146 | 3,963.38 | ||||||
1 | South 24 Pgs. W/S Division - I | ORD/000058/2020-2021 | 30/12/2020 | 1496/SWD-I | LAKSHMI NARAYAN SAHOO | Repairing of service road maintained by KMDA due to restoration of UPVC pipe line (90 mm & 110 mm) dia damaged due to super cyclone AMPHAN 2020 within Zone-25 of Baruipur block under "Surface Water Based Water Supply Scheme in the Arsenic affected areas | 1.22 |
2 | South 24 Pgs. W/S Division - I | ORD/000106/2020-2021 | 31/08/2020 | 841/SWD-I | SUNANDA ENVIROMENTAL INTERNATIONAL PVT LTD | Maintenance, management, monitoring, modification & upgradation in any form of Water Quality dashboard, smartphone application, mobile laboratory data integration, stock management, an SMS alert system for alerting the concerned authority regarding bacter | 395.66 |
3 | South 24 Pgs. W/S Division - I | ORD/000277/2020-2021 | 31/12/2020 | 1595/SWD-I | SUNANDA ENVIROMENTAL INTERNATIONAL PVT LTD | Engagement of one district consultant including performance incentive & travelling allowance for the district of Nadia under Public Health Engineering Department, Government of West Bengal | 4.44 |
4 | South 24 Pgs. W/S Division - I | ORD/000035/2021-2022 | 25/10/2021 | 1101/SWD -I | NIRMAL UDYOG | Retrofitting of pipeline for supporting FHTC drive for Buita W/S Scheme (For Booth No: 197 to 198) and adjoining areas under Budge Budge I Block with allied works under SWD - I, P.H.E. Dte District South 24 Parganas. | 390.26 |
5 | South 24 Pgs. W/S Division - I | ORD/000276/2020-2021 | 08/10/2020 | 1071/SWD-I | DIAMOND ENTERPRISE | Repairing of MS Steel Plate Flooring in old intake of 34MGD at Dongaria in connection with Surface Water based Water Supply Scheme for Arsenic affected areas of South 24 Parganas in connection to destruction by 'Aumfun' | 5.90 |
6 | South 24 Pgs. W/S Division - I | ORD/000066/2021-2022 | 08/10/2021 | 1054/SWD-I JJM | MS POUSALI ENTERPRISE | Laying of 65 mm dia pipeline from CWR to Botling plant at Dongaria under Surface Water Based Water Supply Scheme for South 24-Pgns. W/S Division-I. | 4.60 |
7 | South 24 Pgs. W/S Division - I | ORD/000307/2020-2021 | 28/09/2020 | 986 /SWD-I | SUPER SKILL | Reconstruction of Mid-day meal dining room, kitchen and class room cum godown structure in place of existing structure to be demolished for laying of 1422 mm dia MS pipeline at Netra High School under Mega Surface Water Based Water Supply Project for Falt | 23.97 |
8 | South 24 Pgs. W/S Division - I | ORD/000299/2020-2021 | 28/09/2020 | 987/SWD-I | UNI DEVELOPERS AND CONTRACTORS | Re-construction of Kitchen cum Store Room of Ghatakpur Primary School and ICDS building after laying of 1219mm dia MS pipeline at Ghatakpur under Mega Surface Water Based Water Supply Project for Falta Mathurapur. | 15.80 |
9 | South 24 Pgs. W/S Division - I | ORD/000082/2021-2022 | 27/12/2021 | 1572/SWD-I | SUNANDA ENVIROMENTAL INTERNATIONAL PVT LTD | Operation, Maintenance, Up-gradation of all Water Quality Applications for Data Collection, alert generation system for contaminated sources, stock & faulty instruments and onsite sanitary survey data, integrated with WQMIS Structure through cloud based s | 196.13 |
10 | South 24 Pgs. W/S Division - I | ORD/000084/2021-2022 | 27/12/2021 | 1573/SWD-I | BHARATI CHEMICAL & SCIENTIFIC WORKS | Operation, Maintenance and Up-gradation of State Water Quality Dashboard, Web Interface, integration of Stock Management, Laboratory Assessment, all Water Quality Data and Laboratory Data Management for Analytical Reports (Online and Offline) through over | 205.44 |
11 | South 24 Pgs. W/S Division - I | ORD/000359/2020-2021 | 15/02/2021 | 1947/SWD-I JJM | NIRMAL UDYOG | Laying of UPVC pipelines and allied works in between node points: 61-63, 64-71, 66-67-68-69, 09-118, 15-16, 23-27-28, 14-15, 45-46, 49-50, 49-51-52-53, 54-55, 57-57A, 57-58, 58-59-66, 62-63-64-66, 69-73, 71-72-73, 19-20-20A, 72-79 (as per departmental dra | 55.60 |
12 | South 24 Pgs. W/S Division - I | ORD/000113/2021-2022 | 24/11/2021 | 1333/ SWD-I | BHARATI CHEMICAL & SCIENTIFIC WORKS | Providing service by assigning Resource Person for a period of 3 months supervision of process of preparation for NABL recognition for Chemical Testing of potable water of Sub-District level Water Quality Testing Laboratory at Baruipur including supply, i | 2.81 |
13 | South 24 Pgs. W/S Division - I | ORD/000108/2021-2022 | 02/09/2021 | 788/SWD-I | SUNANDA ENVIROMENTAL INTERNATIONAL PVT LTD | Supply and delivery of portable multi-parameter water quality testing device (Field Test Kits) including training on operation of the devices (FTKs) for monitoring water safety status of rural drinking water sources of 104 nos. Gram Panchayets of 10 nos. | 16.56 |
14 | South 24 Pgs. W/S Division - I | ORD/000131/2021-2022 | 25/03/2022 | 2702 /SWD-I | ASTER CONSULTANCY | Preparation of design, drawing for foundation of different capacities RCC Over Head Reservoir at Zone I (Bainchberia Srichanda) Reservoir capacity - 750cum. & Zone VI (Ektara) Reservoir capacity - 1200cum. at Mograhat-I block under South 24-Pgns. W/S Divi | 0.97 |
15 | South 24 Pgs. W/S Division - I | ORD/000372/2020-2021 | 08/10/2020 | 1072/ SWD-I | M/S. S.S. ENTERPRISE | Repairing of worn out columns, Girders with allied components of old intake of 34MGD at Dongaria in connection with Surface Water based Water Supply Scheme for Arsenic affected areas of South 24 Parganas in connection to destruction by 'Aumfun' | 25.67 |
16 | South 24 Pgs. W/S Division - I | ORD/000293/2022-2023 | 07/11/2022 | 1787\SWD-I | SANJAY ENTERPRISE | Construction of chlorination room at HARENDRAPALLY of Baruipur Block for disinfection of ground water from big dia tube well due to improvement of water supply in the water Scarcity area/non command area under Surface Water Based Water Supply Scheme in th | 5.80 |
