/05/2022 | 1,264 | 747.62 | 747.62 | 0.00 | 12/07/2023 | 3 | 739.94 | 0.00 | 0 | 50 |
141 | KALIMPONG | SM/15042 | GRAVITY BASED PIPED WATER SUPPLY SCHEME FOR LAVA FOREST (PART) UNDER LAVA GITBEONG G.P, BLOCK : KALIMPONG - II, DISTRICT:KALIMPONG | New | Junior Engineer IV | 30/09/2022 | 161 | 213.24 | 213.24 | 0.00 | 09/02/2023 | 3 | 196.09 | 0.00 | 0 | 50 |
142 | KALIMPONG | SM/15463 | GRAVITY BASED PIPED WATER SUPPLY SCHEME FOR PANKHASARI KHASMAHAL (PART) UNDER GORUBATHAN II G.P, BLOCK : GORUBATHAN, DISTRICT:KALIMPONG | New | Junior Engineer III | 30/09/2022 | 165 | 226.88 | 226.88 | 0.00 | 28/02/2023 | 3 | 48.72 | 0.00 | 0 | 10 |
143 | KALIMPONG | SM/15554 | KUMAI FOREST (PART) & KUMAI TEA GARDEN PWSS | New | Junior Engineer-4,Junior Engineer-I | 26/09/2022 | 278 | 248.56 | 248.56 | 0.00 | 03/03/2023 | 2 | 196.17 | 0.00 | 0 | 65 |
144 | KALIMPONG | SM/15640 | PROPOSED GRAVITY BASED PIPED WATER SUPPLY SCHEME FOR TISTA BAZAR DIF (PART) UNDER TEESTA G.P, BLOCK : KALIMPONG - I, DISTRICT:KALIMPONG | New | Junior Engineer-2,Junior Engineer-II | 09/09/2022 | 685 | 497.43 | 497.43 | 0.00 | 28/02/2023 | 5 | 487.78 | 0.00 | 0 | 96 |
145 | KALIMPONG | SM/15641 | PROPOSED GRAVITY BASED PIPED WATER SUPPLY SCHEME FOR KALIMPONG DANSONG FOREST UNDER TEESTA G.P, BLOCK : KALIMPONG - I, DISTRICT:KALIMPONG | New | Junior Engineer-2,Junior Engineer-II | 09/09/2022 | 275 | 214.02 | 214.02 | 0.00 | 28/02/2023 | 4 | 206.66 | 0.00 | 0 | 100 |
146 | KALIMPONG | SM/15642 | PROPOSED PUMPING BASED PIPED WATER SUPPLY SCHEME FOR RAMBI BAZAR D I F UNDER TEESTA G.P, BLOCK : KALIMPONG - I, DISTRICT:KALIMPONG | New | Junior Engineer-2,Junior Engineer-II | 09/09/2022 | 314 | 211.63 | 211.63 | 0.00 | 28/02/2023 | 4 | 208.04 | 96.35 | 46.31 | 99 |
147 | KALIMPONG | SM/15643 | PROPOSED GRAVITY BASED PIPED WATER SUPPLY SCHEME FOR LADAM KHASMAHAL (PART) UNDER KAGAY G.P, BLOCK:KALIMPONG - II, DISTRICT:KALIMPONG | New | Junior Engineer-2,Junior Engineer-II | 09/09/2022 | 169 | 300.21 | 300.21 | 0.00 | 28/02/2023 | 2 | 284.60 | 0.00 | 0 | 85 |
148 | KALIMPONG | SM/15644 | PROPOSED GRAVITY BASED & PUMPING BASED PIPED WATER SUPPLY SCHEME FOR GITDUBLING KHASMAHAL (PART) UNDER GITDUBLING G.P, BLOCK : KALIMPONG-II DISTRICT:KALIMPONG | New | Junior Engineer-4,Junior Engineer-I | 09/09/2022 | 538 | 650.72 | 650.72 | 0.00 | 10/05/2023 | 3 | 629.87 | 0.00 | 0 | 57 |
149 | KALIMPONG | SM/15645 | PROPOSED GRAVITY BASED & PUMPING BASED PIPED WATER SUPPLY SCHEME FOR GITBEONG KHASMAHAL UNDER LAVA GITBEONG G.P, BLOCK : KALIMPONG-II DISTRICT:KALIMPONG | New | Junior Engineer-4,Junior Engineer-I | 09/09/2022 | 651 | 973.41 | 973.41 | 0.00 | 10/05/2023 | 2 | 943.34 | 0.00 | 0 | 68 |
150 | KALIMPONG | SM/15646 | DETAIL PROJECT REPORT OF PALLA KHASMAHAL PIPED WATER SUPPLY SCHEME (PWSS) UNDER LOLAY G.P, BLOCK:-KALIMPONG-II, P.S:-KALIMPONG, DISTRICT:KALIMPONG | New | Junior Engineer-2,Junior Engineer-II | 09/09/2022 | 171 | 226.84 | 226.84 | 0.00 | 28/02/2023 | 4 | 228.92 | 0.00 | 0 | 96 |
