1 |
Neorakhola W/S Mnt. Division |
DIVISIONAL FOREST OFFICER |
PWS Scheme For St Marys and Geothals |
000110 |
|
FP/WB/WAT |
15/04/2024 |
9 |
44.36 |
PWS scheme for St. Mary's & Goethals (SM/15661) |
43.44 |
43.44 |
2 |
Neorakhola W/S Mnt. Division |
SRINIWAS AGARWAL |
PROPOSED GRAVITY BASED & PUMPING BASED PIPED WATER SUPPLY SCHEME FOR GITBEONG KHASMAHAL UNDER LAVA GITBEONG G.P, BLOCK : KALIMPONG - II, DISTRICT : KALIMPONG. |
000110ORD/000037/2023-202 |
ORD/000037/2023-2024 |
220/NKWSMD |
10/05/2023 |
1 |
388.36 |
PROPOSED GRAVITY BASED & PUMPING BASED PIPED WATER SUPPLY SCHEME FOR GITBEONG KHASMAHAL UNDER LAVA GITBEONG G.P, BLOCK : KALIMPONG-II DISTRICT:KALIMPONG (SM/15645) |
379.6 |
379.6 |
3 |
Neorakhola W/S Mnt. Division |
YAMA CONSTRUCTIONS LLP |
Hiring of vehicle for the office of Executive Engineer, Neorakhola Water Supply and Maintenance Division Public Health Engineering Directorate for the period from July 2024 to December 2024. |
000110ORD/000044/2024-202 |
ORD/000044/2024-2025 |
1205/NKWSM |
10/07/2024 |
4 |
1.51 |
RIYONG FOREST & RIYANG RAILWAY STATION PIPED WATER SUPPLY SCHEME UNDER TEESTA G.P, BLOCK:-KALIMPONG-I, P.S:-KALIMPONG, DISTRICT:KALIMPONG. (SM/11376) |
1.51 |
1.51 |
4 |
Neorakhola W/S Mnt. Division |
RAMESH KUMAR AGARWAL & CO |
PROPOSED GRAVITY BASED & PUMPING BASED PIPED WATER SUPPLY SCHEME FOR KALIMPONG KHASMAHAL PIPED WATER SUPPLY SCHEME, UNDER KALIMPONG G.P BLOCK : KALIMPONG - I, DISTRICT:KALIMPONG. |
000110ORD/000053/2023-202 |
ORD/000053/2023-2024 |
360/NKWSMD |
26/05/2023 |
1 |
495.49 |
KALIMPONG KHASMAHAL (PART) PIPED WATER SUPPLY SCHEME UNDER KALIMPONG G.P, BLOCK:-KALIMPONG-I, DISTRICT:-KALIMPONG (SM/16231) |
474.49 |
474.49 |
5 |
Neorakhola W/S Mnt. Division |
HARI PRASAD CHETTRI |
Water Supply Scheme For Upper & Lower Sumbuk Piped Water Supply Scheme in Pulbazar Block Under Darjeeling District. |
000110ORD/000059/2023-202 |
ORD/000059/2023-2024 |
418/NKWSMD |
05/06/2023 |
1 |
106.68 |
Up & Lr SUMBUK PIPED WATER SUPPLY SCHEME. (SM/15909) |
100.02 |
100.02 |
6 |
Neorakhola W/S Mnt. Division |
YAMA CONSTRUCTIONS LLP |
WATER SUPPLY SCHEME FOR TINGLING TEA GARDEN PIPED WATER SUPPLY SCHEME IN MIRIK BLOCK UNDER DARJEELING DISTRICT. |
000110ORD/000075/2023-202 |
ORD/000075/2023-2024 |
671/NKWSMD |
12/07/2023 |
1 |
147.8 |
PIPED WATER SUPPLY SCHEME FOR TINGLING TEA GARDEN,IN MIRIK BLOCK UNDER DARJEELING DISTRICT. (SM/18317) |
147.8 |
147.8 |
7 |
Neorakhola W/S Mnt. Division |
YAMA CONSTRUCTIONS LLP |
(Continuation) Hiring of Vehicle for the Office of the Superintending Engineer, G.T.A-Circle, Public Health Engineering Directorate for the period of 6 (Six) Months for G.T.A Area from 01/08/2024 to 31/01/2025.
