1 |
Coochbehar Division |
WBSEDCL |
SHIFTING OF EXISTING 25 KVA DTR |
000098 |
|
SM/MTBCCC2 |
30/05/2023 |
8 |
382.41 |
Rejuvenation of CHUNGERKHATA KHAGRIBARI Water Supply Scheme (SM/10711) |
382.41 |
382.41 |
2 |
Coochbehar Division |
SHIBA ENTERPRISE |
Construction of pump house, Boundary wall at Head work site and laying of Pipe line and other allied works at inconnection with augmentation of NAGAR CHANGRABANDHA (Zone-II) PWSS under Cooch Behar Division, PHED. (Part-B) |
000098ORD/000009/2022-202 |
ORD/000009/2022-2023 |
25/CD |
07/04/2022 |
1 |
3.93 |
Augmentation works for providing functional household tap connection within command area of NAGAR CHANGRABANDA Piped Water Supply Scheme (SM/10159) |
3.93 |
3.93 |
3 |
Coochbehar Division |
ABHIJIT KUMAR DAS |
Providing FHTC, Repairing of Pump house, boundary wall and laying new Pipe line and other allied works at inconnection with augmentation of NIJTARAF PWSS under Cooch Behar Division, PHED.(Part-C) |
000098ORD/000011/2022-202 |
ORD/000011/2022-2023 |
27/CD |
07/04/2022 |
1 |
27 |
Augmentation of NIJTARAF Piped water supply schemes (SM/10163) |
27 |
27 |
4 |
Coochbehar Division |
NO 1 GURIAHATI CO OP LABOUR CO |
Providing FHTC & Laying P/Line at PAKHIHAGA PWSS under Cooch Behar Division, PHED |
000098ORD/000020/2022-202 |
ORD/000020/2022-2023 |
36/CD |
07/04/2022 |
1 |
2.89 |
Retrofitting works for providing functional household tap connection(FHTC) eithin the cpmmand area of Pakhihaga Water Supply Scheme (SM/08150) |
2.89 |
2.89 |
5 |
Coochbehar Division |
LONGLAST PIPES (INDIA) PVT. LT |
Sinking of 250mm x 200 mm Big dia. Tube well with UPVC Pipes & Strainer at 3rd Site of BARO DHAPERCHATRA PWSS under Cooch Behar Division PHE Dte. |
000098ORD/000064/2022-202 |
ORD/000064/2022-2023 |
261/CD |
24/05/2022 |
1 |
12 |
Augmentation works for Providing Functional House Hold Tap Connection (FJTC) within command area of Baro Dhaperchatra Piped water supply Scheme. (SM/10158) |
12 |
12 |
6 |
Coochbehar Division |
GHOSH AND SAHA CONSTRUCTION |
Execution of different works related to AUG. of JAIGIR CHILAKHANA PWSS under JAL JEEVAN MISSION |
000098ORD/000104/2023-202 |
ORD/000104/2023-2024 |
718/CD |
25/07/2023 |
1 |
212.62 |
JAIGIR CHILAKHANA Piped Water Supply Scheme (SM/16155) |
212.62 |
212.62 |
7 |
Coochbehar Division |
BHARATI CHEMICAL AND SCIENTIFI |
Supply of different type of Chemicals for all Water Testing Laboratories under Cooch Behar Division, PHE Dte. |
000098ORD/000138/2022-202 |
ORD/000138/2022-2023 |
524/CD |
14/07/2022 |
1 |
2.4 |
Requirement of Chemical, Glassware and Instrument of Cooch Behar District Laboratory for NABL Accreditation under Cooch Behar Division P.H.E Dte. (SM/08722) |
2.4 |
2.4 |
8 |
Coochbehar Division |
BRAJA GOPAL SAHA |
Execution of different works related to BARA MADHUSUDAN PWSS under JAL JEEVAN MISSION |
000098ORD/000140/2023-202 |
ORD/000140/2023-2024 |
806/CD |
08/08/2023 |
1 |
5.3 |
BARA MADHUSUDAN PWSS (SM/16524) |
5.3 |
5.3 |
9 |
Coochbehar Division |
TISTA LABOUR CO-OP CONT AND CO |
Providing functional house hold tap connection within command area of GAJENDRAPUR CHOWRANGEE Piped Water Supply Scheme under Mathabhanga Sub-Division, P.H.E.Dte. Under Jaldhara Programme. Part-B |
000098ORD/000143/2022-202 |
ORD/000143/2022-2023 |
211/MTB |
26/07/2022 |
1 |
4.81 |
AUGMENTATION OF GROUND WATER BASED GAJENDRAPUR CHOWRANGEE PWSS HALDIBARI BLOCK WITHIN COOCH BEHAR DISTRICT UNDER COOCH BEHAR DIVISION, P.H.E. DTE. (SM/14933) |
4.81 |
4.81 |
10 |
Coochbehar Division |
M/S T R PARIK |
Execution of different works related to KHOLTA PWSS under JAL JEEVAN MISSION |
000098ORD/000161/2023-202 |
ORD/000161/2023-2024 |
892/CD |
31/08/2023 |
1 |
295.59 |
AUGMENTATION OF KHOLTA PIPED WATER SUPPLY SCHEME (SM/18788) |
295.59 |
295.59 |
11 |
Coochbehar Division |
RADIANT |
Preparation of DPR for Augmentation of KUCHLIBARI (Zone-II) Piped Water Supply Scheme under MATHABHANGA Sub-Division of Cooch Behar Division,P.H.E.Dte. |