151 | KALIMPONG | SM/15937 | KUMAI KHASMAHAL & KUMAI TEA GARDEN PWSS | New | Junior Engineer-4,Junior Engineer-I | 09/09/2022 | 782 | 657.46 | 657.46 | 0.00 | 03/03/2023 | 2 | 642.32 | 0.00 | 0 | 75 |
152 | KALIMPONG | SM/16230 | KALIMPONG KHASMAHAL (PART) PIPED WATER SUPPLY SCHEME UNDER TASHIDING G.P, BLOCK-KALIMPONG-I, DISTRICT:-KALIMPONG | New | Junior Engineer-4,Junior Engineer-I | 28/12/2022 | 1,068 | 921.36 | 921.36 | 0.00 | 29/05/2023 | 3 | 919.45 | 0.00 | 0 | 70 |
153 | KALIMPONG | SM/16231 | KALIMPONG KHASMAHAL (PART) PIPED WATER SUPPLY SCHEME UNDER KALIMPONG G.P, BLOCK:-KALIMPONG-I, DISTRICT:-KALIMPONG | New | Junior Engineer-I | 28/12/2022 | 1,175 | 944.04 | 944.04 | 0.00 | 26/05/2023 | 2 | 855.25 | 0.00 | 0 | 50 |
154 | KALIMPONG | SM/16232 | PROPOSED GRAVITY BASED PIPED WATER SUPPLY SCHEME FOR YANG MAKUM KHASMAHAL (PART) UNDER YANGMAKUM G.P, BLOCK : KALIMPONG - I, DISTRICT:KALIMPONG | New | 28/12/2022 | 206 | 380.82 | 380.82 | 0.00 | 05/06/2023 | 2 | 378.20 | 0.00 | 0 | 0 | |
155 | KALIMPONG | SM/16233 | GRAVITY BASED AND PUMPING BASED PIPED WATER SUPPLY SCHEME FOR PAIYONG KHASMAHAL (PART) UNDER PAIYONG G.P, BLOCK : KALIMPONG - II, DISTRICT:KALIMPONG | New | Junior Engineer-2 | 28/12/2022 | 700 | 963.91 | 963.91 | 0.00 | 12/07/2023 | 2 | 882.06 | 0.00 | 0 | 75 |
156 | KALIMPONG | SM/16234 | GRAVITY BASED PIPED WATER SUPPLY SCHEME FOR MANGWA FOREST (PART) UNDER TEESTA G.P, BLOCK : KALIMPONG - I, DISTRICT:KALIMPONG | New | 28/12/2022 | 47 | 55.28 | 55.28 | 0.00 | 12/07/2023 | 4 | 55.59 | 2.27 | 4.08 | 10 | |
157 | KALIMPONG | SM/16235 | GRAVITY BASED PIPED WATER SUPPLY SCHEME FOR KAGEY KHASMAHAL (PART) UNDER KAGEY G.P, BLOCK : KALIMPONG II, DISTRICT:KALIMPONG | New | 28/12/2022 | 199 | 233.82 | 233.82 | 0.00 | 12/07/2023 | 2 | 209.91 | 0.00 | 0 | 50 | |
158 | KALIMPONG | SM/16511 | LINGSAY KHASMAHAL PIPED WATER SUPPLY SCHEME UNDER BLOCK: KALIMPONG-II, DISTRICT:-KALIMPONG | New | Junior Engineer-4 | 28/12/2022 | 1,013 | 964.71 | 964.71 | 0.00 | 05/06/2023 | 2 | 932.62 | 0.00 | 0 | 70 |
159 | KALIMPONG | SM/16512 | GRAVITY BASED PIPED WATER SUPPLY SCHEME FOR YOKPRINTAM KHASMAHAL (PART) UNDER SAMTHAR G.P, BLOCK : KALIMPONG - I, DISTRICT:KALIMPONG | New | Junior Engineer III,Junior Engineer-3 | 28/12/2022 | 136 | 160.61 | 160.61 | 0.00 | 28/04/2023 | 6 | 159.97 | 0.00 | 0 | 60 |
160 | KALIMPONG | SM/16513 | GRAVITY BASED PIPED WATER SUPPLY SCHEME FOR RANGPOO FOREST UNDER SANGASEY G.P, BLOCK : KALIMPONG II, DISTRICT:KALIMPONG | New | Junior Engineer-2,Junior Engineer-II | 28/12/2022 | 369 | 304.00 | 304.00 | 0.00 | 28/04/2023 | 5 | 263.12 | 0.00 | 0 | 100 |
161 | KALIMPONG | SM/16514 | PROPOSED GRAVITY BASED PIPED WATER SUPPLY SCHEME FOR LINGSAYKHA KHASMAHAL UNDER LINGSEKHA G.P, BLOCK : KALIMPONG - II, DISTRICT:KALIMPONG | New | Junior Engineer-3 | 28/12/2022 | 538 | 896.34 | 896.34 | 0.00 | 05/06/2023 | 2 | 879.30 | 0.00 | 0 | 20 |