17 | South 24 Pgs. W/S Division - I | ORD/000281/2022-2023 | 22/08/2022 | 1103/SWD-I JJM | BHARATI CHEMICAL & SCIENTIFIC WORKS | Engagement of resources person for supervising the protocol / standard operating procedures/ technical documentation of laboratory water testing activities as per ISO/IEC 17025:2017 including performing statutory internal audit, refresher training course | 9.55 |
18 | South 24 Pgs. W/S Division - I | ORD/000314/2022-2023 | 27/09/2022 | 1469/SWD-I | ANNA PAUL | Hiring of additional 01 (one) no. diesel driven Non-Air conditioner Motor Cab having BS-III & above category (Luxury Ambassador / Indica / Swift Dezire Car) with driver for official use of the Assistant Engineers under South 24-Pgns. W/S Division-I, PHE D | 0.86 |
19 | South 24 Pgs. W/S Division - I | ORD/000295/2022-2023 | 16/11/2022 | 1882/SWD-I | BARI ENTERPRISE | Sinking of rig ground bored 02 nos. (Two nos) 250 mm x 150 mm dia & 300 mtr. deep tube-well by rotary method for Ramchandra Nagar (Zone-I) PWSS of Mograhat-II Block under South 24-Parganas W/S Division-I, PHE Dte. | 30.03 |
20 | South 24 Pgs. W/S Division - I | ORD/000296/2022-2023 | 16/11/2022 | 1876/SWD-I | DIPALI CONSTRUCTION | Sinking of rig ground bored 02 nos. (Two) 250 mm x 150 mm dia & 300 mtr. deep tube-well by rotary method for Heria PWSS of Mograhat-II Block under South 24-Parganas W/S Division-I, PHE Dte. | 30.03 |
21 | South 24 Pgs. W/S Division - I | ORD/000318/2022-2023 | 27/09/2022 | 1472/SWD-I | AJAY KUMAR | Hiring of diesel driven Non-Air conditioner Maxi Cab having BS-III & above category (Luxury Ambassador / Indica / Swift Dezire Car) with driver for official use of the Deputy Secretary / Assistant Secretary, Public Health Engineering Department, Govt. of | 0.87 |
22 | South 24 Pgs. W/S Division - I | ORD/000449/2022-2023 | 29/12/2022 | 2460/SWDI | SUNANDA ENVIROMENTAL INTERNATIONAL PVT LTD | Continuation Order for the work of Operation, Maintenance, Up-gradation of all Water Quality Applications for Data Collection, alert generation system for contaminated sources, stock & faulty instruments and onsite sanitary survey data, integrated with WQ | 16.34 |
23 | South 24 Pgs. W/S Division - I | ORD/000300/2021-2022 | 25/03/2022 | 2689/SWD-I | M/S. SYSCON | Engagement of 01 no. Computer Operator / Data Entry Operator [Category - C] for the office works of Superintending Engineer, PMU, WBDWSIP (ADB),PHE Dte. under Executive Engineer, South 24 pgs. W/S Division-I, PHE Directorate [w.e.f. 01.04.2022 to 31.03.20 | 1.97 |
24 | South 24 Pgs. W/S Division - I | ORD/000450/2022-2023 | 29/12/2022 | 2461/SWDI | BHARATI CHEMICAL & SCIENTIFIC WORKS | Continuation Order for the work of Operation, Maintenance and Up-gradation of State Water Quality Dashboard, Web Interface, integration of Stock Management, Laboratory Assessment, all Water Quality Data and Laboratory Data Management for Analytical Report | 17.12 |
25 | South 24 Pgs. W/S Division - I | ORD/000452/2022-2023 | 30/12/2022 | 2490/SWD-I | M/S. SYSCON | Continuation Order for the work of Engagement of 01 no. Computer Operator / Data Entry Operator [Category - A] for the office works of Executive Engineer (Deputed from PWD) under Superintending Engineer, W/S Circle, PHE Directorate. [w.e.f. 01.01.2023 t | 0.50 |
26 | South 24 Pgs. W/S Division - I | ORD/000473/2022-2023 | 24/01/2023 | 2726/SWD-I | SUNANDA ENVIROMENTAL INTERNATIONAL PVT LTD | Day to day upkeep, upgradation of all water quality applications for data collection, alert generation system for contaminated sources, stock & faulty instruments and onsite sanitary survey data, integrated with WQMIS structure through cloud based secured | 226.19 |
27 | South 24 Pgs. W/S Division - I | ORD/000474/2022-2023 | 24/01/2023 | 2705/SWD-I | SUNANDA ENVIROMENTAL INTERNATIONAL PVT LTD | Day to day upkeep, upgradation of State Water Quality Dash board, web interface, integration of stock management, laboratory assessment, all water quality data & laboratory data management for analytical reports (Online & Offline). Through over all coordi | 210.83 |
28 | South 24 Pgs. W/S Division - I | ORD/000607/2022-2023 | 27/02/2023 | 3137/SWD-I | PROJECT AND MAINTENANCE | Supply fitting fixing of CI Rising Type Sluice Gate (as per IS:3042-1965) of various size and rectangular in shape, for clear water GLRs at different locations under the ¿Mega Surface Water Based Water Supply Scheme for Falta-Mathurapur, Dist. South 24 Pa | 37.42 |
29 | South 24 Pgs. W/S Division - I | ORD/000614/2022-2023 | 30/05/2022 | 518/SWD-I | BIKASH SARDAR | Hiring of diesel driven Non-Air conditioner Motor Cab having BS-III & above category (Luxury Ambassador / Indica / Swift Dezire Car) with driver for official use of the Assistant Engineer, Sub-Division-I under South 24-Pgns. W/S Division-I, PHE Dte. [w.e. | 1.73 |
30 | South 24 Pgs. W/S Division - I | ORD/000096/2023-2024 | 04/05/2023 | 787/SWD-I | DIPAK NASKAR | Hiring of additional 01 (one) no. diesel driven Non-Air conditioner Motor Cab having BS-III & above category (Luxury Ambassador / Indica / Swift Dezire Car) with driver for monitoring different JJM activities under the Assistant Engineers (HQ-I), South 24 | 0.87 |
31 | South 24 Pgs. W/S Division - I | ORD/000176/2023-2024 | 31/05/2023 | 778/SWD-I | PUSPA JAISWAL | Hiring of additional 01 (one) no. diesel driven non-Air-conditioned Motor Cab having BS-III & above category (Luxury Ambassador / Indica / Swift Desire Car) with driver for monitoring different JJM activities of Bishnupur-II Block under the Assistant Engi | 0.87 |
32 | South 24 Pgs. W/S Division - I | ORD/000878/2022-2023 | 31/03/2023 | 3730/SWD-I | AJAY KUMAR | Continuation order for the work of "Hiring of diesel driven Non-Air conditioner Maxi Cab having BS-III & above category (Luxury Ambassador / Indica / Swift Dezire Car) with driver for official use of the Deputy Secretary / Assistant Secretary, Public Heal | 0.89 |
