Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
2 27.87 2.77 9.94  
1 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION OF SUB SURFACE WATER BASED WATER SUPPLY SCHEME FOR KRISHNAPUR, UNDER DURGAPUR W/S DIVISION , BLOCK : KANKSA, DISTRICT : PASCHIM BARDDHAMAN , SM/18887 Augmentation Acceptance cum Work Order for Construction of Boundary wall and allied works at Krishnapur tube well No-02 under Augmentation of Krishnapur Piped water Supply scheme under Kanksa Block under RCFA Division-I,PHE Dte Assistant Engineer 3 Junior Engineer 7 ORD/001188/2023-2024 1007/RCD-I 16/03/2024 30 MOTIONMASS TECHNO (OPC) PRIVATE LIMITED 7.12 2.77 38.9 80
2 PASCHIM BARDHAMAN Durgapur W/S Division AUGMENTATION OF SUB SURFACE WATER BASED WATER SUPPLY SCHEME FOR KRISHNAPUR, UNDER DURGAPUR W/S DIVISION , BLOCK : KANKSA, DISTRICT : PASCHIM BARDDHAMAN , SM/18887 Augmentation Desing supplying fabrication installation commissioning with 3-month trails run including cost of routine testing of water sample for performance evalution of 50 M3/Hr capacity of pressure type Iron elimination plants as per design norms of PHE Dte with provision of polishing unit including block- Kanksa at Krishnapur under Augmentation of Krishnapur PWSS under DWSD, PHE Dte ORD/000194/2018-2019 223/DWSD 08/03/2019 90 MAITO MAA ENTERPRISE 20.75 0.00 0 100
Total 27.87 2.77 9.93