162 | KALIMPONG | SM/16649 | GRAVITY BASED BASED PIPED WATER SUPPLY SCHEME FOR DALAPCHAN KHASMAHAL (PART) UNDER DALAPCHAND G.P, BLOCK : KALIMPONG - II, DISTRICT:KALIMPONG | New | Junior Engineer-3 | 28/12/2022 | 351 | 437.66 | 437.66 | 0.00 | 28/04/2023 | 5 | 382.40 | 0.00 | 0 | 50 |
163 | KALIMPONG | SM/16854 | PAGRAN BONG KHASMAHAL PWSS | New | Junior Engineer-2 | 28/12/2022 | 187 | 473.77 | 473.77 | 0.00 | 12/07/2023 | 4 | 391.06 | 0.00 | 0 | 90 |
164 | KALIMPONG | SM/18247 | PROPOSED GRAVITY BASED & PUMPING BASED PIPED WATER SUPPLY SCHEME FOR DUNGRA KHASMAHAL (PART) UNDER DUNGRA G.P, BLOCK : KALIMPONG - I, DISTRICT:KALIMPONG | New | 28/12/2022 | 946 | 1,350.54 | 1,350.54 | 0.00 | 18/07/2023 | 2 | 1,232.78 | 0.00 | 0 | 0 | |
165 | KALIMPONG | SM/18255 | PATEN GODAK KHASMAHAL PWSS | New | 15/07/2022 | 874 | 1,128.06 | 1,128.06 | 0.00 | 17/07/2023 | 4 | 1,123.22 | 0.00 | 0 | 5 | |
166 | KALIMPONG | SM/18322 | GRAVITY BASED WATER SUPPLY SCHEME FOR ICHA KHASMAHAL PWSS, BLOCK: -KALIMPONG-I, DISTRICT: KALIMPONG | New | 20/05/2022 | 1,196 | 1,040.03 | 1,040.03 | 0.00 | 18/07/2023 | 4 | 928.00 | 0.00 | 0 | 10 | |
167 | KALIMPONG | SM/18415 | NIM KHASMAHAL & PHASINTING KHASMAL PWSS | New | Junior Engineer-2 | 05/07/2022 | 475 | 1,069.70 | 1,069.70 | 0.00 | 17/08/2023 | 2 | 957.24 | 0.00 | 0 | 80 |
168 | KALIMPONG | SM/18442 | Augmentation of source cum creation of spring water storage of 80 ML water by improvement of and upgradation of Open Ground Reservoir /Lake at 3.2 Km from Algarah and other allied works to cover the uncovered areas of Kalimpong Block-I & Kalimpong Block-I | Augmentation | 28/12/2022 | 3,573 | 3,858.84 | 3,858.84 | 0.00 | 06/12/2023 | 3 | 3,837.59 | 0.00 | 0 | 50 | |
169 | KALIMPONG | SM/18443 | Providing piped water Supply Scheme for Fourteen 14 Nos of villages (part) under Kalimpong Block-I & Kalimpong Block-II in the district of Kalimpong under Neorakhola water Supply & Maintenance Division PHE Dte. | New | 28/12/2022 | 3,512 | 3,488.92 | 3,488.92 | 0.00 | 28/02/2023 | 22 | 2,929.12 | 0.00 | 0 | 50 | |
170 | KALIMPONG | SM/18589 | WATER SUPPLY SCHEME FOR LOLAY KHASMAHAL PWSS IN KALIMPONG II BLOCK UNDER KALIMPONG DISTRICT. | New | Junior Engineer-4 | 28/12/2022 | 1,130 | 1,104.14 | 1,104.14 | 0.00 | 07/08/2023 | 1 | 1,057.74 | 0.00 | 0 | 75 |
171 | KALIMPONG | SM/18823 | RANGO FOREST PWSS | New | 15/07/2022 | 1,892 | 1,664.29 | 1,664.29 | 0.00 | 21/09/2023 | 2 | 1,661.53 | 0.00 | 0 | 50 | |
172 | KALIMPONG | SM/19112 | DALINGKOT FOREST & DALINGMA KHASMAHAL PWSS | New | 15/07/2022 | 784 | 1,414.95 | 1,414.95 | 0.00 | 03/01/2024 | 3 | 1,408.44 | 0.00 | 0 | 100 | |
173 | KALIMPONG | SM/19176 | PROJECT REPORT FOR WATER SUPPLY SCHEME FOR SANGSER KHASMAHAL PWSS IN KALIMPONG II BLOCK UNDER KALIMPONG DISTRICT. | New | 22/08/2022 | 1,749 | 2,560.38 | 2,560.38 | 0.00 | 20/02/2024 | 11 | 2,452.06 | 0.00 | 0 | 10 | |
Total | 67,062 | 72,816.30 | 72,816.30 | 0.00 | # | 525 | 67,751.79 | 8,692.92 | # | # |