B4- Dropped Scheme
Status Report on the Schemes Delisted after the Approval of SLSSC

Clear
Rs. in Lakh
Sl. No. District
As per Census (2011)
Division
Working Division
Scheme
Schemes that are Delisted after approval in SLSSC post 2019-2020 as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
SLSSC No.
SLSSC No.
SLSSC Date
Date of SLSSC in which the Scheme has been Approved
FHTCs
Modified FHTC Count after the appropriation in YDU considered under the Schemes Delisted after approval in SLSSC post 2019-2020 as per PHED-MIS
Cost
Modified Implementation Cost after the appropriation in YDU considered under the Schemes Delisted after approval in SLSSC post 2019-2020 as per PHED-MIS
5 26,363 3,403.53
1 HOWRAH Howrah Division Augmentation of Bagnan-CT Piped Water Supply Scheme,TSM/015861,SM/15283 Augmentation 7th (2022-2023) 26/09/2022 2200 772.67
2 HOWRAH Howrah Division Ray Chak Piped Water Supply Scheme,TSM/016142,SM/15286 New 7th (2022-2023) 26/09/2022 85 41.92
3 HOWRAH Howrah Division Augmentation of ground water based Paschim Khalna piped water supply scheme.,TSM/008168 Augmentation 1st (2021-2022) 19/08/2021 4208 1,029.87
4 HOWRAH Howrah Division Kultikari Piped Water Supply Scheme.,TSM/002240 New 1 / 2019-2020 05/11/2019 0 320.44
5 HOWRAH Howrah Division Retrofitting work including Functional Household Tap Connection (FHTC) from existing distribution system and other allied works Bally Jagacha Surface Water Based Water Supply Project,TSM/008443 Retrofitting 2nd (2021-2022) 08/09/2021 19870 1,238.63
Total 26,363 3,403.53