33 | South 24 Pgs. W/S Division - I | ORD/000239/2023-2024 | 18/07/2023 | 1436/SWD-I | PROJECT AND MAINTENANCE | Supplying, Delivery & installation of different diameter valves, MS strainers and allied specials for MS pipe line work inside GLRs at different locations of Mega Surface Water Based Water Supply Scheme for Falta- Mathurapur, District- South 24 Pgns. unde | 106.50 |
34 | South 24 Pgs. W/S Division - I | ORD/000555/2023-2024 | 10/10/2023 | 2525/SWD-I | GEO SOLUTION | Design of Route survey of revised secondary grid diagram of GLR-2 at Diamond Harbour Block due to change of route under Mega Surface water Based water supply scheme of South 24 Parganas district under South 24-Pgns W/S Divn-I, PHE Dte. (Route surveying of | 2.11 |
35 | South 24 Pgs. W/S Division - I | ORD/000505/2021-2022 | 27/01/2022 | 1904/SWD-I | RADIANT | Preparation and submission of Detailed Project Report of KALYANPUR (KHODAR BAZAR) , PART-II Ground Water Based Piped Water Supply Scheme in BARUIPUR PASCHIM Assembly Constituency of BARUIPUR Block under Surface Water Based Water Supply Scheme in the Arse | 2.62 |
36 | South 24 Pgs. W/S Division - I | ORD/000508/2021-2022 | 27/01/2022 | 1910\SWD-I | RADIANT | Preparation and submission of Detailed Project Report of HARIHARPUR Ground Water Based Piped Water Supply Scheme in BARUIPUR PASCHIM Assembly Constituency of BARUIPUR Block under Surface Water Based Water Supply Scheme in the Arsenic affected areas of S | 2.76 |
37 | South 24 Pgs. W/S Division - I | ORD/000509/2021-2022 | 27/01/2022 | 1942/SWD-I | RADIANT | Preparation and submission of Detailed Project Report of BRINDAKHALI(I) Ground Water Based Piped Water Supply Scheme in BARUIPUR PURBA Assembly Constituency of BARUIPUR Block under Surface Water Based Water Supply Scheme in the Arsenic affected areas of | 2.76 |
38 | South 24 Pgs. W/S Division - I | ORD/000567/2021-2022 | 15/02/2022 | 2264/SWD-I | SHYAMAL MONDAL | Water Supply arrangement for AWCs as per different models of work under BHANGAR-I block (PARANGANJ GP of BHANGAR AC) under South 24-Parganas W/S Division-I, PHE Dte. (3 Nos. Model-7) (Group-89) | 7.99 |
39 | South 24 Pgs. W/S Division - I | ORD/000557/2023-2024 | 13/10/2023 | 2585/SWD-I | M/S LOKENATH CONSTRUCTION | Construction of 1250 m3 capacity 20 M. staging height R.C.C. Over Head Water Reservoir as per departmental design, drawing & specification with R.C.C. Bored Pile & Pile Cap for Augmentation of laying distribution system to extend the benefit of 100% House | 439.11 |
40 | South 24 Pgs. W/S Division - I | ORD/000507/2021-2022 | 27/01/2022 | 1906/SWD-I | RADIANT | Preparation and submission of Detailed Project Report of PIYALI KOLAGHATA , PART-II Ground Water Based Piped Water Supply Scheme in BARUIPUR PASCHIM Assembly Constituency of BARUIPUR Block under Surface Water Based Water Supply Scheme in the Arsenic affe | 2.76 |
41 | South 24 Pgs. W/S Division - I | ORD/000564/2021-2022 | 15/02/2022 | 22009/SWD-I | M/S L.P CONSTRUCTION | Water Supply arrangement for AWCs as per different models of work under BHANGAR-I block (PARANGANJ GP of BHANGAR AC) under South 24-Parganas W/S Division-I, PHE Dte. (13 Nos. Model-6) (Group-88) | 34.28 |
42 | South 24 Pgs. W/S Division - I | ORD/000566/2021-2022 | 25/03/2022 | 2694/SWD-I | SADHURHAT CO OP LABOUR CONSTRACT AND CONSTRUCTION SOCIETY LTD. | Construction of boundary wall for proposed OHR Site of Zone-I within Mandirbazar block, Mouza-Mallik Protap under Mega Surface Water Based Water Supply Secheme for Falta-Mathurapur, Dist. South 24 Paraganas. (Length- 200.6 mtr.) under South 24-Pgns. W/S D | 26.82 |
43 | South 24 Pgs. W/S Division - I | ORD/000563/2021-2022 | 15/02/2022 | 2242/SWD-I | M/S L.P CONSTRUCTION | Water Supply arrangement for GOVT. SCHOOLS as per different models of work under BHANGAR-I block (CH-II GP of CANNING PURBA AC) under South 24-Parganas W/S Division-I, PHE Dte. (3 Nos. Model-2 and 3 Nos. Model-6) (Group-102) | 13.29 |
44 | South 24 Pgs. W/S Division - I | ORD/000514/2021-2022 | 27/01/2022 | 1984/SWD-I | RADIANT | Preparation and submission of Detailed Survey, Design and Drawing for laying distribution system of PUKURIA MOUZA in MANDIRBAZAR (ZONE-II) Block under Mega Surface Water Based Water Supply Scheme for Falta-Mathurapur, South 24-Pgns. district. | 4.83 |
45 | South 24 Pgs. W/S Division - I | ORD/000551/2023-2024 | 06/10/2023 | 2499/SWD-I | TAPAS KUMAR GIRI | Additional work for Sinking of 02 (Two) nos. Rig bored 250mm X 150mm dia & 300 mtr. deep Tubewell to achieve 66 mtr. housing pipe by Rotary method for Water supply arrangement for PWSS of JAYATALA PWSS of Baruipur Block for Augmentation of Surface Water | 3.14 |
46 | South 24 Pgs. W/S Division - I | ORD/000506/2021-2022 | 27/01/2022 | 1905/SWD-I | RADIANT | Preparation and submission of Detailed Project Report of MALLIKPUR , PART-II Ground Water Based Piped Water Supply Scheme in BARUIPUR PASCHIM Assembly Constituency of BARUIPUR Block under Surface Water Based Water Supply Scheme in the Arsenic affected ar | 2.62 |
47 | South 24 Pgs. W/S Division - I | ORD/000548/2023-2024 | 06/10/2023 | 2496/SWD-I | R.D CONSTRUCTION | Laying of 90mm &160mm dia HDPE Pipe line over Kulpi Road near Uttar Sultanpur Railway Gate, over Dhola Road near Dhola Railway Gate & over Shibpur Road near Polerhat Railway Gate with allied works for Augmentation of Laying Distribution System to exten | 3.39 |
48 | South 24 Pgs. W/S Division - I | ORD/000543/2023-2024 | 06/10/2023 | 2491/SWD-I | M/S LAXMI ENTERPRISE | Chemicals and other required items related to smooth functioning of NABL Recognition of Baruipur Sub District Water Testing Laboratory under SWD-I, PHE Dte. (SM/10195) | 0.85 |
