Sinking of Two Nos. Big Dia Tube Well (300 mm X 200 mm) with supply of uPVC pipes & Strainer having depth upto150 Mtr at KAPSIT PWSS of ARAMBAGH Sub-Division under Hooghly Division, PHE Dte. |
000075ORD/000501/2023-202 |
ORD/000501/2023-2024 |
2861/HUG |
20/09/2023 |
11.07 |
Source Augmentation of KAPSIT Piped Water Supply Scheme under Arambag Block (SM/15814) |
11.07 |
3192/Hug |
11/09/2024 |
FAD/001871/2024 |
12/09/2024 |
FAD/001871/2024 |
11.07 |
2 |
Hooghly Division |
000075BILL/00622/2024-202 |
BILL/00622/2024-2025 |
11/09/2024 |
PRASUN ENTERPRISE (PRASUN BISW |
Construction of 400 cum capacity OHR with 20 mtr. staging height including Soil Investigation work, Laying Distribution System, Rising Main & Interconnection between O.H.R, TW No-I & II, Construction of 1 No 5.4M X 3.6M Switch Room with Sanitary and W |
000075ORD/000746/2022-202 |
ORD/000746/2022-2023 |
682/HUG |
10/03/2023 |
61.16 |
NANDA PIPED WATER SUPPLY SCHEME (SM/12567) |
61.16 |
3192/Hug |
11/09/2024 |
FAD/001871/2024 |
12/09/2024 |
FAD/001871/2024 |
61.16 |
3 |
Hooghly Division |
000075BILL/00644/2024-202 |
BILL/00644/2024-2025 |
12/09/2024 |
M/S ALPHA CONSTRUCTION |
Construction of 3.6 m X 3.0 m Switch Room with Sanitary and Water Supply arrangement, Construction of Boundary Wall ,Laying rising main pipe for inter connection between Proposed T.W & Distribution of NASIBPUR Piped Water Supply Scheme under CHANDANNAGAR |
000075ORD/000745/2023-202 |
ORD/000745/2023-2024 |
384/HUG |
08/02/2024 |
13.39 |
GROUND BASED PWSS FOR NASIBPUR (SM/17627) |
13.39 |
3217/Hug |
12/09/2024 |
FAD/001892/2024 |
13/09/2024 |
FAD/001892/2024 |
13.39 |
4 |
Hooghly Division |
000075BILL/00647/2024-202 |
BILL/00647/2024-2025 |
12/09/2024 |
B.R SUPPLIERS |
Sinking of Two Nos. Big Dia Tube Well (300 mm X 200 mm) with supply of uPVC pipes & Strainer having depth upto150 Mtr at PRATAPNAGAR PWSS of ARAMBAGH Sub-Division under Hooghly Division, PHE Dte. |
000075ORD/000502/2023-202 |
ORD/000502/2023-2024 |
2862/HUG |
20/09/2023 |
11.04 |
Source Augmentation of PRATAPNAGAR Piped Water Supply Scheme under Arambag Block (SM/15807) |
11.04 |
3217/Hug |
12/09/2024 |
FAD/001892/2024 |
13/09/2024 |
FAD/001892/2024 |
11.04 |
5 |
Hooghly Division |
000075BILL/00649/2024-202 |
BILL/00649/2024-2025 |
12/09/2024 |
P.B. ENTERPRISE (PINTU BHADURI |
Construction of 900 cum capacity RCC OHR with 20.0 mtr. Staging height including soil investigation, T.W, LDS, Rising Main, FHTC & Construction of 4 Nos. Switch Room & Boundary wall at Proposed T.W Site For AUGMENTATION of BARAKAMALPUR (ZONE-II) Piped Wat |
000075ORD/000316/2023-202 |
ORD/000316/2023-2024 |
2391/HUG |
10/08/2023 |
204.31 |
AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR BARAKAMALPUR (SM/12369) |
204.31 |
3217/Hug |
12/09/2024 |
FAD/001892/2024 |
13/09/2024 |
FAD/001892/2024 |
204.31 |
6 |
Hooghly Division |
000075BILL/00667/2024-202 |
BILL/00667/2024-2025 |
19/09/2024 |
EXECUTIVE ENGINEER, HOOGHLY HI |
ROAD RESTORATION PAYMENT TO PWD FOR AKNA PANCHAYET NEAR MERIA MORE |
000075 |
|
512/H |
26/06/2024 |
45.38 |
DALIMBA PIPED W/S SCHEME UNDER POLBA DADPUR BLOCK (SM/12247) |
45.38 |
3260/Hug |
19/09/2024 |
FAD/001969/2024 |
20/09/2024 |
FAD/001969/2024 |
45.38 |
7 |
Hooghly Division |
000075BILL/00672/2024-202 |
BILL/00672/2024-2025 |
19/09/2024 |
EXECUTIVE ENGINEER, HOOGHLY HI |
ROAD RESTORATION PAYMENT TO PWD FOR ARAMBAGH TIROL ROAD |
000075 |
|
1962/11/26 |
14/12/2023 |
12.87 |
GROUND WATER BASED TIROL (ZONE-II) PIPED W/S SCHEME UNDER ARAMBAGH BLOCK (SM/15886) |
12.87 |
3260/Hug |
19/09/2024 |
FAD/001969/2024 |
20/09/2024 |
FAD/001969/2024 |
12.87 |
8 |
Hooghly Division |
000075BILL/00701/2024-202 |
BILL/00701/2024-2025 |
20/09/2024 |
M/S R.M. CONSTRUCTION |
SIBRAMBATI ZONE-II Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 150 cum capacity RCC OHR with 20.0 mtr Staging height including soil investigation & construction of switch-rooms & boundary walls at differen |
000075ORD/000800/2022-202 |
ORD/000800/2022-2023 |
937/HUG |
29/03/2023 |