000098ORD/000164/2022-202 |
ORD/000164/2022-2023 |
623/CD |
16/08/2022 |
1 |
3.08 |
AUGMENTATION OF GROUND WATER BASED KUCHLIBARI ZONE-II PWSS (SM/13225) |
3.08 |
3.08 |
12 |
Coochbehar Division |
CHAKRABORTY ENTERPRISE |
Execution of different works related to GURIAHATI PWSS under JAL JEEVAN MISSION |
000098ORD/000168/2023-202 |
ORD/000168/2023-2024 |
945/CD |
04/09/2023 |
1 |
29.97 |
AUGMENTATION OF GURIAHATI PIPED WATER SUPPLY SCHEME (SM/09298) |
29.97 |
29.97 |
13 |
Coochbehar Division |
RADIANT |
Preparation of DPR for Augmentation of HEMKUMARI (Zone-II) Piped Water Supply Scheme under MATHABHANGA Sub-Division of Cooch Behar Division,P.H.E.Dte. |
000098ORD/000169/2022-202 |
ORD/000169/2022-2023 |
628/CD |
16/08/2022 |
1 |
3.02 |
AUGMENTATION OF GROUND WATER BASE HEMKUMARI ZONE-II ACCOMODATE FHTC IN HALDIBARI BLOCK WITHIN COOCH BEHAR DISTRICT UNDE COOCH BEHAR DIVISION . (SM/13148) |
3.02 |
3.02 |
14 |
Coochbehar Division |
TAPAN CHANDA |
Providing FHTC Construction of 450 cum OHR and Laying of Pipe line Construction of Pump House & B/Wall Sinking of Tubewell at 3rd Site of RAMPUR ZONE ¿ I I PWSS under JAL JEEVAN MISSION (PART ¿A) |
000098ORD/000178/2022-202 |
ORD/000178/2022-2023 |
650/CD |
22/08/2022 |
2 |
60.06 |
Augmentation of RAMPUR Piped Water Supply Scheme (SM/11272) |
60.06 |
60.06 |
15 |
Coochbehar Division |
NO 1 GURIAHATI CO OP LABOUR CO |
Providing FHTC and Laying of pipe line, Const. Of Pump house , B/Wall at 3rd T/W site and other allied work of PAKHIHAGA PWSS under JAL JEEVAN MISSION (PART ¿A) |
000098ORD/000184/2022-202 |
ORD/000184/2022-2023 |
658/CD |
23/08/2022 |
2 |
34.62 |
Pakhihaga Piped Water Supply Scheme (SM/05058) |
34.62 |
34.62 |
16 |
Coochbehar Division |
DAS ENTERPRISE |
Providing FHTC & laying of Pipe line and other allied works at Madhya Hudumdanga PWSS under JAL JEEVAN MISSION |
000098ORD/000196/2022-202 |
ORD/000196/2022-2023 |
666/CD |
23/08/2022 |
1 |
7.18 |
Augmentation works for providing Functional House hold Tap Connection Within the Command Area of MADHYA HUDUMDANGA Piped Water Supply Scheme (SM/10141) |
7.18 |
7.18 |
17 |
Coochbehar Division |
SHREE RANI SATI ENTERPRISE |
Providing FHTC & Construction of pump house, Boundary wall (2nd t/w site) and laying of Pipe line other allied works at DUMNIGURI PWSS under JAL JEEVAN MISSION. (Part-C) |
000098ORD/000201/2022-202 |
ORD/000201/2022-2023 |
676/CD |
23/08/2022 |
1 |
15.35 |
Augmentation of Dumniguru Piped Water Supply Scheme. (SM/10008) |
15.35 |
15.35 |
18 |
Coochbehar Division |
RED STAR UNEMPLOYED CO -OPARAT |
Providing FHTC Laying Of Pipe Line And Construction Of Boundary Wall And Pump House at 3rd Site of NAGARERBARI (ZONE-II) PWSS under JAL JEEVAN MISSION |
000098ORD/000204/2022-202 |
ORD/000204/2022-2023 |
679/CD |
23/08/2022 |
1 |
36.99 |
Rejuvenation of NAGARERBARI Piped Water Supply Scheme (SM/10219) |
36.99 |
36.99 |
19 |
Coochbehar Division |
GOUTAM KUMAR DAS |
Constructions of 250 Cum OHR as per Departmental Design & drawing , Providing F.H.T.C ,New laying DI Pipe Line & other allied work at CHHAT RAMPUR PWSS under JAL JEEVAN MISSION (PART ¿D) |
000098ORD/000217/2022-202 |
ORD/000217/2022-2023 |
706/CD |
27/08/2022 |
1 |
3.9 |
AUGMENTATION OF GROUND WATER BASED CHHAT RAMPUR PWSS TUFANGANJ I BLOCK WITHIN COOCHBEHAR DISTRICT UNDER COOCHBEHAR DIVISION , PHE DTE (SM/16520) |
3.9 |
3.9 |
20 |
Coochbehar Division |
M/S PRADIP KUMAR PAL |
Providing FHTC Construction of 250 cum OHR Construction of Pump House & Sinking of Tubewell at JHAUKUTHI PWSS under JAL JEEVAN MISSION (PART ¿A) |
000098ORD/000221/2022-202 |
ORD/000221/2022-2023 |
710/CD |
27/08/2022 |
1 |
34.13 |
Augmentation of JHAUKUTHI Piped Water Supply Scheme (SM/10220) |
34.13 |
34.13 |
21 |
Coochbehar Division |
KHOKAN DAS |
Providing FHTC & other allied works at JHAUKUTHI PWSS under JAL JEEVAN MISSION |
