Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
25 1,939.94 597.43 30.8  
1 KALIMPONG Neorakhola W/S & Mtc.Div. Augmentation of Neorakhola Water Supply Scheme for extending FHTC Facility to the enroute habitations under Kalimpong Block-I & Block-II under Neorakhola W/S & Mtc Division ,PHE Dte., Kalimpong , SM/10052 Augmentation Replacement of 3 nos Damaged Steel Bridge with 3 nos New Steel bridge of 20m Span in between Ch no 252-253, 35 m span steel bridge in between chain no.04 to 05 and new tubular steel bridge of 20m span at chain no 63, namly (bridge no-64, bridge no-55 and bridge no-57) resting over concrete abutment on both the sides including construction of slope protection works for abutments under Neorakhola Water Supply Scheme under PHE Dte. Assistant Engineer II Junior Engineer IV ORD/000004/2022-2023 103/NKWSMD 13/04/2022 180 DHURBA KUMAR PRADHAN 169.64 46.27 27.28 47
2 KALIMPONG Neorakhola W/S & Mtc.Div. Augmentation of Neorakhola Water Supply Scheme for extending FHTC Facility to the enroute habitations under Kalimpong Block-I & Block-II under Neorakhola W/S & Mtc Division ,PHE Dte., Kalimpong , SM/10052 Augmentation Replacement of existing RCC bridge locally known as OLD English Bridge Bridge No 70 with New Steel bridge of 20m Span in between chain no-129 to 130 Span resting over concrete abutment on both the sides including construction of slope protection works for abutments under Neorakhola Water Supply Scheme under PHE Dte, Kalimpong Assistant Engineer I Junior Engineer IV ORD/000005/2022-2023 104/NKWSMD 13/04/2022 180 JUSTINE BHUTIA 50.25 0.00 0 99
3 KALIMPONG Neorakhola W/S & Mtc.Div. Augmentation of Neorakhola Water Supply Scheme for extending FHTC Facility to the enroute habitations under Kalimpong Block-I & Block-II under Neorakhola W/S & Mtc Division ,PHE Dte., Kalimpong , SM/10052 Augmentation Replacement of 4 nos Damaged Steel Bridge with 3 nos New Steel bridge of 15m span in between ch no-119-120 (Bridge no-58), steel bridge 10m span chain no ¿ 144 (Bridge no-69) new tubular Steel bridge of 10m span in between ch no-95 (Bridge no-61) and construction of RCC bridge at ch no-92 in place of bridge no 15(Dhalua to Dolay), including resting over concrete abutment on both the sides including construction of slope protection works for abutments under Neorakhola Water Supply Scheme under PHE Dte. Assistant Engineer I Junior Engineer III ORD/000006/2022-2023 105/NKWSMD 13/04/2022 180 THUPDEN BHUTIA 173.91 25.00 14.38 90
4 KALIMPONG Neorakhola W/S & Mtc.Div. Augmentation of Neorakhola Water Supply Scheme for extending FHTC Facility to the enroute habitations under Kalimpong Block-I & Block-II under Neorakhola W/S & Mtc Division ,PHE Dte., Kalimpong , SM/10052 Augmentation Laying of 406.5 mm OD M.S pipe from Off take structure to ch no 50 (1500 meters) between lava to thockchu including the carriage of pipe, cleaning & painting of pipe surface (inner & outer surface), construction of R.C.C thrust block along the stretch under Neorakhola water supply & Mtc Division, PHE Dte Kalimpong. Junior Engineer III ORD/000122/2021-2022 755/NKWSMD 28/02/2022 180 DHURBA KUMAR PRADHAN 71.47 0.00 0 0