42.12 |
Sibrambati (Zone-II) Piped Water Supply Scheme, Block-Singur, District-Hooghly (SM/15888) |
42.12 |
3286/Hug |
20/09/2024 |
FAD/001994/2024 |
23/09/2024 |
FAD/001994/2024 |
42.12 |
9 |
Hooghly Division |
000075BILL/00705/2024-202 |
BILL/00705/2024-2025 |
20/09/2024 |
M/S R K ENTERPRISE |
PURBBA KRISHNAPUR Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 200 cum capacity RCC OHR with 20.0 mtr. Staging height including soil investigation & construction of switch-rooms & boundary walls at different |
000075ORD/000177/2023-202 |
ORD/000177/2023-2024 |
1682/HUG |
08/06/2023 |
45.98 |
GROUND WATER BASED PURBBA KRISHNAPUR PIPED WATER SUPPLY SCHEME IN ARAMBAGH BLOCK UNDER HOOGHLY, HOOGHLY DISTRICT (SM/17625) |
45.98 |
3286/Hug |
20/09/2024 |
FAD/001994/2024 |
23/09/2024 |
FAD/001994/2024 |
45.98 |
10 |
Hooghly Division |
000075BILL/00707/2024-202 |
BILL/00707/2024-2025 |
20/09/2024 |
CONCORD PROJECTS PRIVATE LIMIT |
KALACHHARA Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC & construction of switch-room & boundary wall at Proposed TW site, under Chandannagar Sub-Division of Hooghly Division P.H.E Dte. Block Singur, District:- Hooghly [NEW |
000075ORD/000132/2023-202 |
ORD/000132/2023-2024 |
1484/HUG |
19/05/2023 |
58.76 |
KALACHHARA PIPED WATER SUPPLY SCHEME (SM/18100) |
58.76 |
3286/Hug |
20/09/2024 |
FAD/001994/2024 |
23/09/2024 |
FAD/001994/2024 |
58.76 |
11 |
Hooghly Division |
000075BILL/00709/2024-202 |
BILL/00709/2024-2025 |
20/09/2024 |
MAA TARA CONSTRUCTION |
MAHISHTIKRI ZONE-I Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC & construction of switch-rooms & boundary walls at different TW site under HARIPAL Block, District:- Hooghly [NEW SCHEME] |
000075ORD/000195/2023-202 |
ORD/000195/2023-2024 |
1786/HUG |
16/06/2023 |
62.06 |
Mahishtikri (Zone-I) Piped Water Supply Scheme, Block- Haripal, District-Hooghly (SM/16979) |
62.06 |
3286/Hug |
20/09/2024 |
FAD/001994/2024 |
23/09/2024 |
FAD/001994/2024 |
62.06 |
12 |
Hooghly Division |
000075BILL/00712/2024-202 |
BILL/00712/2024-2025 |
20/09/2024 |
GEE BEE NIRMAN CO PRIVATE LIMI |
Sinking of 5 nos. 300 X200 mm dia Tube Well 210 mtr. Depth by D.R. Rig method using UPVC pipe (CD) and UPVC Deep Well Screen (RDS) For DASHGHARA ZONE-II (1 NO.), GURBARI, SHRIRAMPUR W/S Scheme under CHISURAH Sub-Division of Hooghly Division, P.H.E. Dte. |
000075ORD/000325/2023-202 |
ORD/000325/2023-2024 |
2408/HUG |
11/08/2023 |
22.24 |
GURBARI PIPED W/S SCHEME UNDER DHANIAKHALI BLOCK (SM/12254) |
11.81 |
3286/Hug |
20/09/2024 |
FAD/001994/2024 |
23/09/2024 |
FAD/001994/2024 |
11.81 |
13 |
Hooghly Division |
000075BILL/00742/2024-202 |
BILL/00742/2024-2025 |
24/09/2024 |
P.B. ENTERPRISE (PINTU BHADURI |
GOBINDANAGAR (ZONE-I), KOTA, KUMURSA Piped Water Supply Scheme with TW, Switch room, boundary wall, rising main, LDS, FHTC & construction of RCC OHR with 20 mtr. Staging height including soil investigation work at GOGHAT-I Block under ARAMBAGH Sub-Divisio |
000075ORD/000159/2023-202 |
ORD/000159/2023-2024 |
1602/HUG |
01/06/2023 |
54.17 |
GROUND WATER BASED KOTA PIPED WATER SUPPLY SCHEME IN GOGHAT-I BLOCK UNDER HOOGHLY, HOOGHLY DISTRICT (SM/13320) |
37.87 |
3325/Hug |
24/09/2024 |
FAD/002055/2024 |
26/09/2024 |
FAD/002055/2024 |
37.87 |
14 |
Hooghly Division |
000075BILL/00744/2024-202 |
BILL/00744/2024-2025 |
24/09/2024 |
M/S R.M. CONSTRUCTION |
PUKHURIA Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 200 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at different TW |
000075ORD/000272/2023-202 |
ORD/000272/2023-2024 |
2290/HUG |
03/08/2023 |
41.47 |
GROUND WATER BASED PUKHURIA PIPED WATER SUPPLY SCHEME IN GOGHAT-II BLOCK UNDER HOOGHLY, HOOGHLY DISTRICT (SM/17626) |
41.47 |
3325/Hug |
24/09/2024 |
FAD/002055/2024 |
26/09/2024 |
FAD/002055/2024 |
41.47 |
15 |
Hooghly Division |
000075BILL/00747/2024-202 |
BILL/00747/2024-2025 |
24/09/2024 |
GARHBETA - I UNEMPLOYED YOUTH |
