1 |
Nadia Arsenic Division I |
000068BILL/00272/2024-202 |
BILL/00272/2024-2025 |
11/11/2024 |
EXECUTIVE ENGINEER, NADIA HIGH |
NH-34 to Tarapur to Balagarhghat Road from 5.93 KM to 7.43 KM (RHS) with crossing Restoration work arising out of damage of black top and hard shoulder for laying of DI pipe line by Nadia Arsenic Division-I, PHE Dte. under NADIA HIGHWAY DIVISION NO.-II, i |
000068 |
|
536/R-186 |
05/08/2024 |
27.44 |
Gosaichar Char Piped Water Supply Scheme To Accommodate FHTC at Ranaghat-II Block under Nadia District Under Nadia Arsenic Division-I, P.H.E. Dte. (SM/13758) |
27.44 |
1885/NAD-I |
12/11/2024 |
FAD/002497/2024 |
14/11/2024 |
FAD/002497/2024 |
27.44 |
2 |
Nadia Arsenic Division I |
000068BILL/00273/2024-202 |
BILL/00273/2024-2025 |
20/09/2024 |
EXECUTIVE ENGINEER, BARASAT HI |
Restoration charges for road damage restoration work at 16 No. Gopalnagar Railgate to Majhergram Road form Ch. 0.00 KM to 7.10 KM Road damage restoration work of laying of 1000 mm DI pipe line for surface water based PWSS arsenic affected areas of Bagdah |
000068 |
|
1238/U-3/P |
22/08/2024 |
126.4 |
Surface Water Based PWSS for Arsenic Affected Areas of Bagda and Bongaon Blocks (Including Ranaghat-I, Ranaghat-II Blocks and Bongaon Municipality) (SM/06364) |
126.4 |
1885/NAD-I |
12/11/2024 |
FAD/002497/2024 |
14/11/2024 |
FAD/002497/2024 |
126.4 |
3 |
Nadia Arsenic Division I |
000068BILL/00326/2024-202 |
BILL/00326/2024-2025 |
03/12/2024 |
G.B. CONSTRUCTION & UMWELT JV |
Augmentation of Water Treatment Plant, Intake & Rising Main for Surface Water Based Piped Water Supply Scheme including augmentation, laying & construction of various components like Laying Distribution System, OHR including Soil Test, Repairing of pump |
000068ORD/000279/2023-202 |
ORD/000279/2023-2024 |
2730/NAD-I |
07/12/2023 |
412.79 |
AUGMENTATION OF SURFACE WATER BASED PIPED WATER SUPPLY SCHEME FOR HARINGHATA & CHAKDAH (PART) AT CHAKDAHA & HARINGHATA BLOCK UNDER NADIA DISTRICT UBDER NADIA ARSENIC DIVISION-I, P.H.E. DTE. (SM/19042) |
412.79 |
2024/NAD-I |
03/12/2024 |
FAD/002655/2024 |
05/12/2024 |
FAD/002655/2024 |
412.79 |
4 |
Nadia Arsenic Division I |
000068BILL/00330/2024-202 |
BILL/00330/2024-2025 |
03/12/2024 |
BHARATI CHEMICALS & SCIENTIFIC |
MATERIAL PROCUREMENT FOR PRA COMPLY NABL ACCREDITATION WITH SOP FOR KALYANI STATE REFFERAL LABORATORY,KALYANI ,NADIA |
000068 |
|
GEM-481270 |
23/09/2024 |
4.79 |
Up-gradation of PHED & NGO Managed Laboratories related to Water Quality Monitoring & Surveillance activity under Jal Jeevan Mission (SM/11926) |
4.79 |
2024/NAD-I |
03/12/2024 |
FAD/002655/2024 |
05/12/2024 |
FAD/002655/2024 |
4.79 |
5 |
Nadia Arsenic Division I |
000068BILL/00332/2024-202 |
BILL/00332/2024-2025 |
11/12/2024 |
EXECUTIVE ENGINEER, NADIA HIGH |
Ranaghat -Aranghata (Old) Road from Ch. 0.75 Km. to ch. 12.11 Km. (R.H.S.) "Restoration work arising out of damage of Carriage way & hard shoulder for laying of DI pipeline for integrated surface water based PWSS for Ranaghat -I & Ranaghat-II block under |
000068 |
|
963/R-186 |
29/11/2024 |
57.95 |
Detailed Project report of Hijuli Piped Water Supply Scheme at Ranaghat-II Block Under Nadia District Under Nadia Arseni Division-I, P.H.E. Dte. (SM/14243) |
57.95 |
2074/NAD-I |
11/12/2024 |
FAD/002728/2024 |
16/12/2024 |
FAD/002728/2024 |
57.95 |
6 |
Nadia Arsenic Division I |
000068BILL/00383/2024-202 |
BILL/00383/2024-2025 |
17/12/2024 |
SANDIP MONDAL |
BILL FOR CONTRACTUAL ASSISTANT ENGINEER FOR THE MONTH OF SEPETMBER,2024(12 DAYS),OCTOBER,2024(30 DAYS) AND NOVEMBER,2024(30 DAYS) |
000068 |
|
PHE/2285/O |
30/08/2024 |
0.67 |
Engagement of Contractual Assistant Engineers engaged in various divisions related to Support Activity under Jal Jeevan Mission (SM/11975) |
0.67 |
2100/NAD-I |
17/12/2024 |
FAD/002757/2024 |
19/12/2024 |
FAD/002757/2024 |
0.67 |