Sl. No. | District
As per Census (2011)
|
Division
Working Division
|
Scheme
Schemes that are Delisted after approval in SLSSC post 2019-2020 as per PHED-MIS
|
Scheme Category
Category of Scheme as per PHED-MIS
|
SLSSC No.
SLSSC No.
|
SLSSC Date
Date of SLSSC in which the Scheme has been Approved
|
FHTCs
Modified FHTC Count after the appropriation in YDU considered under the Schemes Delisted after approval in SLSSC post 2019-2020 as per PHED-MIS
|
Cost
Modified Implementation Cost after the appropriation in YDU considered under the Schemes Delisted after approval in SLSSC post 2019-2020 as per PHED-MIS
|
---|---|---|---|---|---|---|---|---|
3 | 1,058 | 960.28 | ||||||
1 | BANKURA | Bankura Division | Retrofitting works for creation of 'FHTC (Funtional House Hold Tap Connection' in connection with Jal Jeevan Mission (JJM) and JAL SWAPNA of SOMSAR W/S Scheme under Bishnupur Sub - Division of Bankura Division, PHE Dte. (Part-A),TSM/006019,SM/09307 | Retrofitting | 3rd (2020-2021) | 25/09/2020 | 1058 | 94.39 |
2 | BANKURA | Bankura Mechanical Division | Construction of Grid-Connected solar photo -voltaic system for Sonabundh PWS scheme Dist Bankura,TSM/018845 | Augmentation | 9th (2022-2023) | 16/11/2022 | 0 | 34.74 |
3 | BANKURA | Bankura Division | Augmentation of piped water supply schemes for Sanaband , Kargahir and its adjoining mouzas,TSM/005014 | Augmentation | 1 / 2019-2020 | 05/11/2019 | 0 | 831.15 |
Total | 1,058 | 960.28 |