Sinking of 3rd tube-well by D.R. Rig method, Construction of 3.6 m X 3.0 m Switch Room with Sanitary and Water Supply arrangement, Construction of Boundary Wall, Laying rising main pipe for inter connection between Proposed T.W & Distribution of GARMANDAR |
000075ORD/000760/2023-202 |
ORD/000760/2023-2024 |
449/HUG |
15/02/2024 |
12.94 |
GROUND WATER BASED GARMANDARAN (Z-2) PIPED WATER SUPPLY SCHEME IN GOGHAT-II BLOCK UNDER HOOGHLY, HOOGHLY DISTRICT (SM/15887) |
12.94 |
3325/Hug |
24/09/2024 |
FAD/002055/2024 |
26/09/2024 |
FAD/002055/2024 |
12.94 |
16 |
Hooghly Division |
000075BILL/00772/2024-202 |
BILL/00772/2024-2025 |
25/09/2024 |
HOOGHLY ZILLA PARISHAD |
Bhabapur Mini PWSS |
000075 |
|
1105/BDO/A |
13/03/2024 |
97.11 |
Bhabapur mini pipe water supply scheme (SM/13673) |
29.7 |
3347/Hug |
25/09/2024 |
FAD/002086/2024 |
26/09/2024 |
FAD/002086/2024 |
29.7 |
17 |
Hooghly Division |
000075BILL/00778/2024-202 |
BILL/00778/2024-2025 |
25/09/2024 |
ENVIROTECH SOLUTIONS |
Preparation of DPR for different works for providing Functional Household Tap Connection (FHTC) of Sinhal Pathan Piped Water Supply Scheme under Singur Block, Hooghly District under Chandannagar Sub-Division, PHE Dte. (PART-A). |
000075ORD/000010/2024-202 |
ORD/000010/2024-2025 |
428/Chan |
09/04/2024 |
0.92 |
SINHAL PATAN PIPED WATER SUPPLY SCHEME (SM/18103) |
0.92 |
3347/Hug |
25/09/2024 |
FAD/002086/2024 |
26/09/2024 |
FAD/002086/2024 |
0.92 |
18 |
Hooghly Division |
000075BILL/00779/2024-202 |
BILL/00779/2024-2025 |
25/09/2024 |
ENVIROTECH SOLUTIONS |
Preparation of DPR for different works for providing Functional Household Tap Connection (FHTC) of Sinhal Pathan Piped Water Supply Scheme under Singur Block, Hooghly District under Chandannagar Sub-Division, PHE Dte. (PART-C). |
000075ORD/000012/2024-202 |
ORD/000012/2024-2025 |
430/chan |
09/04/2024 |
0.78 |
SINHAL PATAN PIPED WATER SUPPLY SCHEME (SM/18103) |
0.78 |
3347/Hug |
25/09/2024 |
FAD/002086/2024 |
26/09/2024 |
FAD/002086/2024 |
0.78 |
19 |
Hooghly Division |
000075BILL/00780/2024-202 |
BILL/00780/2024-2025 |
25/09/2024 |
ENVIROTECH SOLUTIONS |
Preparation of DPR for different works for providing Functional Household Tap Connection (FHTC) of Sinhal Pathan Piped Water Supply Scheme under Singur Block, Hooghly District under Chandannagar Sub-Division, PHE Dte. (PART-B). |
000075ORD/000011/2024-202 |
ORD/000011/2024-2025 |
429/chan |
09/04/2024 |
0.84 |
SINHAL PATAN PIPED WATER SUPPLY SCHEME (SM/18103) |
0.84 |
3347/Hug |
25/09/2024 |
FAD/002086/2024 |
26/09/2024 |
FAD/002086/2024 |
0.84 |
20 |
Hooghly Division |
000075BILL/00804/2024-202 |
BILL/00804/2024-2025 |
25/09/2024 |
MAA JAGADHATRI CONSTRUCTION |
Additional Laying of HDPE pipeline and interconnection work in distibution system of Digsui Heora Zone-I and Zone-II Water Supply Scheme for providing left over FHTC under Chinsurah Sub- Division, Under Hooghly Division, PHE Dte. |
000075ORD/000790/2023-202 |
ORD/000790/2023-2024 |
535/HUG |
20/02/2024 |
16.19 |
SOURCE AUGMENTATION OF DIGSUI HEORA PIPED W/S SCHEME UNDER CHINSURAH MAGRA BLOCK (SM/13410) |
16.19 |
3347/Hug |
25/09/2024 |
FAD/002086/2024 |
26/09/2024 |
FAD/002086/2024 |
16.19 |
21 |
Hooghly Division |
000075BILL/00805/2024-202 |
BILL/00805/2024-2025 |
25/09/2024 |
MAA JAGADHATRI CONSTRUCTION |
Construction of Boundary Wall ,Laying of C.I/D.I pipes & specials for connection of Proposed T.W with distribution system , FHTC of DIGSUI HOERA W/S Scheme under Chinsurah Sub - Division P.H.E. Dte. |
000075ORD/000085/2023-202 |
ORD/000085/2023-2024 |
1339/HUG |
11/05/2023 |
10.05 |
SOURCE AUGMENTATION OF DIGSUI HEORA PIPED W/S SCHEME UNDER CHINSURAH MAGRA BLOCK (SM/13410) |
10.05 |
3347/Hug |
25/09/2024 |
FAD/002086/2024 |
26/09/2024 |
FAD/002086/2024 |
10.05 |
22 |
Hooghly Division |
000075BILL/00811/2024-202 |
BILL/00811/2024-2025 |
25/09/2024 |
SUNITI MAIRA |
CONSTRUCTION OF 2NOS. TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL AT BHAGABATIPUR Zone-I HW SITE AND 2ND TW SITE UNDER SERAMPORE SUB-DIVISION OF HOOGHLY DIVISION P.H.E DTE. |
000075ORD/000135/2024-202 |
ORD/000135/2024-2025 |
424/SER |
31/07/2024 |