000098ORD/000235/2022-202 |
ORD/000235/2022-2023 |
719/CD |
27/08/2022 |
1 |
3.68 |
Augmentation of JHAUKUTHI Piped Water Supply Scheme (SM/10220) |
3.68 |
3.68 |
22 |
Coochbehar Division |
CHAKRABORTY ENTERPRISE. |
Providing FHTC & Addl. laying of Pipe line and other allied works at DHALUABARI PWSS under JAL JEEVAN MISSION. |
000098ORD/000236/2022-202 |
ORD/000236/2022-2023 |
722/CD |
27/08/2022 |
1 |
5.2 |
Augmentation of dhaluabari water supply scheme (SM/09822) |
5.2 |
5.2 |
23 |
Coochbehar Division |
MS BIDYUT SARKAR |
Providing FHTC & Construction of Pump house at HW site & 2nd Site GOSANIMARI ZONE ¿ I PWSS under JAL JEEVAN MISSION |
000098ORD/000240/2022-202 |
ORD/000240/2022-2023 |
726/CD |
27/08/2022 |
1 |
3.77 |
Augmentation of Gosanimari piped water supply scheme. (SM/10150) |
3.77 |
3.77 |
24 |
Coochbehar Division |
SWAPAN KR.SARKAR |
Providing FHTC & Repairing of OHR B/Wall suplly Stairecase constn of Addl. Phouse at Dhaluabari PWSS under JAL JEEVAN MISSION |
000098ORD/000241/2022-202 |
ORD/000241/2022-2023 |
727/CD |
27/08/2022 |
1 |
20.57 |
Augmentation of dhaluabari water supply scheme (SM/09822) |
20.57 |
20.57 |
25 |
Coochbehar Division |
MATARA CONSTRUCTION CO. |
Construction of 600 cum OHR Providing FHTC & New UPVC Pipe line & other allied works (PART ¿A) atBALARAMPUR ZONE ¿ I PWSS under Cooch Behar Division, PHED |
000098ORD/000250/2021-202 |
ORD/000250/2021-2022 |
899/CD |
24/12/2021 |
1 |
37.69 |
Retrofitting Cum Rejuvenation of existing ground water baed Balarampur piped water supply scheme (SM/10006) |
37.69 |
37.69 |
26 |
Coochbehar Division |
BIJOY ROY |
Name of Work: Execution of different works related to KHAGRABARI AREA adjacent to CHAKCHAKA PWSS under JAL JEEVAN MISSION PART N |
000098ORD/000255/2023-202 |
ORD/000255/2023-2024 |
1022/CD |
22/09/2023 |
1 |
47.78 |
AUGUMENTATION OF GROUND WATER BASED CHAKCHAKA ZONE I PWSS COOCHBEHAR II BLOCK WITHIN COOCHBEHAR DISTRICT UNDER COOCHBEHAR DIVISION , PHE DTE (SM/15934) |
47.78 |
47.78 |
27 |
Coochbehar Division |
MATARA CONSTRUCTION CO. |
Providing FHTC Pump House SSPost & New UPVC Pipe line and other allied works (PART ¿B) at RAKHALMARI PWSS under Cooch Behar Division, PHED |
000098ORD/000269/2021-202 |
ORD/000269/2021-2022 |
948/CD |
31/12/2021 |
1 |
13.41 |
AUGMENTATION OF RAKHALMARI PIPED WATER SUPPLY SCHEME (SM/09299) |
13.41 |
13.41 |
28 |
Coochbehar Division |
S & P ENTERPRISE |
Construction of 150 cum OHR Providing FHTC Sinking 250mm X 200mm Big dia Tubewell & New UPVC/DI Pipe line & other allied works (PART ¿A) at RAKHALMARI PWSS under Cooch Behar Division, PHED |
000098ORD/000275/2021-202 |
ORD/000275/2021-2022 |
954/CD |
31/12/2021 |
1 |
38.41 |
AUGMENTATION OF RAKHALMARI PIPED WATER SUPPLY SCHEME (SM/09299) |
38.41 |
38.41 |
29 |
Coochbehar Division |
DULAL MAJUMDER |
Procurement of Chemicals Glassware & consumables for Mekhliganj Sub-District Water testing Laboratories |
000098ORD/000312/2022-202 |
ORD/000312/2022-2023 |
921/CD |
26/09/2022 |
1 |
3.13 |
Procurement of Chemicals & Consumables, Glassware etc. and Annual O & M of water testing laboratories . (SM/06622) |
3.13 |
3.13 |
30 |
Coochbehar Division |
SANKAR BANIK |
Providing F.H.T.C & Restoration of damage Pipeline allied Work at GOPALPUR Water Supply Scheme P.H.E Dte |
000098ORD/000317/2022-202 |
ORD/000317/2022-2023 |
926/CD |
26/09/2022 |
1 |
4.33 |
BARA GOPALPUR PIPED WATER SUPPLY SCHEME. (SM/13161) |
4.33 |
4.33 |
31 |
Coochbehar Division |
SENGUPTA ENTERPRISE |
Uploading charges of (https://ejalshakti.gov.in/imisreports/IMISReportLogin.aspx) related to FHTC under Jal Jeevan Mission in presence of JJM Login authority under Cooch Behar Division, PHE Dte. (Part-A) |
000098ORD/000398/2023-202 |
ORD/000398/2023-2024 |
1288/CD |
21/11/2023 |
1 |
0.97 |
AUGMENTATION OF BAKSIRHAT PIPED WATER SUPPLY SCHEME (SM/10050) |
0.97 |
0.97 |
32 |
Coochbehar Division |
SUBHAS CHANDRA ROY |
