B4- Dropped Scheme
Status Report on the Schemes Delisted after the Approval of SLSSC

Clear
Rs. in Lakh
Sl. No. District
As per Census (2011)
Division
Working Division
Scheme
Schemes that are Delisted after approval in SLSSC post 2019-2020 as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
SLSSC No.
SLSSC No.
SLSSC Date
Date of SLSSC in which the Scheme has been Approved
FHTCs
Modified FHTC Count after the appropriation in YDU considered under the Schemes Delisted after approval in SLSSC post 2019-2020 as per PHED-MIS
Cost
Modified Implementation Cost after the appropriation in YDU considered under the Schemes Delisted after approval in SLSSC post 2019-2020 as per PHED-MIS
3 18,650 1,239.89
1 PURBA BARDHAMAN Burdwan Division Rretrofitting wroks for Providing Functional Household Tap Connection (FHTC) within the commend area of Bhatar Piped Water Supply Scheme,TSM/006670,SM/08032 Retrofitting 4th (2020-2021) 04/12/2020 16945 921.25
2 PURBA BARDHAMAN Burdwan Division Augmentation of Jahannagar PWSS for providing Functional House Hold Tap Connection (FHTC),TSM/008346 Augmentation 1st (2021-2022) 19/08/2021 1705 230.99
3 PURBA BARDHAMAN Burdwan Division Providing House Connection from existing distribution system within the jurisdiction of Lohai Piped Water Supply Scheme.,TSM/005480 Augmentation 2nd / 2019-20 17/02/2020 0 87.65
Total 18,650 1,239.89