0.66 |
BHAGABATIPUR PIPED WATER SUPPLY SCHEME BLOCK : CHANDITALA-I, DISTRICT : HOOGHLY. (SM/18373) |
0.66 |
3380/Hug |
27/09/2024 |
FAD/002152/2024 |
30/09/2024 |
FAD/002152/2024 |
0.66 |
23 |
Hooghly Division |
000075BILL/00813/2024-202 |
BILL/00813/2024-2025 |
25/09/2024 |
SUNITI MAIRA |
CONSTRUCTION OF 2Nos. TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL AT MADHABPUR HW SITE AND KUMIRMORA Z-I 2ND TW SITE UNDER SERAMPORE SUB-DIVISION OF HOOGHLY DIVISION P.H.E DTE. |
000075ORD/000147/2024-202 |
ORD/000147/2024-2025 |
430/SER |
31/07/2024 |
0.66 |
MADHABPUR PIPED WATER SUPPLY SCHEME BLOCK: CHANDITALA-II, DISTRICT: HOOGHLY. (SM/13347) |
0.66 |
3347/Hug |
25/09/2024 |
FAD/002086/2024 |
26/09/2024 |
FAD/002086/2024 |
0.66 |
24 |
Hooghly Division |
000075BILL/00814/2024-202 |
BILL/00814/2024-2025 |
25/09/2024 |
M/S BIMAL DAS AND CO. |
Restoration & repairing of village road damaged due to laying of pipeline of piped water supply schemes under JJM in RAJHAT GP of POLBA-DADPUR Block. |
000075ORD/000913/2023-202 |
ORD/000913/2023-2024 |
246/CH |
12/03/2024 |
4.79 |
SOURCE AUGMENTATION OF RAJHAT (Z-I & II) PIPED W/S SCHEME UNDER POLBA DADPUR BLOCK (SM/13677) |
4.79 |
3347/Hug |
25/09/2024 |
FAD/002086/2024 |
26/09/2024 |
FAD/002086/2024 |
4.79 |
25 |
Hooghly Division |
000075BILL/00818/2024-202 |
BILL/00818/2024-2025 |
26/09/2024 |
GHOSH CONSTRUCTION |
Providing Functional Household Tap Connection (FHTC) under JJM within left out Mouzas / Habitations of different PWSS under PANDUA Block of CHINSURAH Sub-Division of Hooghly Division P.H.E Dte. |
000075ORD/000346/2023-202 |
ORD/000346/2023-2024 |
2429/HUG |
11/08/2023 |
4.35 |
SOURCE AUGMENTATION OF SRIPUR (PANDUA) PIPED W/S SCHEME UNDER PANDUA BLOCK (SM/13411) |
4.35 |
3361/Hug |
26/09/2024 |
FAD/002119/2024 |
27/09/2024 |
FAD/002119/2024 |
4.35 |
26 |
Hooghly Division |
000075BILL/00846/2024-202 |
BILL/00846/2024-2025 |
26/09/2024 |
TAPAS ADHYA |
Sinking of tube-well, Rising Main, construction of switch-room & boundary wall at Rajhat Uttar Proposed TW site, under Chinsurah Sub-Division of Hooghly Division P.H.E Dte. Block Polba-Dadpur, District:- Hooghly |
000075ORD/000748/2023-202 |
ORD/000748/2023-2024 |
381/HUG |
08/02/2024 |
6.36 |
RAJHAT PIPED W/S SCHEME (FOR UNCOVERED AREA) UNDER POLBA DADPUR BLOCK (SM/18095) |
6.36 |
3361/Hug |
26/09/2024 |
FAD/002119/2024 |
27/09/2024 |
FAD/002119/2024 |
6.36 |
27 |
Hooghly Division |
000075BILL/00847/2024-202 |
BILL/00847/2024-2025 |
26/09/2024 |
M/S RAJKUMAR KHAN |
SAHAPUR Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 200 cum capacity RCC OHR with 20.0 mtr. Staging height including soil investigation & construction of switch-rooms & boundary walls at different TW site u |
000075ORD/000741/2022-202 |
ORD/000741/2022-2023 |
617/HUG |
03/03/2023 |
35.46 |
Sahapur Piped Water Supply Scheme, Block- Pursura, District-Hooghly (SM/13501) |
21 |
3361/Hug |
26/09/2024 |
FAD/002119/2024 |
27/09/2024 |
FAD/002119/2024 |
21 |
28 |
Hooghly Division |
000075BILL/00848/2024-202 |
BILL/00848/2024-2025 |
26/09/2024 |
TAPAS ADHYA |
RAJHAT Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC & construction of switch-room & boundary wall at Proposed TW site, under Chinsurah Sub-Division of Hooghly Division P.H.E Dte. Block Polba-Dadpur, District:- Hooghly [NEW S |
000075ORD/000240/2023-202 |
ORD/000240/2023-2024 |
2078/HUG |
18/07/2023 |
33.92 |
RAJHAT PIPED W/S SCHEME (FOR UNCOVERED AREA) UNDER POLBA DADPUR BLOCK (SM/18095) |
33.92 |
3361/Hug |
26/09/2024 |
FAD/002119/2024 |
27/09/2024 |
FAD/002119/2024 |
33.92 |
29 |
Hooghly Division |
000075BILL/00849/2024-202 |
BILL/00849/2024-2025 |
26/09/2024 |
GHOSH BROTHERS |
AUGMENTATION of GHOSHPUR Piped Water Supply Scheme with Extension of LDS, Rising Main, FHTC & construction of switch-room & boundary wall at Proposed TW site under Arambagh Sub-Division Of Hooghly Division P.H.E Dte. Block-KHANAKUL-I, District:- Hooghly. |
000075ORD/000324/2023-202 |
ORD/000324/2023-2024 |
2414/HUG |
11/08/2023 |
25.43 |