Laying of Pipe Line & Construction Of 250 CUM OHR At BARA PINJARER JHAR PWSS under JAL JEEVAN MISSION |
000098ORD/000400/2022-202 |
ORD/000400/2022-2023 |
1133/CD W |
03/11/2022 |
1 |
8.01 |
BARA PINJARIRJHAR PIPED WATER SUPPLY SCHEME. (SM/13163) |
8.01 |
8.01 |
33 |
Coochbehar Division |
MS BIDYUT SARKAR |
Providing FHTC & other allied works at GOSANIMARI ZONE - I PWSS under JAL JEEVAN MISSION |
000098ORD/000413/2022-202 |
ORD/000413/2022-2023 |
1224/CD |
28/11/2022 |
1 |
99.41 |
Augmentation of Gosanimari piped water supply scheme. (SM/10150) |
99.41 |
99.41 |
34 |
Coochbehar Division |
HIRAK CONSTRUCTION |
Providing FHTC & other allied works at RASIKBILL ZONE ¿ I PWSS under JAL JEEVAN MISSION |
000098ORD/000416/2022-202 |
ORD/000416/2022-2023 |
1226/CD |
28/11/2022 |
2 |
33.4 |
Augmentation of Rasikbil piped water supply scheme. (SM/09300) |
33.4 |
33.4 |
35 |
Coochbehar Division |
S AND P ENTERPRISE |
Construction of 450 cum OHR Providing FHTC & New UPVC Pipe line & other allied works (PART ¿A) at SITAI ZONE ¿ I I PWSS under Cooch Behar Division, PHED |
000098ORD/000420/2021-202 |
ORD/000420/2021-2022 |
1518/CD |
15/03/2022 |
1 |
149.54 |
Augmentation of Sitai piped water supply scheme. (SM/10147) |
149.54 |
149.54 |
36 |
Coochbehar Division |
NABIN DEBNATH |
Construction of 300 cum OHR Providing FHTC New Pipe line & other allied works (PART ¿A) at ANDARAN FULBARI ZONE-II PWSS under Cooch Behar Division, PHED |
000098ORD/000425/2021-202 |
ORD/000425/2021-2022 |
1475/CD |
10/03/2022 |
2 |
26.9 |
AUGMENTATION OF ANDARAN PHULBARI PIPED WATER SUPPLY SCHEME (SM/10049) |
26.9 |
26.9 |
37 |
Coochbehar Division |
SWAPAN KUMAR ROY |
Construction of 300 cum OHR Providing FHTC New Pipe line & other allied works (PART ¿A) at ANDARAN FULBARI ZONE-I PWSS under Cooch Behar Division, PHED |
000098ORD/000426/2021-202 |
ORD/000426/2021-2022 |
1476/CD |
10/03/2022 |
1 |
7 |
AUGMENTATION OF ANDARAN PHULBARI PIPED WATER SUPPLY SCHEME (SM/10049) |
7 |
7 |
38 |
Coochbehar Division |
HIRAK CONSTRUCTION |
Laying distribution system of pipe line with FHTC under Chandamari PWSS PHED. (Part-B-5) |
000098ORD/000427/2022-202 |
ORD/000427/2022-2023 |
195/SD |
27/06/2022 |
1 |
4.99 |
AUGMENTATION OF CHANDAMARI PIPED WATER SUPPLY SCHEME (SM/09302) |
4.99 |
4.99 |
39 |
Coochbehar Division |
SHIBA ENTERPRISE |
Providing FHTC, Construction of boundary wall, repairing of reservior,baoundary wall and laying new UPVC pipe line and other allied works at in-connection with augmentation KAUWARDARA PWSS under Cooch Behar Division, PHED.(Part-A) |
000098ORD/000428/2021-202 |
ORD/000428/2021-2022 |
1524/CD |
15/03/2022 |
2 |
27.63 |
Augmentation of Kauardara Water Supply Scheme (SM/09808) |
27.63 |
27.63 |
40 |
Coochbehar Division |
GHOSH AND SAHA CONSTRUCTION |
Providing FHTC, Sinking of big dia tube well( 250 mm X 200 mm), Construction of pump house, boundary wall, Repairing of boundary wall at head work site and laying of UPVC pipe line and other allied works at in-connection with augmentation NALANGIBARI P |
000098ORD/000430/2021-202 |
ORD/000430/2021-2022 |
1526/CD |
15/03/2022 |
1 |
33 |
Augumentation of Nalangibari Water Supply scheme (SM/09823) |
33 |
33 |
41 |
Coochbehar Division |
GHOSH AND SAHA CONSTRUCTION |
Constructions of 350 OHR as per Departmental Design & drawing , New laying of UPVC/DI Pipe Line(PART-A) , Providing F.H.T.C & other allied work at Kaminirghat PWSS under Cooch Behar Division , P.H.E Dte. |
000098ORD/000431/2021-202 |
ORD/000431/2021-2022 |
1515/CD |
15/03/2022 |
1 |
45 |
AUGMENTATION OF KAMINIRGHAT PIPED WATER SUPPLY SCHEME (SM/09810) |
45 |
45 |
42 |
Coochbehar Division |
Z STAR COMMOTRADE PVT LTD |
Providing FHTC Construction of 300 cum OHR and Laying of Pipe line at MORADANGA ZONE ¿ I I PWSS under JAL JEEVAN MISSION (PART ¿A) |
000098ORD/000431/2022-202 |
ORD/000431/2022-2023 |
1333/CD |
19/12/2022 |
1 |
13.17 |
Augmentation of MARADANGA Piped Water Supply Scheme (SM/14112) |