5 KALIMPONG Neorakhola W/S & Mtc.Div. Augmentation of Neorakhola Water Supply Scheme for extending FHTC Facility to the enroute habitations under Kalimpong Block-I & Block-II under Neorakhola W/S & Mtc Division ,PHE Dte., Kalimpong , SM/10052 Augmentation Laying of 406.5 mm OD M.S pipe from ch no 50 to ch no 100 (1500 meters) between lava to thockchu including the carriage of pipe, cleaning & painting of pipe surface (inner & outer surface) , construction of R.C.C thrust block along the stretch under Neorakhola water supply & Mtc Division, PHE Dte Kalimpong. Assistant Engineer II Junior Engineer III ORD/000123/2021-2022 756/NKWSMD 28/02/2022 180 DAWA LAMA 71.25 0.00 0 0
6 KALIMPONG Neorakhola W/S & Mtc.Div. Augmentation of Neorakhola Water Supply Scheme for extending FHTC Facility to the enroute habitations under Kalimpong Block-I & Block-II under Neorakhola W/S & Mtc Division ,PHE Dte., Kalimpong , SM/10052 Augmentation Laying of 406.5 mm OD M.S pipe from ch no 100 to ch no 150 (1500 meters) between lava to thockchu including the carriage of pipe, cleaning & painting of pipe surface (inner & outer surface), construction of R.C.C thrust block along the stretch under Neorakhola water supply & Mtc Division ,PHE Dte Kalimpong. Junior Engineer III ORD/000124/2021-2022 757/NKWSMD 28/02/2022 180 MOHAN KUMAR RAI 71.21 0.00 0 0
7 KALIMPONG Neorakhola W/S & Mtc.Div. Augmentation of Neorakhola Water Supply Scheme for extending FHTC Facility to the enroute habitations under Kalimpong Block-I & Block-II under Neorakhola W/S & Mtc Division ,PHE Dte., Kalimpong , SM/10052 Augmentation Laying of 406.5 mm OD M.S pipe from ch no 150 to ch no 200 (1500 meters) between lava to thockchu including the carriage of pipe, cleaning & painting of pipe surface (inner & outer surface), construction of R.C.C thrust block along the stretch under Neorakhola water supply & Mtc Division ,PHE Dte Kalimpong. Assistant Engineer II Junior Engineer III ORD/000125/2021-2022 758/NKWSMD 28/02/2022 180 THUPDEN BHUTIA 73.05 0.00 0 0
8 KALIMPONG Neorakhola W/S & Mtc.Div. Augmentation of Neorakhola Water Supply Scheme for extending FHTC Facility to the enroute habitations under Kalimpong Block-I & Block-II under Neorakhola W/S & Mtc Division ,PHE Dte., Kalimpong , SM/10052 Augmentation Laying of 406.5 mm OD M.S pipe from ch no 200 to ch no 250 (1500 meters) between lava to thockchu including the carriage of pipe, cleaning & painting of pipe surface (inner & outer surface) , construction of R.C.C thrust block along the stretch under Neorakhola water supply & Mtc Division, PHE Dte Kalimpong. Junior Engineer III ORD/000126/2021-2022 759/NKWSMD 28/02/2022 180 KUMAR THAPA 73.24 0.00 0 0
9 KALIMPONG Neorakhola W/S & Mtc.Div. Augmentation of Neorakhola Water Supply Scheme for extending FHTC Facility to the enroute habitations under Kalimpong Block-I & Block-II under Neorakhola W/S & Mtc Division ,PHE Dte., Kalimpong , SM/10052 Augmentation Laying of 406.5 mm OD M.S pipe from ch no 250 to thukchu source (1500 meters) between lava to thockchu including the carriage of pipe, cleaning & painting of pipe surface (inner & outer surface) , construction of R.C.C thrust block along the stretch under Neorakhola water supply & Mtc Division ,PHE Dte Kalimpong. Junior Engineer III ORD/000127/2021-2022 760/NKWSMD 28/02/2022 180 BINOD TAMANG 73.24 0.00 0 0