Augmentation of Ghoshpur Piped Water Supply Scheme under Khanakul-I Block (SM/15787) |
25.43 |
3361/Hug |
26/09/2024 |
FAD/002119/2024 |
27/09/2024 |
FAD/002119/2024 |
25.43 |
30 |
Hooghly Division |
000075BILL/00855/2024-202 |
BILL/00855/2024-2025 |
26/09/2024 |
RAJMAHAL ENTERPRISE |
Restoration & repairing of village road damaged due to laying of pipeline of piped water supply schemes under JJM in BATIKA-BAINCHI GP of PANDUA Block. |
000075ORD/000922/2023-202 |
ORD/000922/2023-2024 |
242/CH |
12/03/2024 |
4.81 |
SOURCE AUGMENTATION OF BAICHI PIPED W/S SCHEME UNDER PANDUA BLOCK (SM/13344) |
4.81 |
3361/Hug |
26/09/2024 |
FAD/002119/2024 |
27/09/2024 |
FAD/002119/2024 |
4.81 |
31 |
Hooghly Division |
000075BILL/00861/2024-202 |
BILL/00861/2024-2025 |
26/09/2024 |
M/S S.G. CONSTRUCTION |
BHANDARHATI ZONE-I Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of switch-room & boundary wall at Proposed TW site under DHANIAKHALI Block under Chinsruah Sub-Division of Hooghly Division, PHE Dte. District:- H |
000075ORD/000003/2023-202 |
ORD/000003/2023-2024 |
1011/HUG |
06/04/2023 |
34.18 |
AUGMENTATION OF GROUND BASED PIPED WATER SUPPLY SCHEME FOR BHANDARHATI (SM/14040) |
34.18 |
3361/Hug |
26/09/2024 |
FAD/002119/2024 |
27/09/2024 |
FAD/002119/2024 |
34.18 |
32 |
Hooghly Division |
000075BILL/00862/2024-202 |
BILL/00862/2024-2025 |
26/09/2024 |
BANSBERIA CONSTRUCTION CO. |
AUGMENTATION of PURBA RAMNAGAR Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Repairing of Existing Switch Rooms, Boundary Wall of existing T.W Sites, Construction of 600 cum capacity RCC OHR with 20.0 mtr. with Staging heigh |
000075ORD/000229/2023-202 |
ORD/000229/2023-2024 |
2062/HUG |
17/07/2023 |
97.11 |
AUGMENTATION OF PURBA RAMNAGAR PIPED WATER SUPPLY SCHEME (SM/13348) |
97.11 |
3362/Hug |
26/09/2024 |
FAD/002119/2024 |
27/09/2024 |
FAD/002119/2024 |
97.11 |
33 |
Hooghly Division |
000075BILL/00864/2024-202 |
BILL/00864/2024-2025 |
26/09/2024 |
SRI KRISHNA ENTERPRISE |
CONSTRUCTION OF 1NO. TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL AT JAGANNATHBATI HW SITE UNDER SERAMPORE SUB-DIVISION OF HOOGHLY DIVISION P.H.E, DTE. |
000075ORD/000149/2024-202 |
ORD/000149/2024-2025 |
432/SER |
31/07/2024 |
0.36 |
JAGANNATHBATI PIPED WATER SUPPLY SCHEME BLOCK: CHANDITALA-II, DISTRICT: HOOGHLY (SM/17176) |
0.36 |
3362/Hug |
26/09/2024 |
FAD/002119/2024 |
27/09/2024 |
FAD/002119/2024 |
0.36 |
34 |
Hooghly Division |
000075BILL/00872/2024-202 |
BILL/00872/2024-2025 |
27/09/2024 |
SUNITI MAIRA |
CONSTRUCTION OF 2NOS. TEMPORARY KIOSK FOR THE NECESSARY ARRANGEMENT OF ELECTRIFICATION OF TUBEWELL AT GANGADHARPUR Z-I HW SITE AND Zone-II HW SITE UNDER SERAMPORE SUB-DIVISION OF HOOGHLY DIVISION P.H.E DTE. |
000075ORD/000136/2024-202 |
ORD/000136/2024-2025 |
425/SER |
31/07/2024 |
0.68 |
GANGADHARPUR PIPED WATER SUPPLY SCHEME BLOCK : CHANDITALA-I DISTRICT : HOOGHLY. (SM/18623) |
0.68 |
3380/Hug |
27/09/2024 |
FAD/002152/2024 |
30/09/2024 |
FAD/002152/2024 |
0.68 |
35 |
Hooghly Division |
000075BILL/00874/2024-202 |
BILL/00874/2024-2025 |
27/09/2024 |
BAPPADITYA BANERJEE |
GOBINDANAGAR (ZONE-II) Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at |
000075ORD/000052/2023-202 |
ORD/000052/2023-2024 |
1520/HUG |
23/05/2023 |
39.06 |
Gobindanagar (Zone-II) Piped Water Supply Scheme, Block- Goghat-I, District- Hooghly (SM/14982) |
39.06 |
3380/Hug |
27/09/2024 |
FAD/002152/2024 |
30/09/2024 |
FAD/002152/2024 |
39.06 |
36 |
Hooghly Division |
000075BILL/00876/2024-202 |
BILL/00876/2024-2025 |
27/09/2024 |
CITYCON UNEMPLOYED ENGINEERS C |
Construction of 2 Nos. 3.6 m X 3.0 m Switch Room with Additional Plinth Height, with Sanitary and Water Supply arrangement, Laying of C.I/D.I pipes & specials for connection of Proposed 2 nos. T.W with distribution system, For Development of BORHAL (ZONE- |
000075ORD/000111/2023-202 |
ORD/000111/2023-2024 |
1440/HUG |
18/05/2023 |
8.93 |
