Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 74.42 46.49 62.47  
1 KALIMPONG Neorakhola W/S & Mtc.Div. Retrofitting for FHTC & Improvement of piped water supply scheme for Pedong Bazar & adjoining areas in connection with (JJM & Jal swapno) , SM/07872 Retrofitting Retrofitting for Functional Household Tap Connection (FHTC) of Piped Water Supply Scheme for Pedong Bazar and adjoining areas , Under Neorakhola W/S & Maintenance Division, P.H.Engineering Directorate, District- Kalimpong. Assistant Engineer I Junior Engineer III ORD/000050/2020-2021 187/NKWSMD 12/10/2020 60 LEGDEN PRADHAN 21.21 11.68 55.07 100
2 KALIMPONG Neorakhola W/S & Mtc.Div. Retrofitting for FHTC & Improvement of piped water supply scheme for Pedong Bazar & adjoining areas in connection with (JJM & Jal swapno) , SM/07872 Retrofitting Retrofitting in connection with improvement of piped water supply scheme for Pedong Bazar and adjoining areas under Neorakhola W/S & Mtc. Division, P.H.Engineering Directorate, District- Kalimpong. Assistant Engineer I Junior Engineer III ORD/000051/2020-2021 297/NKWSMD 25/01/2021 60 LEGDEN PRADHAN 35.86 30.52 85.11 100
3 KALIMPONG Neorakhola W/S & Mtc.Div. Retrofitting for FHTC & Improvement of piped water supply scheme for Pedong Bazar & adjoining areas in connection with (JJM & Jal swapno) , SM/07872 Retrofitting Laying of 65mm G.I. pipe from Upper Thukchu khola towards Pipli Dara under piped water supply scheme for Pedong Bazar and Adjoining Area in Dist-Kalimpong, Block-II, under Neorakhola W/S & Mtc Division under PHE Dte Kalimpong. Assistant Engineer I Junior Engineer III ORD/000102/2021-2022 269/NKWSMD 23/11/2021 30 LEGDEN PRADHAN 4.08 0.20 4.9 100
4 KALIMPONG Neorakhola W/S & Mtc.Div. Retrofitting for FHTC & Improvement of piped water supply scheme for Pedong Bazar & adjoining areas in connection with (JJM & Jal swapno) , SM/07872 Retrofitting Laying of 65mm G.I. pipe from Link road towards Pedong Bazar under piped water supply scheme for Pedong Bazar and Adjoining Area in Dist-Kalimpong, Block-II, under Neorakhola W/S & Mtc Division under PHE Dte Kalimpong. Assistant Engineer I Junior Engineer III ORD/000103/2021-2022 270/NKWSMD 23/11/2021 30 LEGDEN PRADHAN 4.71 4.09 86.84 100
5 KALIMPONG Neorakhola W/S & Mtc.Div. Retrofitting for FHTC & Improvement of piped water supply scheme for Pedong Bazar & adjoining areas in connection with (JJM & Jal swapno) , SM/07872 Retrofitting Restoration of pipeline of Piped Water Supply Scheme for Pedong Bazar adjoining areas damaged during this monsoon season. Assistant Engineer I Junior Engineer III ORD/000289/2023-2024 303/NKWSMD 27/02/2024 60 LEGDEN PRADHAN 8.56 0.00 0 100
Total 74.42 46.48 62.46