10 KALIMPONG Neorakhola W/S & Mtc.Div. Augmentation of Neorakhola Water Supply Scheme for extending FHTC Facility to the enroute habitations under Kalimpong Block-I & Block-II under Neorakhola W/S & Mtc Division ,PHE Dte., Kalimpong , SM/10052 Augmentation Laying of 406.5 mm OD M.S pipe from thukchu source to ch no 50 (1500 meters) between thockchu source to Alagarah V notch including the carriage of pipe, cleaning & painting of pipe surface (inner & outer surface) , construction of R.C.C thrust block along the stretch under Neorakhola water supply & Mtc Division ,PHE Dte Kalimpong. Assistant Engineer I Junior Engineer IV ORD/000128/2021-2022 761/NKWSMD 28/02/2022 180 SONAM TOPGAY BHUTIA 72.76 0.00 0 0
11 KALIMPONG Neorakhola W/S & Mtc.Div. Augmentation of Neorakhola Water Supply Scheme for extending FHTC Facility to the enroute habitations under Kalimpong Block-I & Block-II under Neorakhola W/S & Mtc Division ,PHE Dte., Kalimpong , SM/10052 Augmentation Laying of 406.5 mm OD M.S pipe from ch no 50 to 100 (1500 meters) between thockchu source to Algarah V notch including the carriage of pipe, cleaning & painting of pipe surface (inner & outer surface), construction of R.C.C thrust block along the stretch under Neorakhola water supply & Mtc Division ,PHE Dte Kalimpong. Assistant Engineer I Junior Engineer IV ORD/000129/2021-2022 762/NKWSMD 28/02/2022 180 SANJAY GURUNG 72.79 0.00 0 0
12 KALIMPONG Neorakhola W/S & Mtc.Div. Augmentation of Neorakhola Water Supply Scheme for extending FHTC Facility to the enroute habitations under Kalimpong Block-I & Block-II under Neorakhola W/S & Mtc Division ,PHE Dte., Kalimpong , SM/10052 Augmentation Laying of 406.5 mm OD M.S pipe from ch no 100 to 150 (1500 meters) between thockchu source to Algarah V notch including the carriage of pipe, cleaning & painting of pipe surface (inner & outer surface) , construction of R.C.C thrust block along the stretch under Neorakhola water supply & Mtc Division, PHE Dte Kalimpong. Assistant Engineer I Junior Engineer IV ORD/000130/2021-2022 763/NKWSMD 28/02/2022 180 SONAM TOPGAY BHUTIA 70.73 0.00 0 0
13 KALIMPONG Neorakhola W/S & Mtc.Div. Augmentation of Neorakhola Water Supply Scheme for extending FHTC Facility to the enroute habitations under Kalimpong Block-I & Block-II under Neorakhola W/S & Mtc Division ,PHE Dte., Kalimpong , SM/10052 Augmentation Laying of 406.5 mm OD M.S pipe from ch no 150 to 200 (1500 meters) between Thockchu source to Algarah V notch including the carriage of pipe, cleaning & painting of pipe surface (inner & outer surface), construction of R.C.C thrust block along the stretch under Neorakhola water supply & Mtc Division, PHE Dte Kalimpong. Assistant Engineer I Junior Engineer IV ORD/000131/2021-2022 764/NKWSMD 28/02/2022 180 HEMANT MOKTAN 70.72 0.00 0 0
14 KALIMPONG Neorakhola W/S & Mtc.Div. Augmentation of Neorakhola Water Supply Scheme for extending FHTC Facility to the enroute habitations under Kalimpong Block-I & Block-II under Neorakhola W/S & Mtc Division ,PHE Dte., Kalimpong , SM/10052 Augmentation Laying of 406.5 mm OD M.S pipe from ch no 200 to 262 (1860 meters) between thockchu source to Algarah V notch including the carriage of pipe, cleaning & painting of pipe surface (inner & outer surface) , construction of R.C.C thrust block along the stretch under Neorakhola water supply & Mtc Division ,PHE Dte Kalimpong. Assistant Engineer I Junior Engineer IV ORD/000132/2021-2022 765/NKWSMD 28/02/2022 180 JUSTINE BHUTIA 91.64 0.00 0 0