49 | South 24 Pgs. W/S Division - I | ORD/000625/2023-2024 | 09/11/2023 | 2806/SWD-I | A S BUILDCON | Providing 905 nos. Functional Household Tap connection (FHTC) For Satberia PWSS Under Block:Bhangar-I, District: South 24 parganas to accommodate FHTC in Bhangar-I Block under South 24-Partganas, W/S Division-I for Augmentation of Surface Water Based W/S | 33.11 |
50 | South 24 Pgs. W/S Division - I | ORD/000579/2021-2022 | 15/02/2022 | 2277/SWD-I | R.G ENTERPRISE ( BHOWANIPORE) | Water Supply arrangement for AWCs as per different models of work under BHANGAR-I block (NARAYANPUR GP of BHANGAR AC) under South 24-Parganas W/S Division-I, PHE Dte. (2 Nos. Model-7) (Group-94) | 5.35 |
51 | South 24 Pgs. W/S Division - I | ORD/000568/2021-2022 | 15/02/2022 | 2127/SWD-I | M/S. SYSCON | Water Supply arrangement for GOVT. SCHOOLS as per different models of work under THAKURPUKUR-MAHESHTALA block under South 24-Parganas W/S Division-I, PHE Dte. (1 No. Model-6) (Group-120) | 2.65 |
52 | South 24 Pgs. W/S Division - I | ORD/000580/2021-2022 | 15/02/2022 | 2227/SWD-I | RAMASISH ENTERPRISE | Water Supply arrangement for GOVT. SCHOOLS as per different models of work under BHANGAR-I block (TARDAH GP of CANNING PURBA AC) under South 24-Parganas W/S Division-I, PHE Dte. (7 Nos. Model-6) (Group-114) | 18.54 |
53 | South 24 Pgs. W/S Division - I | ORD/000565/2021-2022 | 15/02/2022 | 220.1/SWD-I | VISHAL CONSTRUCTION CO. | Water Supply arrangement for AWCs as per different models of work under BUDGE BUDGE-I block under South 24-Parganas W/S Division-I, PHE Dte. (16 Nos. Model-6) (Group-30) | 41.76 |
54 | South 24 Pgs. W/S Division - I | ORD/000510/2021-2022 | 27/01/2022 | 1943/SWD-I | RADIANT | Preparation and submission of Detailed Project Report of BRINDAKHALI(II) Ground Water Based Piped Water Supply Scheme in BARUIPUR PURBA Assembly Constituency of BARUIPUR Block under Surface Water Based Water Supply Scheme in the Arsenic affected areas of | 2.76 |
55 | South 24 Pgs. W/S Division - I | ORD/000512/2021-2022 | 27/01/2022 | 1983/SWD-I | RADIANT | Preparation and submission of Detailed Survey, Design and Drawing for laying distribution system of MALLICKPRATAP MOUZA in MANDIRBAZAR (ZONE-I) Block under Mega Surface Water Based Water Supply Scheme for Falta-Mathurapur, South 24-Pgns. district. | 4.83 |
56 | South 24 Pgs. W/S Division - I | ORD/000662/2023-2024 | 24/11/2023 | 2958/SWD-I | M/S SHIBAM ENTERPRISE | Carriage of K9 DI pipes of various diameters from Dongaria WTP PHE stores to work site at Mandirbazar for laying of Secondary Grid pipeline within Mandirbazar Block under the Augmentation of LDS to extend the benefit of 100% households in Zone-I at Mandi | 1.24 |
57 | South 24 Pgs. W/S Division - I | ORD/000577/2021-2022 | 15/02/2022 | 2188/SWD-I | MANAS CHATTERJEE | Water Supply arrangement for GOVT. SCHOOLS as per different models of work under BISHNUPUR I block under South 24-Parganas W/S Division-I, PHE Dte. (22 Nos. Model-6) (Group-2) | 58.26 |
58 | South 24 Pgs. W/S Division - I | ORD/000668/2023-2024 | 30/11/2023 | 3019/SWD-I | KALAM ENTERPRISE | Supplying, fitting, fixing of Barbed wire fencing over existing Boundary wall & Construction of Drain at 2nd Tubewell site of Kalikapur PWSS within Sonarpur Block " KALIKAPUR Piped Water Supply Scheme to accommodate FHTC in Sonarpur Block under South 24-P | 1.89 |
59 | South 24 Pgs. W/S Division - I | ORD/000578/2021-2022 | 15/02/2022 | 2212/SWD-I | A.G. ENTERPRISE | Water Supply arrangement for HEALTH CENTRES as per different models of work under SONARPUR block under South 24-Parganas W/S Division-I, PHE Dte. (12 Nos. Model-6) (Group-80) | 31.77 |
60 | South 24 Pgs. W/S Division - I | ORD/000562/2023-2024 | 16/10/2023 | 2603/SWD-I | NILKANTHA ENTERPRISE | Construction of Pathway at 2nd site of Kalikapur PWSS within Sonarpur Block in connetion with" KALIKAPUR Piped Water Supply Scheme to accommodate FHTC in Sonarpur Block under South 24-Parganas, W/S Division-I, PHE Dte. for Augmentation of Surface Water Ba | 4.53 |
61 | South 24 Pgs. W/S Division - I | ORD/000581/2021-2022 | 15/02/2022 | 2210/SWD-I | NILKAMAL BASAK | Water Supply arrangement for AWCs as per different models of work under BISHNUPUR II block under South 24-Parganas W/S Division-I, PHE Dte. (3 Nos. Model-2 and 10 Nos. Model-6) (Group-15) | 31.79 |
62 | South 24 Pgs. W/S Division - I | ORD/000582/2021-2022 | 16/03/2022 | 2618/SWD-I | PROJECT AND MAINTENANCE | Water Supply arrangement for GOVT. SCHOOLS as per different models of work under BHANGAR-I block (PARANGANJ GP of BHANGAR AC) under South 24-Parganas W/S Division-I, PHE Dte. (6 Nos. Model-6) (Group-86) [2nd Call] | 15.88 |
63 | South 24 Pgs. W/S Division - I | ORD/000695/2023-2024 | 12/12/2023 | 3190\SWD-I | UNITED BUILDERS | Construction of 1500 Cu.m. capacity 20 M. staging height R.C.C. Over Head Water Reservoir as per departmental design, drawing & specification including R.C.C. Bored Pile and raft foundation within Zone-IV at Gordoani Mouza of Joynagar-II Block for Augment | 440.77 |
64 | South 24 Pgs. W/S Division - I | ORD/000916/2022-2023 | 05/09/2022 | 1221/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based CHHAYANI Piped Water Supply Scheme to accommodate FHTC in Baruipur Block under south 24-Pgns W/S Division-I, P.H.E. Dte., for Augmentation of Surface Water Based Water Supply Sch | 2.54 |
65 | South 24 Pgs. W/S Division - I | ORD/000917/2022-2023 | 23/06/2022 | 706/SWD-I | ECO CARE | Preparation and submission of Detailed Project Report of "DHOSA Ground Water Based Piped Water Supply Scheme" in JOYNAGAR-I block under Surface Water Based Water Supply Scheme in the Arsenic affected areas of South 24-Pgns. district. [2nd call] | 2.56 |