13.17 |
13.17 |
43 |
Coochbehar Division |
SAIMONS CO- OPARATIVE LAB CONT |
Providing FHTC, Construction of boundary wall, repairing of reservior,baoundary wall and laying new UPVC pipe line and other allied works at in-connection with augmentation KAUWARDARA PWSS under Cooch Behar Division, PHED. .(Part-B) |
000098ORD/000432/2021-202 |
ORD/000432/2021-2022 |
1527/CD |
15/03/2022 |
1 |
16.07 |
Augmentation of Kauardara Water Supply Scheme (SM/09808) |
16.07 |
16.07 |
44 |
Coochbehar Division |
SWAPAN SAHA |
Execution of different works related to GHUGHUMARI PWSS under JAL JEEVAN MISSION |
000098ORD/000451/2022-202 |
ORD/000451/2022-2023 |
1427/CD |
29/12/2022 |
1 |
5.55 |
Augmentation of GHUGHUMARI Piped Water Supply Scheme (SM/16531) |
5.55 |
5.55 |
45 |
Coochbehar Division |
GHOSH AND SAHA CONSTRUCTION |
Execution of different works related to NAHARHATBANDAR PWSS under JAL JEEVAN MISSIONSE NBC1/PHED A. O.: 977/1-5/NBC-1; DT: 19-01-23 |
000098ORD/000457/2022-202 |
ORD/000457/2022-2023 |
1508/CD |
19/01/2023 |
1 |
160 |
AUGMENTATION OF NAHARHAT BANDAR PIPED WATER SUPPLY SCHEME (SM/11486) |
160 |
160 |
46 |
Coochbehar Division |
NABIN DEBNATH |
Execution of different works related to PUTIMARI BAKSIBAS PWSS under JAL JEEVAN MISSIONSE NBC1/PHED A. O.: 978/1-5/NBC-1; DT: 19-01-23 |
000098ORD/000458/2022-202 |
ORD/000458/2022-2023 |
1509/CD |
19/01/2023 |
1 |
30.77 |
PUTIMARI BAKSIBAS PIPED WATER SUPPLY SCHEME. (SM/13816) |
30.77 |
30.77 |
47 |
Coochbehar Division |
HARIDAS GHOSH |
Execution of different works related to KOCHABARI PWSS under JAL JEEVAN MISSIONSE NBC1/PHED A. O.: 983/1-5/NBC-1; DT: 19-01-23 |
000098ORD/000463/2022-202 |
ORD/000463/2022-2023 |
1514/CD |
19/01/2023 |
1 |
60.87 |
KOCHABARI PIPED WATER SUPPLY SCHEME. (SM/13342) |
60.87 |
60.87 |
48 |
Coochbehar Division |
ASHIM KUMAR CHAKRABORTY |
Providing FHTC 3rd Site Pump House Boundary Wall SSPost with soak pit Sinking 250mm X 200mm Big dia Tubewell & New UPVC/DI/GI Pipe line and other allied works (PART ¿B) at CHILAKHANA PWSS under Cooch Behar Division, PHED |
000098ORD/000465/2021-202 |
ORD/000465/2021-2022 |
1605/CD |
24/03/2022 |
1 |
22.99 |
Augmentation of Chilakhana piped water supply scheme. (SM/10148) |
22.99 |
22.99 |
49 |
Coochbehar Division |
M/S. NITYAGOPAL BANIK |
Execution of different works related to CHHITRI BARI PWSS under JAL JEEVAN MISSIONSE NBC1/PHED A. O.: 985/1-5/NBC-1; DT: 19-01-23 |
000098ORD/000465/2022-202 |
ORD/000465/2022-2023 |
1516/CD |
19/01/2023 |
1 |
9.27 |
CHHITRI BARI PIPED WATER SUPPLY SCHEME. (SM/13213) |
9.27 |
9.27 |
50 |
Coochbehar Division |
MESSRS A.B.G CONSTRUCTION |
Providing FHTC 3rd Site Pump House Boundary Wall SSPost with soak pit Sinking 250mm X 200mm Big dia Tubewell & New UPVC/DI/GI Pipe line and other allied works (PART ¿B) at SITAI ZONE ¿ I I PWSS under Cooch Behar Division, PHED |
000098ORD/000466/2021-202 |
ORD/000466/2021-2022 |
1604/CD |
24/03/2022 |
1 |
5.72 |
Augmentation of Sitai piped water supply scheme. (SM/10147) |
5.72 |
5.72 |
51 |
Coochbehar Division |
CHAKRABORTY ENTERPRISE. |
PROVIDING FHTC LAYING OF PIPE LINE AT KALARAYER KUTHE (ZONE-II) PWSS under JAL JEEVAN MISSION (PART ¿C) |
000098ORD/000480/2022-202 |
ORD/000480/2022-2023 |
1535/CD |
20/01/2023 |
1 |
3.04 |
AUGMENTATION OF KALARAYERKUTHI PIPED WATER SUPPLY SCHEME (SM/14183) |
3.04 |
3.04 |
52 |
Coochbehar Division |
SHIBA ENTERPRISE |
Execution of different works related to SATKURA PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1015/1-5/NBC-1; Dt.: 24-01-23 |
000098ORD/000491/2022-202 |
ORD/000491/2022-2023 |
1556/CD |
24/01/2023 |
1 |
84.04 |
REJUVENATION OF SATKURA PIPED WATER SUPPLY SCHEME (SM/13160) |
84.04 |
84.04 |
53 |
Coochbehar Division |
Z STAR COMMOTRADE PVT LTD |
Execution of different works related to SITALKUCHI ZONE -III PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1014/1-5/NBC-1; Dt.: 24-01-23 |
000098ORD/000492/2022-202 |