Note:
With effect from the date of issui |
000110ORD/000117/2024-202 |
ORD/000117/2024-2025 |
1343/NKWSM |
31/07/2024 |
3 |
1.12 |
CONSTRUCTION OF SOURCE AND OPEN GROUND WATER RESERVOIR OF CAPACITY 20 ML AT SONADA TO ACCOMODATE TWO MOUZAS MAINLY SONADA FOREST & SONADA KHASMAHAL UNDER SUKHIA POKHARI BLOCK WITHIN DARJEEING DISTRICT UNDER KURSEONG DIVISION, PHED. (SM/19039) |
1.12 |
1.12 |
8 |
Neorakhola W/S Mnt. Division |
SUJIT DEB |
(Continuation) Hiring of Vehicle for the Office of the Superintending Engineer, G.T.A-Circle, Public Health Engineering Directorate for the period of 6 (Six) Months, other than G.T.A Area from 01/08/2024 to 31/01/2025.
Note:
With effect from the date |
000110ORD/000118/2024-202 |
ORD/000118/2024-2025 |
1349/NKWSM |
31/07/2024 |
3 |
1.04 |
DARJEELING PULBAZAR PUMPING-III PWSS (SM/18792) |
1.04 |
1.04 |
9 |
Neorakhola W/S Mnt. Division |
SRINIWAS AGARWAL |
SURFACE WATER BASED BONG KHAS MAHAL PWS SCHEME TO ACCOMMODATE FHTC IN KALIMPONG-I BLOCK WITHIN KALIMPONG DISTRICT UNDER NEORAKHOLA W/S & Mtc DIVISION, PHE DTE
|
000110ORD/000274/2022-202 |
ORD/000274/2022-2023 |
1876/NKWSM |
14/12/2022 |
1 |
50.34 |
DETAILED PROJECT REPORT FORPROPOSED GRAVETY BASED & PUMPING BASEDPIPED WATER SUPPLY SCHEME FOR BONGKHASMAHAL, BLOCK : KALIMPONG - I, DISTRICT: Kalimpong (SM/13604) |
48.98 |
48.98 |
10 |
Neorakhola W/S Mnt. Division |
CIVIL ENGINEERING CONSULTANCY |
Preparation of Re-draft of proposal including preparation of maps in KML file, DGPS Map, SOI Map, uploading of proposal in PARIVESH PORTAL for forest land diversion in 03 (three) number of scheme under JJM (Jal Jeevan Mission). |
000110ORD/000274/2023-202 |
ORD/000274/2023-2024 |
1594/NKWSM |
29/12/2023 |
1 |
0.57 |
PROJECT REPORT FOR WATER SUPPLY SCHEME FOR LIZZIEPUR TEA GARDEN PWSS IN KURSEONG BLOCK UNDER DARJEELING DISTRICT. (SM/16534) |
0.4 |
0.4 |
11 |
Neorakhola W/S Mnt. Division |
YAMA CONSTRUCTIONS LLP |
(Continuation) Hiring of Vehicle for the Office of the Superintending Engineer, G.T.A-Circle, Public Health Engineering Directorate for the period of 6 (Six) Months for G.T.A Area from 01/02/2024 to 31/07/2024.
Note:
With effect from the date of issui |
000110ORD/000330/2023-202 |
ORD/000330/2023-2024 |
169/NKWSMD |
31/01/2024 |
6 |
2.35 |
Augmentation of Neorakhola Water Supply Scheme for extending FHTC Facility to the enroute habitations under Kalimpong Block-I & Block-II under Neorakhola W/S & Mtc Division ,PHE Dte., Kalimpong (SM/10052) |
2.35 |
2.35 |