1 |
Balurghat Division |
000120BILL/00024/2022-202 |
BILL/00024/2022-2023 |
31/01/2023 |
RAIL BHOOMI CROSSING SEVA (IR- |
Jack Pushing of M.S. pipe of 200 mm dia. Through 600 mm dia R.C.C. Hume Pipe (NP4)/M.S. pipe by Hydraulic Jacking Technique method across Railway Track near Raghabpur (KM/TP-60/8-60/9) between Gangarampur and Rampur Bazar for Zone VII under Gangarampur Su |
000120 |
|
3214BD |
31/01/2023 |
6.6 |
Sub Surface Water Based Piped Water Supply Scheme for Fluoride Affected Areas of Gangarampur Block (SM/04696) |
6.6 |
3224/BD |
31/01/2023 |
FAD/002312/2022 |
02/02/2023 |
2884/DPHE-12/14 |
6.6 |
2 |
Balurghat Division |
000120BILL/00025/2022-202 |
BILL/00025/2022-2023 |
31/01/2023 |
RAIL BHOOMI CROSSING SEVA (IR- |
Jack Pushing of M.S. pipe of 300mm dia. Through 600 mm dia R.C.C. Hume Pipe (NP4)/M.S. pipe by Hydraulic Jacking Technique method across Railway Track near Vantara (KM/TP-51/9-52/0) between Buniadpur and Gangarampur for Zone IV under Gangarampur Sub Surfa |
000120 |
|
3222/BD |
31/01/2023 |
6.54 |
Sub Surface Water Based Piped Water Supply Scheme for Fluoride Affected Areas of Gangarampur Block (SM/04696) |
6.54 |
3224/BD |
31/01/2023 |
FAD/002312/2022 |
02/02/2023 |
2884/DPHE-12/14 |
6.54 |
3 |
Balurghat Division |
000120BILL/00300/2024-202 |
BILL/00300/2024-2025 |
05/11/2024 |
POPY ENTERPRISE |
Face lifting related works of Head Works Site compound for Zone ¿ I under Gangarampur Western Sector of Sub-Surface Based Piped Water Supply Scheme, in the District of Dakshin Dinajpur, under Balurghat Division, P.H. Engineering Dte. |
000120ORD/000085/2023-202 |
ORD/000085/2023-2024 |
904/BD |
25/07/2023 |
0.75 |
Providing Functional House Hold Tap Connection by Retrofitting of 13 nos Zones under Gangarampur Sub Surface Based Piped Water Supply Project in the District of Dakshin Dinajpur (Phase I) (SM/10024) |
0.75 |
2216/BD |
05/11/2024 |
FAD/002502/2024 |
14/11/2024 |
FAD/002502/2024 |
0.75 |