66 | South 24 Pgs. W/S Division - I | ORD/000918/2022-2023 | 30/08/2022 | 1169/SWD-I | ASTER CONSULTANCY | Preparation and submission of Detailed Project Report of Ground Water Based TEAUR HAT Piped Water Supply Scheme to accommodate FHTC in Baruipur Block under South 27-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme in | 3.12 |
67 | South 24 Pgs. W/S Division - I | ORD/000919/2022-2023 | 30/08/2022 | 1170/SWD-I | ASTER CONSULTANCY | Preparation and submission of Detailed Project Report of Ground Water Based AKNA MIRJAPUR Piped Water Supply Scheme to accommodate FHTC in Baruipur Block under South 27-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Schem | 3.34 |
68 | South 24 Pgs. W/S Division - I | ORD/000998/2022-2023 | 16/08/2022 | 1073/SWD-I | S.K. ENTERPRISE | SupplyofdifferentCIDFspecialsfor layingof DIpipe(250mm dia & 400mm dia)at zone-II B (Mayahauri)of Joynagar-II Blockof BaruipurSub-Division, for "MegaSurface Based water supply schemeforFalta-Mathurapur, DistrictSouth24-Pgns, W/S Division-I, PHE. Dte. | 0.72 |
69 | South 24 Pgs. W/S Division - I | ORD/000968/2022-2023 | 20/09/2022 | 1385/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Bantra Piped Water Supply Scheme to accommodate FHTC in Joynagar-I Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme in | 2.92 |
70 | South 24 Pgs. W/S Division - I | ORD/000976/2022-2023 | 22/09/2022 | 1429/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Uttar Gopinathpur Piped Water Supply Scheme to accommodate FHTC in Magrahat-II Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Suppl | 2.78 |
71 | South 24 Pgs. W/S Division - I | ORD/000969/2022-2023 | 20/09/2022 | 1386/SWD-I | MEASURE LAND | Preparation and submission of Detailed Project Report of Ground Water Based Baharu Piped Water Supply Scheme to accommodate FHTC in Joynagar-I Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme in | 2.91 |
72 | South 24 Pgs. W/S Division - I | ORD/000981/2022-2023 | 26/09/2022 | 1455/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Bishweshwarpur Piped Water Supply Scheme to accommodate FHTC in Magrahat-II Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply S | 2.80 |
73 | South 24 Pgs. W/S Division - I | ORD/000995/2022-2023 | 27/09/2022 | 1466\SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Mallarchak Ishwaripur Piped Water Supply Scheme to accommodate FHTC in Magrahat-II Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water S | 2.60 |
74 | South 24 Pgs. W/S Division - I | ORD/000928/2022-2023 | 01/09/2022 | 1180/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Surjapur Piped Water Supply Scheme to accommodate FHTC in Baruipur Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme in | 2.36 |
75 | South 24 Pgs. W/S Division - I | ORD/000973/2022-2023 | 22/09/2022 | 1426/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Shyampur(part-II) Piped Water Supply Scheme to accommodate FHTC in Magrahat-II Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Suppl | 2.73 |
76 | South 24 Pgs. W/S Division - I | ORD/000923/2022-2023 | 31/08/2022 | 1176/SWD-I | ASTER CONSULTANCY | Preparation and submission of Detailed Project Report of Ground Water Based BANBERIA Piped Water Supply Scheme to accommodate FHTC in Baruipur Block under South 27-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme in | 3.01 |
77 | South 24 Pgs. W/S Division - I | ORD/000925/2022-2023 | 01/09/2022 | 1181/SWD-I | ASTER CONSULTANCY | Preparation and submission of Detailed Project Report of Ground Water Based RAMDHARI Piped Water Supply Scheme to accommodate FHTC in Baruipur Block under South 27-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme in | 3.04 |
78 | South 24 Pgs. W/S Division - I | ORD/000920/2022-2023 | 30/08/2022 | 1171/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Jamalhati Piped Water Supply Scheme to accommodate FHTC in Baruipur Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme in | 2.46 |
79 | South 24 Pgs. W/S Division - I | ORD/000936/2022-2023 | 07/09/2022 | 1237/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Pachim Madhabpur Piped Water Supply Scheme to accommodate FHTC in Baruipur Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Sc | 2.37 |
80 | South 24 Pgs. W/S Division - I | ORD/000938/2022-2023 | 08/09/2022 | 1251/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Kharupatalia Piped Water Supply Scheme to accommodate FHTC in Baruipur Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme | 2.54 |
81 | South 24 Pgs. W/S Division - I | ORD/000947/2022-2023 | 24/08/2022 | 1128/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Raskhali Piped Water Supply Scheme to accommodate FHTC in Bishnupur-I Block under South 24-Pgns W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme | 2.94 |
82 | South 24 Pgs. W/S Division - I | ORD/000957/2022-2023 | 14/09/2022 | 1307/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Rajpur Korabag Piped Water Supply Scheme to accommodate FHTC in Joynagar-I Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Sc | 2.64 |
83 | South 24 Pgs. W/S Division - I | ORD/000959/2022-2023 | 25/08/2022 | 1138/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Bagi Piped Water Supply Scheme to accommodate FHTC in Bishnupur-I Block under South 24-Pgns W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme in | 3.16 |
84 | South 24 Pgs. W/S Division - I | ORD/000962/2022-2023 | 29/08/2022 | 1166/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Kannyanagar Piped Water Supply Scheme to accommodate FHTC in Bishnupur-I Block under South 24-Pgns W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Sch | 2.92 |
85 | South 24 Pgs. W/S Division - I | ORD/000963/2022-2023 | 29/08/2022 | 1167/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Uttar Kazirhat Piped Water Supply Scheme to accommodate FHTC in Bishnupur-I Block under South 24-Pgns W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply | 2.97 |