ORD/000492/2022-2023 |
1557/CD |
24/01/2023 |
1 |
28.95 |
AUGMENTATION OF GROUND WATER BASED SITALKUCHI WATER SUPPLY SCHEME ZONE-III TO ACCOMMODATE FHTC IN SITALKUCHI BLOCK (SM/13379) |
28.95 |
28.95 |
54 |
Coochbehar Division |
MANABENDRA DE |
Execution of different works related to KUCHLIBARI Z 2 PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1013/1-5/NBC-1; Dt.: 24-01-23 |
000098ORD/000493/2022-202 |
ORD/000493/2022-2023 |
1558/CD |
24/01/2023 |
1 |
15 |
AUGMENTATION OF GROUND WATER BASED KUCHLIBARI ZONE-II PWSS (SM/13225) |
15 |
15 |
55 |
Coochbehar Division |
LONGLAST PIPES (INDIA) PVT. LT |
Sinking of 250mm x 200 mm Big dia. Tube well with UPVC Pipes & Strainer at 3rd Site of MARICHBARI PWSS under Cooch Behar Division PHE Dte. |
000098ORD/000500/2021-202 |
ORD/000500/2021-2022 |
1448/CD |
10/03/2022 |
1 |
10.65 |
Rejuvenation of MARICHBARI Water Supply Scheme (SM/10369) |
10.65 |
10.65 |
56 |
Coochbehar Division |
RAJAT ROY |
Providing FHTC Laying of Pipe Line & other allied works at SITALKUCHI ZONE III PWSS under JAL JEEVAN MISSION |
000098ORD/000505/2022-202 |
ORD/000505/2022-2023 |
1233/CD |
28/11/2022 |
1 |
7.9 |
AUGMENTATION OF GROUND WATER BASED SITALKUCHI WATER SUPPLY SCHEME ZONE-III TO ACCOMMODATE FHTC IN SITALKUCHI BLOCK (SM/13379) |
7.9 |
7.9 |
57 |
Coochbehar Division |
AUXILIARY TUBEWELL DRILLERS |
Sinking of 250mm x 200 mm Big dia. Tube well with UPVC Pipes & Strainer at Different Location ofANDARAN FULBARI ZONE I & II PWSS under Cooch Behar Division PHE Dte |
000098ORD/000507/2021-202 |
ORD/000507/2021-2022 |
1455/CD |
10/03/2022 |
1 |
10.72 |
AUGMENTATION OF ANDARAN PHULBARI PIPED WATER SUPPLY SCHEME (SM/10049) |
10.72 |
10.72 |
58 |
Coochbehar Division |
AUXILIARY TUBEWELL DRILLERS |
Sinking of 250mm x 200 mm Big dia. Tube well with UPVC Pipes & Strainer at 3rd Site of DEOCHARAIPWSS under Cooch Behar Division PHE Dte. |
000098ORD/000509/2021-202 |
ORD/000509/2021-2022 |
1457/CD |
10/03/2022 |
1 |
4.58 |
Rejuvenation of DEOCHARAI Water Supply Scheme (SM/10364) |
4.58 |
4.58 |
59 |
Coochbehar Division |
MS SSB CONSTRUCTION CO |
Execution of different works related to BHUTKURA PWSS under JAL JEEVAN MISSION |
000098ORD/000513/2022-202 |
ORD/000513/2022-2023 |
1631/CD |
08/02/2023 |
1 |
42.75 |
BHUTKURA PIPED WATER SUPPLY SCHEME (SM/14730) |
42.75 |
42.75 |
60 |
Coochbehar Division |
AMBITIOUS ENTERPRISE |
Execution of different works related to AUG. of KHATTIMARI ZONE-II PWSS under JAL JEEVAN MISSION |
000098ORD/000523/2022-202 |
ORD/000523/2022-2023 |
1678/CD |
13/02/2023 |
1 |
53.6 |
Augmentation of Ground Water Based Khattimari Zone-II PWSS (Dinhata-II) (SM/13153) |
53.6 |
53.6 |
61 |
Coochbehar Division |
GOUTAM KUMAR DAS |
Providing FHTC Works, Laying of pipe line Constructions of 3rd site Pump House, Boundary Wall at PANISALA W.S.S under Cooch Behar Division P.H.E.Dte. |
000098ORD/000528/2021-202 |
ORD/000528/2021-2022 |
1628/CD |
29/03/2022 |
1 |
2.89 |
Augmentation of Panisala PWSS. (SM/16526) |
2.89 |
2.89 |
62 |
Coochbehar Division |
BIJOY ROY |
Providing FHTC Works, Laying of pipe line Constructions of Switch Room, Boundary Wall at SINGIMARI PASCHIMPAR W.S.S under Cooch Behar Division P.H.E.Dte. PART A |
000098ORD/000533/2021-202 |
ORD/000533/2021-2022 |
1633/CD |
29/03/2022 |
2 |
40.95 |
Rejuvenation of SINGIMARI PASCHIMPAR Water Supply Scheme (SM/10362) |
40.95 |
40.95 |
63 |
Coochbehar Division |
MS BIDYUT SARKAR |
Execution of different works related to BAISGURI KHANDA PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1242/1-5/NBC-1; Dt.: 02-03-23 |
000098ORD/000552/2022-202 |
ORD/000552/2022-2023 |
1774/CD |
02/03/2023 |
1 |
39.28 |
BAISGURI KHANDA PIPED WATER SUPPLY SCHEME (SM/13284) |
39.28 |
39.28 |
64 |
Coochbehar Division |
MAHENDRA CHHETRI |
Execution of different works related to CHAUDANGA PWSS under JAL JEEVAN MISSION |
000098ORD/000553/2022-202 |
ORD/000553/2022-2023 |