Development of Borhal (Zone-I) Piped Water Supply Scheme by Installing Two (2) Nos. Tube Well including Connection with Distribution, Switch Room & other allied work to meet up the additional water demand induced after execution of FHTC under Serampore Se (SM/16449) |
8.93 |
3380/Hug |
27/09/2024 |
FAD/002152/2024 |
30/09/2024 |
FAD/002152/2024 |
8.93 |
37 |
Hooghly Division |
000075BILL/00877/2024-202 |
BILL/00877/2024-2025 |
27/09/2024 |
M/S SHIVAM UDYOG |
JAGANNATHBATI Piped Water Supply Scheme with Sinking of tubewell, LDS, Rising Main, FHTC, Construction of 100 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at different |
000075ORD/000012/2023-202 |
ORD/000012/2023-2024 |
1042/Hug |
10/04/2023 |
53.44 |
JAGANNATHBATI PIPED WATER SUPPLY SCHEME BLOCK: CHANDITALA-II, DISTRICT: HOOGHLY (SM/17176) |
53.44 |
3380/Hug |
27/09/2024 |
FAD/002152/2024 |
30/09/2024 |
FAD/002152/2024 |
53.44 |
38 |
Hooghly Division |
000075BILL/00878/2024-202 |
BILL/00878/2024-2025 |
27/09/2024 |
BAPPADITYA BANERJEE |
Sinking of 02Nos. Tube well with, Laying Distribution System, Laying rising main pipe for inter connection between T.W & Distribution pipeline, Construction of Switch Rooms & Boundary Wall in Proposed T.W Sites, Repairing of Switch Rooms & Boundary Wall a |
000075ORD/000543/2023-202 |
ORD/000543/2023-2024 |
3109/HUG |
13/10/2023 |
41.62 |
SOURCE AUGMENTATION OF BAICHI PIPED W/S SCHEME UNDER PANDUA BLOCK (SM/13344) |
41.62 |
3380/Hug |
27/09/2024 |
FAD/002152/2024 |
30/09/2024 |
FAD/002152/2024 |
41.62 |
39 |
Hooghly Division |
000075BILL/00881/2024-202 |
BILL/00881/2024-2025 |
27/09/2024 |
SAMIRON GHOSH |
BALARAMBATI Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 450 cum capacity RCC OHR with 20.0 mtr Staging height including soil investigation & construction of switch-rooms & boundary walls at different TW s |
000075ORD/000284/2023-202 |
ORD/000284/2023-2024 |
2334/HUG |
07/08/2023 |
146.77 |
GROUND WATER BASED BALARAMBATI PIPED W/S SCHEME (SM/18657) |
146.77 |
3380/Hug |
27/09/2024 |
FAD/002152/2024 |
30/09/2024 |
FAD/002152/2024 |
146.77 |
40 |
Hooghly Division |
000075BILL/00885/2024-202 |
BILL/00885/2024-2025 |
27/09/2024 |
KARALI MOHAN KHAMRUI |
Construction of 2 Nos. 3.6 m X 3.0 m Switch Room with Additional Plinth Height, with Sanitary and Water Supply arrangement, Laying of C.I/D.I pipes & specials for connection of Proposed 2 nos. T.W with distribution system, For Source Augmentation of SABAL |
000075ORD/000114/2023-202 |
ORD/000114/2023-2024 |
1443/HUG |
18/05/2023 |
13.28 |
Source Augmentation of SABALSINGHAPUR Piped Water Supply Scheme under Khanakul-II Block (SM/16121) |
13.28 |
3380/Hug |
27/09/2024 |
FAD/002152/2024 |
30/09/2024 |
FAD/002152/2024 |
13.28 |
41 |
Hooghly Division |
000075BILL/00886/2024-202 |
BILL/00886/2024-2025 |
27/09/2024 |
BANSBERIA CONSTRUCTION CO. |
NILARPUR Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 150 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at different TW |
000075ORD/000230/2023-202 |
ORD/000230/2023-2024 |
2063/HUG |
17/07/2023 |
56.7 |
Nilarpur Piped Water Supply Scheme, Block-Jangipara, District-Hooghly (SM/18105) |
56.7 |
3380/Hug |
27/09/2024 |
FAD/002152/2024 |
30/09/2024 |
FAD/002152/2024 |
56.7 |
42 |
Hooghly Division |
000075BILL/00902/2024-202 |
BILL/00902/2024-2025 |
27/09/2024 |
HOOGHLY ZILLA PARISHAD |
Implementation of single village Basantapur mini pipe water supply scheme |
000075 |
|
1105/BDO/A |
13/03/2024 |
33.31 |
Basantapur Mini Piped Water Supply Scheme (SM/13560) |
31.77 |
3380/Hug |
27/09/2024 |
FAD/002152/2024 |
30/09/2024 |
FAD/002152/2024 |
31.77 |
43 |
Hooghly Division |
000075BILL/00918/2024-202 |
BILL/00918/2024-2025 |
28/09/2024 |
SUNITI MAIRA |
Laying of pipe line and other necessary maintanance work for improvement of water supply in distribution system at Patna Bhairabpur W/S Scheme under Chinsurah Sub - Division P.H.E. Dte. |
000075ORD/000733/2023-202 |
ORD/000733/2023-2024 |
25/CH |
05/01/2024 |
4.54 |
SOURCE AUGMENTATION OF PATNA BHAIRAVPUR W/S SCHEME UNDER POLBA DADPUR BLOCK (SM/15900) |
4.54 |
3385/Hug |
28/09/2024 |
FAD/002188/2024 |