86 | South 24 Pgs. W/S Division - I | ORD/000965/2022-2023 | 29/08/2022 | 1168/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Rashapunja Piped Water Supply Scheme to accommodate FHTC in Bishnupur-I Block under South 24-Pgns W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Sche | 3.11 |
87 | South 24 Pgs. W/S Division - I | ORD/000696/2023-2024 | 14/12/2023 | 3234/SWD-I | SRIJON ENTERPRISE | Laying of balanced portion of secondary grid at different locations (Nainan Bridge, Nilar Bridge & Sukdevpur Bridge) along Nainan to Dewantala Road of Diamond Harbour-II Block with allied works under ¿Mega Surface water based water supply scheme for Fal | 38.28 |
88 | South 24 Pgs. W/S Division - I | ORD/000970/2022-2023 | 20/09/2022 | 1387/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Urel Chandpur Piped Water Supply Scheme to accommodate FHTC in Magrahat-II Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Sc | 2.70 |
89 | South 24 Pgs. W/S Division - I | ORD/000978/2022-2023 | 23/09/2022 | 1434/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Multi Piped Water Supply Scheme to accommodate FHTC in Magrahat-II Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme in | 2.84 |
90 | South 24 Pgs. W/S Division - I | ORD/000971/2022-2023 | 21/09/2022 | 1405/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Magrahat Piped Water Supply Scheme to accommodate FHTC in Magrahat-II Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme | 2.64 |
91 | South 24 Pgs. W/S Division - I | ORD/000980/2022-2023 | 23/09/2022 | 1436/SWD-I | MEASURE LAND | Preparation and submission of Detailed Project Report of Ground Water Based Jaldhapa Piped Water Supply Scheme to accommodate FHTC in Magrahat-II Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme | 2.89 |
92 | South 24 Pgs. W/S Division - I | ORD/000953/2022-2023 | 14/09/2022 | 1304/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Uttar Durgapur Piped Water Supply Scheme to accommodate FHTC in Joynagar-I Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Sc | 2.72 |
93 | South 24 Pgs. W/S Division - I | ORD/000960/2022-2023 | 15/09/2022 | 1330/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Lakshminarayanpur Piped Water Supply Scheme to accommodate FHTC in Joynagar-I Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply | 2.70 |
94 | South 24 Pgs. W/S Division - I | ORD/000961/2022-2023 | 25/08/2022 | 1139/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Abjakhali Piped Water Supply Scheme to accommodate FHTC in Bishnupur-I Block under South 24-Pgns W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Schem | 2.85 |
95 | South 24 Pgs. W/S Division - I | ORD/000983/2022-2023 | 26/09/2022 | 1457/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Jugdia Piped Water Supply Scheme to accommodate FHTC in Magrahat-II Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme in | 2.77 |
96 | South 24 Pgs. W/S Division - I | ORD/000927/2022-2023 | 31/08/2022 | 1175/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Bagdah Piped Water Supply Scheme to accommodate FHTC in Baruipur Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme in th | 2.46 |
97 | South 24 Pgs. W/S Division - I | ORD/000934/2022-2023 | 06/09/2022 | 1226/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Rana Piped Water Supply Scheme to accommodate FHTC in Baruipur Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme in the | 2.54 |
98 | South 24 Pgs. W/S Division - I | ORD/000937/2022-2023 | 08/09/2022 | 1250/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Nor Piped Water Supply Scheme to accommodate FHTC in Baruipur Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme in the A | 2.45 |
99 | South 24 Pgs. W/S Division - I | ORD/000951/2022-2023 | 14/09/2022 | 1297/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Uttar Paranji Piped Water Supply Scheme to accommodate FHTC in Joynagar-I Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Sch | 2.74 |
100 | South 24 Pgs. W/S Division - I | ORD/000954/2022-2023 | 14/09/2022 | 1305/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Tajpur Fatepur Piped Water Supply Scheme to accommodate FHTC in Joynagar-I Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Sc | 2.66 |
101 | South 24 Pgs. W/S Division - I | ORD/000964/2022-2023 | 29/08/2022 | 1164/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Chak Rasanmamud Piped Water Supply Scheme to accommodate FHTC in Bishnupur-I Block under South 24-Pgns W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply | 2.46 |
102 | South 24 Pgs. W/S Division - I | ORD/000966/2022-2023 | 29/08/2022 | 1165/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Gabbaria Piped Water Supply Scheme to accommodate FHTC in Bishnupur-I Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme | 2.70 |
103 | South 24 Pgs. W/S Division - I | ORD/000999/2022-2023 | 16/08/2022 | 1072/SWD-I | S.K. ENTERPRISE | Supply of different CIDF specials for layingof DIpipeat zone-II A (Mayahauri)of Joynagar-II Block of Baruipur Sub-Division, for "Mega Surface Based water supply scheme for Falta-Mathurapur, District South 24-Pgns, W/S Division-I, PHE. Dte. | 3.18 |
104 | South 24 Pgs. W/S Division - I | ORD/000931/2022-2023 | 05/09/2022 | 1222/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Teka Piped Water Supply Scheme to accommodate FHTC in Baruipur Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme in the | 2.47 |
105 | South 24 Pgs. W/S Division - I | ORD/000921/2022-2023 | 31/08/2022 | 1173/SWD-I | ASTER CONSULTANCY | Preparation and submission of Detailed Project Report of Ground Water Based HARAL Piped Water Supply Scheme to accommodate FHTC in Baruipur Block under South 27-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme in the | 3.08 |