1610/CD |
03/02/2023 |
1 |
5.73 |
CHAUDANGA PIPED WATER SUPPLY SCHEME. (SM/13146) |
5.73 |
5.73 |
65 |
Coochbehar Division |
DAS ENTERPRISE |
Execution of different works related to DEBOTTAR BAKSHIGANJ PWSS under JAL JEEVAN MISSION |
000098ORD/000555/2022-202 |
ORD/000555/2022-2023 |
1702/CD |
13/02/2023 |
1 |
35.11 |
Ground Water Based Piped Water Supply Scheme DEBOTTAR BAKSHIGANJ (BLOCK-HALDIBARI) (SM/13287) |
35.11 |
35.11 |
66 |
Coochbehar Division |
M/S BADAL CH SAHA |
Preparation of DPR for Bhoram Piped Water Supply Scheme under Cooch Behar Sadar Sub-Division of Cooch Behar Division, P.H.E. Dte. |
000098ORD/000557/2021-202 |
ORD/000557/2021-2022 |
1541/CD |
17/03/2022 |
1 |
6.75 |
Procurement of service consultants for preparation of DPR of New Piped Water Supply Scheme for uncovered rural area of Jalpaiguri, Alipurduar and Coochbehar District in West Bengal. (SM/11505) |
9.45 |
9.45 |
67 |
Coochbehar Division |
Z STAR COMMOTRADE PVT LTD |
Execution of different works related to GHOKSADANGA ZONE - II PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1243/1-5/NBC-1; Dt.: 02-03-23 |
000098ORD/000557/2022-202 |
ORD/000557/2022-2023 |
1782/CD |
02/03/2023 |
1 |
70 |
AUGMENTATION OF GHOKSADANGA PIPED WATER SUPPLY SCHEME (SM/11977) |
70 |
70 |
68 |
Coochbehar Division |
PALLAB BHAWAL |
Construction of 450 cum OHR Providing FHTC & New UPVC Pipe line & other allied works (PART ¿A) at SITAI ZONE ¿ I PWSS under Cooch Behar Division, PHED |
000098ORD/000559/2022-202 |
ORD/000559/2022-2023 |
1282/CD |
02/12/2022 |
2 |
145.83 |
Augmentation of Sitai piped water supply scheme. (SM/10147) |
145.83 |
145.83 |
69 |
Coochbehar Division |
M/S SOBHA & CO. |
Preparation of DPR for Angarkata Paradubi Piped Water Supply Scheme under Mathabhanga Sub-Division of Cooch Behar Division, P.H.E. Dte. |
000098ORD/000571/2021-202 |
ORD/000571/2021-2022 |
1387/CD |
04/03/2022 |
1 |
9.44 |
Procurement of service consultants for preparation of DPR of New Piped Water Supply Scheme for uncovered rural area of Jalpaiguri, Alipurduar and Coochbehar District in West Bengal. (SM/11505) |
9.44 |
9.44 |
70 |
Coochbehar Division |
PALLAB BHAWAL |
Execution of different works related to UCHALPUKURI ZONE - II PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1121/1-5/NBC-1; Dt.: 13-02-23 |
000098ORD/000572/2022-202 |
ORD/000572/2022-2023 |
1690/CD |
13/02/2023 |
1 |
5.42 |
Augmentation of Ground Water Based UCHALPUKURI ZONE-II Piped Water Supply Scheme to Accommodate FHTC in Mekhliganj Block within Cooch Behar District under Cooch Behar Division, P.H.E. Dte. (SM/13157) |
5.42 |
5.42 |
71 |
Coochbehar Division |
MALAY KR.DEB |
Execution of different works related to JIRANPUR PART B PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1119/1-5/NBC-1; Dt.: 13-02-23 |
000098ORD/000576/2022-202 |
ORD/000576/2022-2023 |
1856/CD |
14/03/2023 |
1 |
111.82 |
AUGMENTATION OF GROUND WATER JIRANPUR ZONE-I (B) ACCOMODATE FHTC IN HALDIBARI BLOCK WITHIN COOCH BEHAR DISTRICT UNDE COOCH BEHAR DIVISION (SM/13149) |
111.82 |
111.82 |
72 |
Coochbehar Division |
JAL PRAVAHIKA PRIVATE LIMITED |
Execution of different works related to MAHISHCHARU PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1207/1-5/NBC-1; Dt.: 01-03-23 |
000098ORD/000580/2022-202 |
ORD/000580/2022-2023 |
1770/CD |
02/03/2023 |
1 |
1.1 |
MAHISHCHARU PIPED WATER SUPPLY SCHEME. (SM/13207) |
1.1 |
1.1 |
73 |
Coochbehar Division |
SUBHAS CHANDRA ROY |
Execution of different works related to BARA GOPALPUR PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1109/1-5/NBC-1; Dt.: 13-02-23 |
000098ORD/000586/2022-202 |
ORD/000586/2022-2023 |
1671/CD |
13/02/2023 |
1 |
3.79 |
BARA GOPALPUR PIPED WATER SUPPLY SCHEME. (SM/13161) |
3.79 |
3.79 |
74 |
Coochbehar Division |
M/S TORSHA CONSTRUCTION |
Execution of different works related to NIJTARAF PWSS under JAL JEEVAN MISSION |
000098ORD/000587/2022-202 |
ORD/000587/2022-2023 |