15 KALIMPONG Neorakhola W/S & Mtc.Div. Augmentation of Neorakhola Water Supply Scheme for extending FHTC Facility to the enroute habitations under Kalimpong Block-I & Block-II under Neorakhola W/S & Mtc Division ,PHE Dte., Kalimpong , SM/10052 Augmentation Laying of 406.5 mm OD M.S pipe from ch no 262 to Algarah v notch (1890 meters) between thukchu source to Algarah V notch including the carriage of pipe, cleaning & painting of pipe surface (inner & outer surface) , construction of R.C.C thrust block along the stretch of Neorakhola water supply & Mtc Division, PHE Dte Kalimpong Assistant Engineer I Junior Engineer IV ORD/000133/2021-2022 766/NKWSMD 28/02/2022 180 JUSTINE BHUTIA 92.40 0.00 0 0
16 KALIMPONG Neorakhola W/S & Mtc.Div. Augmentation of Neorakhola Water Supply Scheme for extending FHTC Facility to the enroute habitations under Kalimpong Block-I & Block-II under Neorakhola W/S & Mtc Division ,PHE Dte., Kalimpong , SM/10052 Augmentation Providing Protection & Restoration work of abutments including repair & maintenance of structural members of steel bridge no 1 to 9 from Neora source towards Dhalua source (ch no -29 to 219), under Neorakhola Water Supply & Mtc Division ,PHE Dte Kalimpong. Assistant Engineer II Junior Engineer III ORD/000134/2021-2022 767/NKWSMD 28/02/2022 180 DHURBA KUMAR PRADHAN 98.22 98.10 99.88 100
17 KALIMPONG Neorakhola W/S & Mtc.Div. Augmentation of Neorakhola Water Supply Scheme for extending FHTC Facility to the enroute habitations under Kalimpong Block-I & Block-II under Neorakhola W/S & Mtc Division ,PHE Dte., Kalimpong , SM/10052 Augmentation Providing Protection & Restoration work of abutments including repair & maintenance of structural members of steel bridge no 10 to 17 from Dhaula source towards lava (ch no 14 to 104) ,under Neorakhola Water Supply & Mtc Division ,PHE Dte Kalimpong. Junior Engineer III ORD/000135/2021-2022 768/NKWSMD 28/02/2022 180 BHUTIA AND SONS 86.41 80.57 93.24 85
18 KALIMPONG Neorakhola W/S & Mtc.Div. Augmentation of Neorakhola Water Supply Scheme for extending FHTC Facility to the enroute habitations under Kalimpong Block-I & Block-II under Neorakhola W/S & Mtc Division ,PHE Dte., Kalimpong , SM/10052 Augmentation Providing Protection & Restoration work of abutments including repair & maintenance of structural members of steel bridge no 18 to 24 from Dhaula source towards lava (ch no 104 to 194) ,under Neorakhola Water Supply & Mtc Division, PHE Dte Kalimpong. Junior Engineer III ORD/000136/2021-2022 769/NKWSMD 28/02/2022 180 THUPDEN BHUTIA 86.63 72.16 83.3 80
19 KALIMPONG Neorakhola W/S & Mtc.Div. Augmentation of Neorakhola Water Supply Scheme for extending FHTC Facility to the enroute habitations under Kalimpong Block-I & Block-II under Neorakhola W/S & Mtc Division ,PHE Dte., Kalimpong , SM/10052 Augmentation Providing Protection & Restoration work of abutments including repair & maintenance of structural members of steel bridge no 25 to 32 from Dhaula source towards lava (ch no 194 to 284) ,under Neorakhola Water Supply & Mtc Division ,PHE Dte Kalimpong. Junior Engineer III ORD/000137/2021-2022 770/NKWSMD 28/02/2022 180 DAWA LAMA 86.29 64.93 75.25 80
20 KALIMPONG Neorakhola W/S & Mtc.Div. Augmentation of Neorakhola Water Supply Scheme for extending FHTC Facility to the enroute habitations under Kalimpong Block-I & Block-II under Neorakhola W/S & Mtc Division ,PHE Dte., Kalimpong , SM/10052 Augmentation Providing Protection & Restoration work of abutments including repair & maintenance of structural members of steel bridge no 33 to 40 from dolay transit camp towards lava (ch no 303 to 395) ,under Neorakhola Water Supply & Mtc Division ,PHE Dte Kalimpong. Assistant Engineer I Junior Engineer III ORD/000138/2021-2022 771/NKWSMD 28/02/2022 180 JUSTINE BHUTIA 74.38 74.04 99.54 75