106 | South 24 Pgs. W/S Division - I | ORD/000924/2022-2023 | 31/08/2022 | 1177/SWD-I | ASTER CONSULTANCY | Preparation and submission of Detailed Project Report of Ground Water Based GANGADUARA Piped Water Supply Scheme to accommodate FHTC in Baruipur Block under South 27-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme i | 2.68 |
107 | South 24 Pgs. W/S Division - I | ORD/000922/2022-2023 | 31/08/2022 | 1174/SWD-I | ASTER CONSULTANCY | Preparation and submission of Detailed Project Report of Ground Water Based MALAYAPUR Piped Water Supply Scheme to accommodate FHTC in Baruipur Block under South 27-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme in | 2.57 |
108 | South 24 Pgs. W/S Division - I | ORD/000926/2022-2023 | 01/09/2022 | 1182/SWD-I | ASTER CONSULTANCY | Preparation and submission of Detailed Project Report of Ground Water Based PARULDAHA Piped Water Supply Scheme to accommodate FHTC in Baruipur Block under South 27-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme in | 2.82 |
109 | South 24 Pgs. W/S Division - I | ORD/000932/2022-2023 | 06/09/2022 | 1224/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Sankarpur Piped Water Supply Scheme to accommodate FHTC in Baruipur Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme in | 2.46 |
110 | South 24 Pgs. W/S Division - I | ORD/000929/2022-2023 | 02/09/2022 | 1198/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Petua (Part-II) Piped Water Supply Scheme to accommodate FHTC in Baruipur Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Sch | 2.54 |
111 | South 24 Pgs. W/S Division - I | ORD/000930/2022-2023 | 05/09/2022 | 1220/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Dehimedan Malla Piped Water Supply Scheme to accommodate FHTC in Baruipur Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Sch | 2.63 |
112 | South 24 Pgs. W/S Division - I | ORD/000933/2022-2023 | 06/09/2022 | 1225/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Rantanpur Piped Water Supply Scheme to accommodate FHTC in Baruipur Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme in | 2.54 |
113 | South 24 Pgs. W/S Division - I | ORD/000939/2022-2023 | 09/09/2022 | 1256/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Kanthal Beria Piped Water Supply Scheme to accommodate FHTC in Baruipur Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Schem | 2.46 |
114 | South 24 Pgs. W/S Division - I | ORD/000940/2022-2023 | 09/09/2022 | 1257/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Dudhnai Piped Water Supply Scheme to accommodate FHTC in Baruipur Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme in t | 2.50 |
115 | South 24 Pgs. W/S Division - I | ORD/000943/2022-2023 | 12/09/2022 | 1265/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Chakar Bar Piped Water Supply Scheme to accommodate FHTC in Baruipur Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme i | 2.43 |
116 | South 24 Pgs. W/S Division - I | ORD/000944/2022-2023 | 24/08/2022 | 1127/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Chak Netai Piped Water Supply Scheme to accommodate FHTC in Bishnupur-I Block under South 24-Pgns W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Sche | 3.05 |
117 | South 24 Pgs. W/S Division - I | ORD/000935/2022-2023 | 06/09/2022 | 1227/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Purandarpur Piped Water Supply Scheme to accommodate FHTC in Baruipur Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme | 2.50 |
118 | South 24 Pgs. W/S Division - I | ORD/000941/2022-2023 | 09/09/2022 | 1258/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Dhopa Gachhi Piped Water Supply Scheme to accommodate FHTC in Baruipur Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme | 2.48 |
119 | South 24 Pgs. W/S Division - I | ORD/000942/2022-2023 | 09/09/2022 | 1259/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Chandanpukur Piped Water Supply Scheme to accommodate FHTC in Baruipur Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme | 2.49 |
120 | South 24 Pgs. W/S Division - I | ORD/000945/2022-2023 | 12/09/2022 | 1266/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Beralia Piped Water Supply Scheme to accommodate FHTC in Baruipur Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme in t | 2.54 |
121 | South 24 Pgs. W/S Division - I | ORD/000948/2022-2023 | 13/09/2022 | 1279/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Dakshin Kalyanpur Piped Water Supply Scheme to accommodate FHTC in Baruipur Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply S | 2.47 |
122 | South 24 Pgs. W/S Division - I | ORD/000952/2022-2023 | 14/09/2022 | 1298/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Ramkrishnapur Piped Water Supply Scheme to accommodate FHTC in Joynagar-I Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Sch | 2.92 |
123 | South 24 Pgs. W/S Division - I | ORD/000708/2023-2024 | 02/01/2024 | 14/SWD-I | CONCORD EMC ENCLAVE LLP | Surveying, planning, Designing, execution and commissioning of recirculation system in order to redirect the entire over flow water of sludge pond and rain water of adjacent areas by construction of storage pond minimum 2400 Cu.m capacity with proper sl | 420.00 |
124 | South 24 Pgs. W/S Division - I | ORD/000979/2022-2023 | 23/09/2022 | 1435/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Mirzapur Piped Water Supply Scheme to accommodate FHTC in Magrahat-II Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme | 2.76 |
125 | South 24 Pgs. W/S Division - I | ORD/000982/2022-2023 | 26/09/2022 | 1456/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Dhanpota Piped Water Supply Scheme to accommodate FHTC in Magrahat-II Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme | 2.65 |