1677/CD |
13/02/2023 |
1 |
12 |
NIJTARAF PIPED WATER SUPPLY SCHEME at HALDIBARI. (SM/13120) |
12 |
12 |
75 |
Coochbehar Division |
BENGAL YOUTH UN EMPLOYED ENGIN |
Execution of different works related to SAJHERPAR KHATALBARI PWSS under JAL JEEVAN MISSION |
000098ORD/000588/2022-202 |
ORD/000588/2022-2023 |
1676/CD |
13/02/2023 |
1 |
73.48 |
SAJHERPAR KHATALBARI (SM/13877) |
73.48 |
73.48 |
76 |
Coochbehar Division |
MS SSB CONSTRUCTION CO |
Execution of different works related to KHARIJA DURGANAGAR DWITIA KHANDA PWSS under JAL JEEVAN MISSION |
000098ORD/000592/2022-202 |
ORD/000592/2022-2023 |
1672/CD |
13/02/2023 |
1 |
1.99 |
KHARIJA DURGANAGAR DWITIYA KHANDA PWSS (SM/14449) |
1.99 |
1.99 |
77 |
Coochbehar Division |
S & P ENTERPRISE |
Execution of different works related to ABUAR PATHAR PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1335/1-5/NBC-1; Dt.: 24-03-23 |
000098ORD/000593/2022-202 |
ORD/000593/2022-2023 |
1963/CD |
24/03/2023 |
1 |
152.3 |
ABUAR PATHAR PWSS (SM/14202) |
152.3 |
152.3 |
78 |
Coochbehar Division |
M/S KAMAK ENGINEERS AND CO |
Execution of different works related to JORPATKI PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1233/1-5/NBC-1; Dt.: 02-03-23 |
000098ORD/000596/2022-202 |
ORD/000596/2022-2023 |
1788/CD |
02/03/2023 |
1 |
1.2 |
GROUND WATER BASED JORPATKI PIPED WATER SUPPLY SCHEME. (SM/14139) |
1.2 |
1.2 |
79 |
Coochbehar Division |
SHREE RANI SATI ENTERPRISE |
Execution of different works related to Aug. of MUKUL DANGA PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1377/1-5/NBC-1; Dt.: 28-03-23 |
000098ORD/000655/2022-202 |
ORD/000655/2022-2023 |
1999/CD |
28/03/2023 |
2 |
23.15 |
AUGMENTATION OF GROUND WATER BASED MUKUL DANGA PWSS MATHABHANGA - II BLOCK WITHIN COOCHBEHAR DISTRICT UNDER COOCHBEHAR DIVISION, PHE DTE (SM/16473) |
23.15 |
23.15 |
80 |
Coochbehar Division |
SHREE RANI SATI ENTERPRISE |
Execution of different works related to PHULBARI PART-A PWSS under JAL JEEVAN MISSIONSE,NBC-1,PHED A.O. No.: 1366/1-5/NBC-1; Dt.: 28-03-23 |
000098ORD/000657/2022-202 |
ORD/000657/2022-2023 |
1988/CD |
28/03/2023 |
1 |
50 |
AUGMENTATION OF GROUND WATER BASED PHULBARI PART A PWSS (SM/16518) |
50 |
50 |
81 |
Coochbehar Division |
PARAUDDIN MIAH |
Extension Work order for Hiring of Diesel Vehicle of Bolero Maxi cab for the Office use of Assistant Engineer, Cooch Behar Sadar Sub-Division, PHE Dte. for 6 Months (February 2023 to July 2023) |
000098ORD/000737/2022-202 |
ORD/000737/2022-2023 |
1575/CD |
31/01/2023 |
2 |
1.08 |
AUGMENTATION OF CHANDAMARI PIPED WATER SUPPLY SCHEME (SM/09302) |
1.08 |
1.08 |
82 |
Coochbehar Division |
GOUTAM KUMAR DAS |
Execution of different works related to SITALKUCHI Z2 PWSS under JAL JEEVAN MISSION |
000098ORD/000779/2022-202 |
ORD/000779/2022-2023 |
1695/CD |
13/02/2023 |
1 |
6.69 |
Augmentation of Ground Water Based Sitalkuchi Water Supply Scheme Zone-II to Accommodate FHTC in Sitalkuchi Block. (SM/13289) |
6.69 |
6.69 |
83 |
Coochbehar Division |
BIJOY ROY |
Execution of different works related to BOXIRHAT PWSS under JAL JEEVAN MISSION |
000098ORD/000792/2022-202 |
ORD/000792/2022-2023 |
1868/CD |
14/03/2023 |
1 |
15 |
AUGMENTATION OF BAKSIRHAT PIPED WATER SUPPLY SCHEME (SM/10050) |
15 |
15 |
84 |
Coochbehar Division |
UDAY CHAKI |
Execution of different works related to DAKSHIN BAJHEJAMA PWSS under JAL JEEVAN MISSION |
000098ORD/000799/2022-202 |
ORD/000799/2022-2023 |
1872/CD |
14/03/2023 |
1 |
1.17 |
Augmentation of Dakshin Bajejama Water Supply Scheme. (SM/09807) |
1.17 |
1.17 |
85 |
Coochbehar Division |
SWAPAN KR.SARKAR |
Training for improvement of Skillness of Pump Operator & Valve Operator of different PWSS of Cooch Behar-II Block held at khagrabari under Cooch Behar Division, PHED. |
000098ORD/000835/2022-202 |
ORD/000835/2022-2023 |
1617/CD/B |
03/02/2023 |
1 |
0.4 |
AUGMENTATION OF KHAGRABARI PIPED WATER SUPPLY SCHEME. (SM/13403) |
0.4 |
0.4 |