01/10/2024 |
FAD/002188/2024 |
4.54 |
44 |
Hooghly Division |
000075BILL/00919/2024-202 |
BILL/00919/2024-2025 |
28/09/2024 |
SRI KRISHNA ENTERPRISE |
Construction of 3.6 m X 3.0 m Switch Room with Sanitary and Water Supply arrangement, Boundary Wall in Proposed T.W Site, Laying rising main pipe for inter connection between T.W & Distribution For Source Augmentation of Santoshpur Piped Water Supply Sche |
000075ORD/000078/2023-202 |
ORD/000078/2023-2024 |
1312/HUG |
10/05/2023 |
3.57 |
Source Augmentation of Santoshpur Piped Water Supply scheme, Block- Tarakeswar, District-Hooghly (SM/15793) |
3.57 |
3385/Hug |
28/09/2024 |
FAD/002188/2024 |
01/10/2024 |
FAD/002188/2024 |
3.57 |
45 |
Hooghly Division |
000075BILL/00923/2024-202 |
BILL/00923/2024-2025 |
28/09/2024 |
DOULPHINE ENTERPRISE (RANJIT K |
GHOL DIGRUI (ZONE-I) Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 300 cum capacity RCC OHR with 20.0 mtr. with Staging height including soil investigation & construction of switch-rooms & boundary walls at d |
000075ORD/000070/2023-202 |
ORD/000070/2023-2024 |
1273/HUG |
04/05/2023 |
122.66 |
Ghol Digrui (Zone-I) Piped Water Supply Scheme, Block- Pursura, District-Hooghly (SM/13334) |
122.66 |
3385/Hug |
28/09/2024 |
FAD/002188/2024 |
01/10/2024 |
FAD/002188/2024 |
122.66 |
46 |
Hooghly Division |
000075BILL/00932/2024-202 |
BILL/00932/2024-2025 |
28/09/2024 |
ANALYTICA FOODTECH SERVICES PV |
BAINCHIPOTA (ZONE-I) Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC, Construction of 250 cum capacity RCC OHR with 20.0 mtr. Staging height including soil investigation & construction of switch-rooms & boundary walls at differ |
000075ORD/000011/2023-202 |
ORD/000011/2023-2024 |
1041/Hug |
10/04/2023 |
57.37 |
GROUND WATER BASED BAINCHIPOTA(ZONE-I) PWSS (SM/17289) |
57.37 |
3385/Hug |
28/09/2024 |
FAD/002188/2024 |
01/10/2024 |
FAD/002188/2024 |
57.37 |
47 |
Hooghly Division |
000075BILL/00940/2024-202 |
BILL/00940/2024-2025 |
30/09/2024 |
MA KANKALI ENTERPRISE |
BALIDAHA Piped Water Supply Scheme with Sinking of tube-well, LDS, Rising Main, FHTC & construction of switch-room & boundary wall at Proposed TW site, under CHINSURAH Sub-Division of Hooghly Division P.H.E Dte. Block DHANIAKHALI, District:- Hooghly [NEW |
000075ORD/000096/2023-202 |
ORD/000096/2023-2024 |
1363/HUG |
12/05/2023 |
7.62 |
BALIDAHA PWSS PIPED WATER SUPPLY SCHEME UNDER DHANIAKHALI BLOCK. (SM/18101) |
7.62 |
3401/Hug |
30/09/2024 |
FAD/002216/2024 |
03/10/2024 |
FAD/002216/2024 |
7.62 |
48 |
Hooghly Division |
000075BILL/00941/2024-202 |
BILL/00941/2024-2025 |
30/09/2024 |
AYUSH ENTERPRISE |
Construction of 2 Nos. 3.6 m X 3.0 m Switch Room with Additional Plinth
Height, with Sanitary and Water Supply arrangement,Laying of C.I/D.I pipes
& specials for connection of Proposed 2 nos.T.W with distribution system,
FHTC of SHIBRAI W/S Scheme unde |
000075ORD/000158/2023-202 |
ORD/000158/2023-2024 |
1601/HUG |
01/06/2023 |
9.09 |
SOURCE AUGMENTATION OF GROUND WATER BASED PIPED WATER SUPPLY SCHEME FOR SHIBRAI W/S SCHEME UNDER PANDUA BLOCK (SM/15801) |
9.09 |
3401/Hug |
30/09/2024 |
FAD/002216/2024 |
03/10/2024 |
FAD/002216/2024 |
9.09 |
49 |
Hooghly Division |
000075BILL/00943/2024-202 |
BILL/00943/2024-2025 |
01/10/2024 |
MUNSHI TAJUDDIN |
Construction of 3.6 m X 3.0 m Switch Room with Sanitary and Water Supply arrangement, Boundary Wall in Proposed T.W Site, Laying rising main pipe for inter connection between T.W & Distribution For Source Augmentation of SHYAMBALLAVPUR Piped Water Supply |
000075ORD/000077/2023-202 |
ORD/000077/2023-2024 |
1311/HUG |
10/05/2023 |
6.43 |
Source Augmentation of SHYAMBALLAVPUR Piped Water Supply Scheme Under Goghat-I Block (SM/15810) |
6.43 |
3420/Hug |
01/10/2024 |
FAD/002216/2024 |
03/10/2024 |
FAD/002216/2024 |
6.43 |
50 |
Hooghly Division |
000075BILL/00945/2024-202 |
BILL/00945/2024-2025 |
01/10/2024 |
GHOSH BROTHERS |
Providing Functional Household Tap Connection (FHTC) in GHOSHPUR PWSS, Block KHANAKUL-I under Arambag Sub-Division of Hooghly Division P.H.E Dte. |