21 KALIMPONG Neorakhola W/S & Mtc.Div. Augmentation of Neorakhola Water Supply Scheme for extending FHTC Facility to the enroute habitations under Kalimpong Block-I & Block-II under Neorakhola W/S & Mtc Division ,PHE Dte., Kalimpong , SM/10052 Augmentation Providing Protection & Restoration work of abutments including repair & maintenance of structural members of steel bridge no 41 to 47 from dolay transit camp towards lava (ch no 395 to 487) ,under Neorakhola Water Supply & Mtc Division ,PHE Dte Kalimpong. Junior Engineer III ORD/000139/2021-2022 772/NKWSMD 28/02/2022 180 MOHAN KR. RAI 74.69 56.73 75.95 80
22 KALIMPONG Neorakhola W/S & Mtc.Div. Augmentation of Neorakhola Water Supply Scheme for extending FHTC Facility to the enroute habitations under Kalimpong Block-I & Block-II under Neorakhola W/S & Mtc Division ,PHE Dte., Kalimpong , SM/10052 Augmentation Providing Protection & Restoration work of abutments including repair & maintenance of structural members of steel bridge no 48 to 54 from dolay transit camp towards lava (ch no 520 to 612) ,under Neorakhola Water Supply & Mtc Division ,PHE Dte Kalimpong. Junior Engineer III ORD/000140/2021-2022 773/NKWSMD 28/02/2022 180 KUMAR THAPA 82.45 59.32 71.95 71
23 KALIMPONG Neorakhola W/S & Mtc.Div. Augmentation of Neorakhola Water Supply Scheme for extending FHTC Facility to the enroute habitations under Kalimpong Block-I & Block-II under Neorakhola W/S & Mtc Division ,PHE Dte., Kalimpong , SM/10052 Augmentation Providing Protection & Restoration work of abutments including repair & maintenance of structural members of steel bridge no 59 & 66 from saddle back towards thokchu (ch no-183 -300) under Neorakhola Water Supply & Mtc Division, PHE Dte Kalimpong. Assistant Engineer II Junior Engineer IV ORD/000141/2021-2022 774/NKWSMD 28/02/2022 180 BINOD TAMANG 50.59 20.31 40.15 47
24 KALIMPONG Neorakhola W/S & Mtc.Div. Augmentation of Neorakhola Water Supply Scheme for extending FHTC Facility to the enroute habitations under Kalimpong Block-I & Block-II under Neorakhola W/S & Mtc Division ,PHE Dte., Kalimpong , SM/10052 Augmentation (Continuation) Hiring of Vehicle for the Office of the Superintending Engineer, G.T.A-Circle, Public Health Engineering Directorate for the period of 6 (Six) Months, other than G.T.A Area from 01/02/2024 to 31/07/2024. Note: With effect from the date of issuing work order. Assistant Engineer II Junior Engineer I ORD/000292/2023-2024 170/NKWSMD 31/01/2024 180 SUJIT DEB 0.99 0.00 0 0
25 KALIMPONG Neorakhola W/S & Mtc.Div. Augmentation of Neorakhola Water Supply Scheme for extending FHTC Facility to the enroute habitations under Kalimpong Block-I & Block-II under Neorakhola W/S & Mtc Division ,PHE Dte., Kalimpong , SM/10052 Augmentation (Continuation) Hiring of Vehicle for the Office of the Superintending Engineer, G.T.A-Circle, Public Health Engineering Directorate for the period of 6 (Six) Months for G.T.A Area from 01/02/2024 to 31/07/2024. Note: With effect from the date of issuing work order. ORD/000330/2023-2024 169/NKWSMD 31/01/2024 180 YAMA CONSTRUCTIONS LLP 0.99 0.00 0 0
Total 1,939.94 597.42 30.8