126 | South 24 Pgs. W/S Division - I | ORD/000984/2022-2023 | 27/09/2022 | 1477/SWD-I | MEASURE LAND | Preparation and submission of Detailed Project Report of Ground Water Based Harisankarpur Piped Water Supply Scheme to accommodate FHTC in Magrahat-II Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Sc | 2.76 |
127 | South 24 Pgs. W/S Division - I | ORD/000985/2022-2023 | 27/09/2022 | 1482/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Benipur Piped Water Supply Scheme to accommodate FHTC in Magrahat-II Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme i | 2.92 |
128 | South 24 Pgs. W/S Division - I | ORD/000989/2022-2023 | 27/09/2022 | 1493/SWD-I | MEASURE LAND | Preparation and submission of Detailed Project Report of Ground Water Based Beladanga Piped Water Supply Scheme to accommodate FHTC in Jaynagar-I Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme | 2.47 |
129 | South 24 Pgs. W/S Division - I | ORD/000986/2022-2023 | 27/09/2022 | 1483/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Dongajora Piped Water Supply Scheme to accommodate FHTC in Kultoli Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme in | 2.40 |
130 | South 24 Pgs. W/S Division - I | ORD/000990/2022-2023 | 28/09/2022 | 1502/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Bidyadharpur Piped Water Supply Scheme to accommodate FHTC in Sonarpur Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme | 2.90 |
131 | South 24 Pgs. W/S Division - I | ORD/000991/2022-2023 | 28/09/2022 | 1503/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Gopalpur Piped Water Supply Scheme to accommodate FHTC in Sonarpur Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme in | 2.76 |
132 | South 24 Pgs. W/S Division - I | ORD/000992/2022-2023 | 29/09/2022 | 1532/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Dakshin Roypur Piped Water Supply Scheme to accommodate FHTC in Budge Budge-II Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Suppl | 2.42 |
133 | South 24 Pgs. W/S Division - I | ORD/000974/2022-2023 | 22/09/2022 | 1427/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Shyampur(part-I) Piped Water Supply Scheme to accommodate FHTC in Magrahat-II Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply | 2.74 |
134 | South 24 Pgs. W/S Division - I | ORD/000972/2022-2023 | 21/09/2022 | 1406/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Chak Haranandapur Piped Water Supply Scheme to accommodate FHTC in Magrahat-II Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Suppl | 2.55 |
135 | South 24 Pgs. W/S Division - I | ORD/000987/2022-2023 | 27/09/2022 | 1484/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Sankharipur Piped Water Supply Scheme to accommodate FHTC in Baruipuri Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Schem | 2.46 |
136 | South 24 Pgs. W/S Division - I | ORD/000988/2022-2023 | 27/09/2022 | 1485/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Hariharpara Piped Water Supply Scheme to accommodate FHTC in Baruipuri Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme | 2.99 |
137 | South 24 Pgs. W/S Division - I | ORD/000993/2022-2023 | 29/09/2022 | 1533/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Haori Piped Water Supply Scheme to accommodate FHTC in Budge Budge-II Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme | 2.45 |
138 | South 24 Pgs. W/S Division - I | ORD/000975/2022-2023 | 22/09/2022 | 1428/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Panchpara Piped Water Supply Scheme to accommodate FHTC in Magrahat-II Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme | 2.76 |
139 | South 24 Pgs. W/S Division - I | ORD/000946/2022-2023 | 13/09/2022 | 1278/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Balbalia Piped Water Supply Scheme to accommodate FHTC in Baruipur Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme in | 2.76 |
140 | South 24 Pgs. W/S Division - I | ORD/000949/2022-2023 | 13/09/2022 | 1280/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Bejerancha Piped Water Supply Scheme to accommodate FHTC in Baruipur Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme i | 2.44 |
141 | South 24 Pgs. W/S Division - I | ORD/000950/2022-2023 | 24/08/2022 | 1129/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Dakshin Gouripur Piped Water Supply Scheme to accommodate FHTC in Bishnupur-I Block under South 24-Pgns W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Suppl | 2.91 |
142 | South 24 Pgs. W/S Division - I | ORD/000955/2022-2023 | 24/08/2022 | 1130/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Bhandaria Piped Water Supply Scheme to accommodate FHTC in Bishnupur-I Block under South 24-Pgns W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Schem | 2.89 |
143 | South 24 Pgs. W/S Division - I | ORD/000956/2022-2023 | 14/09/2022 | 1306/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Raynagar Piped Water Supply Scheme to accommodate FHTC in Joynagar-I Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme i | 2.95 |
144 | South 24 Pgs. W/S Division - I | ORD/000958/2022-2023 | 01/09/2022 | 1183/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Mahishmari Piped Water Supply Scheme to accommodate FHTC in Joynagar-I Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Scheme | 2.76 |
145 | South 24 Pgs. W/S Division - I | ORD/000967/2022-2023 | 20/09/2022 | 1384/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Kalikapur Barasat Piped Water Supply Scheme to accommodate FHTC in Joynagar-I Block under South 27-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply | 2.77 |
146 | South 24 Pgs. W/S Division - I | ORD/000994/2022-2023 | 29/09/2022 | 1534/SWD-I | GEO SOLUTION | Preparation and submission of Detailed Project Report of Ground Water Based Chandipur Piped Water Supply Scheme to accommodate FHTC in Budge Budge-II Block under South 24-Pgs W/S Division-I, PHE Dte for Augmentation of Surface Water Based Water Supply Sch | 2.37 |
Total | 3,963.38 |