000075ORD/000245/2023-202 |
ORD/000245/2023-2024 |
2100/HUG |
19/07/2023 |
79.36 |
RETROFITTING WORKS OF GHOSHPUR PWSS FOR PROVIDING 4709 NOS. FUNCTIONAL HOUSE HOLD TAP CONNECTION (FHTC) WITHIN THE COMMAND AREA OF THE SCHEME UNDER HOOGHLY DIVISION, PHE DTE (SM/13354) |
79.36 |
3420/Hug |
01/10/2024 |
FAD/002216/2024 |
03/10/2024 |
FAD/002216/2024 |
79.36 |
51 |
Hooghly Division |
000075BILL/00949/2024-202 |
BILL/00949/2024-2025 |
02/10/2024 |
APEX ENGINEERING |
Revised Geo-reference drawing (CAD-GIS) and redesign of Network Distribution System of Gangadharpur (Zone-II)
Piped Water Supply Scheme under Serampore Sub-Division of Hooghly Division P.H.E. Dte. |
000075ORD/001444/2023-202 |
ORD/001444/2023-2024 |
117/SER |
23/02/2024 |
0.84 |
GANGADHARPUR PIPED WATER SUPPLY SCHEME BLOCK : CHANDITALA-I DISTRICT : HOOGHLY. (SM/18623) |
0.84 |
3429/Hug |
03/10/2024 |
FAD/002259/2024 |
04/10/2024 |
FAD/002259/2024 |
0.84 |
52 |
Hooghly Division |
000075BILL/00950/2024-202 |
BILL/00950/2024-2025 |
02/10/2024 |
APEX ENGINEERING |
Revised Geo-reference drawing (CAD-GIS) and redesign of Network Distribution System of Gangadharpur (Zone-I)
Piped Water Supply Scheme under Serampore Sub-Division of Hooghly Division P.H.E. Dte |
000075ORD/001443/2023-202 |
ORD/001443/2023-2024 |
116/SER |
23/02/2024 |
0.84 |
GANGADHARPUR PIPED WATER SUPPLY SCHEME BLOCK : CHANDITALA-I DISTRICT : HOOGHLY. (SM/18623) |
0.84 |
3429/Hug |
03/10/2024 |
FAD/002259/2024 |
04/10/2024 |
FAD/002259/2024 |
0.84 |
53 |
Hooghly Division |
000075BILL/00951/2024-202 |
BILL/00951/2024-2025 |
02/10/2024 |
S.K ENTERPRISE |
Sinking of 3rd tube-well by D.R. Rig method, Construction of 5.4 m X 3.6 m Switch Room with Sanitary and Water Supply arrangement, Construction of Boundary Wall, Laying rising main pipe for inter connection between Proposed T.W & Distribution of BALARAMBA |
000075ORD/000529/2023-202 |
ORD/000529/2023-2024 |
3008/HUG |
05/10/2023 |
30.39 |
GROUND WATER BASED BALARAMBATI PIPED W/S SCHEME (SM/18657) |
30.39 |
3429/Hug |
03/10/2024 |
FAD/002259/2024 |
04/10/2024 |
FAD/002259/2024 |
30.39 |
54 |
Hooghly Division |
000075BILL/00952/2024-202 |
BILL/00952/2024-2025 |
02/10/2024 |
S.S. CONSULTANCY AND CONSTRUCT |
Construction of 2 Nos. 3.6 m X 3.0 m Switch Room with Additional Plinth Height, with Sanitary and Water Supply arrangement, Laying of C.I/D.I pipes & specials for connection of Proposed 2 nos. T.W with distribution system, For Source Augmentation of JAGAT |
000075ORD/000115/2023-202 |
ORD/000115/2023-2024 |
1444/HUG |
18/05/2023 |
12.34 |
Source Augmentation of JAGATPUR Piped Water Supply Scheme under Khanakul-II Block (SM/16122) |
12.34 |
3429/Hug |
03/10/2024 |
FAD/002259/2024 |
04/10/2024 |
FAD/002259/2024 |
12.34 |
55 |
Hooghly Division |
000075BILL/00953/2024-202 |
BILL/00953/2024-2025 |
03/10/2024 |
LIMRA SOCIAL WELFARE SOCIETY |
Organize one day Sub Division level orientation programme on JJM at involving PRI Functionaries and VWSC members at Hooghly district and Conceptualization, design , implementing mass awareness generation through Wall Painting and miking by dissemination o |
000075ORD/000531/2023-202 |
ORD/000531/2023-2024 |
3053/HUG |
11/10/2023 |
6.96 |
IEC/Awareness generation Activities through Wall painting and Miking in the village having house connection through PWS in collaboration with panchayat and Rural Development Department, Govt. of West Bengal under Jal Jeevan Mission Support Activities (SM/13541) |
6.96 |
3449/Hug |
03/10/2024 |
FAD/002259/2024 |
04/10/2024 |
FAD/002259/2024 |
6.96 |
56 |
Hooghly Division |
000075BILL/01067/2024-202 |
BILL/01067/2024-2025 |
09/12/2024 |
DILIP KUMAR CHANDRA |
CONTRACTUAL AE PAYMENT FOR THE MONTH OF OCTOBER-24 & NOVEMBER-24 |
000075 |
|
GO22230067 |
29/08/2022 |
0.56 |
Engagement of Contractual Assistant Engineers engaged in various divisions related to Support Activity under Jal Jeevan Mission (SM/11975) |
0.56 |
3945/Hug |
09/12/2024 |
FAD/002704/2024 |
11/12/2024 |
FAD/002704/2024 |
0.56 |