Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 604.87 536.52 88.7  
1 PASCHIM BARDHAMAN Kanksa RCFA Division -I NAPARA PIPED WATER SUPPLY SCHEME. , SM/11932 New Acceptance cum work order for Trial run & special Maintenance of Rising main & Distribution system with operating of valve within command area under Augmentation of Napara PWSS, JJM under RCFA Division-I PHE Dte. 6 (Six) Months. Assistant Engineer 2 ORD/001065/2023-2024 683/RCD-I 29/02/2024 180 NATIONAL CONSTRUCTION 2.21 0.00 0 0
2 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division NAPARA PIPED WATER SUPPLY SCHEME. , SM/11932 New Quotation for Napara W/S Scheme, P.H. No - 1, Gopalpur CCC BILL/00177/2022-2023 BP-2022-23-329 15/03/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 7.02 0.00 0 0
3 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division NAPARA PIPED WATER SUPPLY SCHEME. , SM/11932 New Quotation for Napara W/S Scheme, P.H. No - 02, Gopalpur CCC BILL/00178/2022-2023 BP-2022-23-330 15/03/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 4.80 0.00 0 0
4 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division NAPARA PIPED WATER SUPPLY SCHEME. , SM/11932 New Continuation order for Acceptance cum formal order for the work of Hiring of LUXURY Diesel Ambassador Car including higher model 2012 onwards of Diesel Ambassador or equivalent for official use (Inspection Vehicle) of Assistant Engineer for the office of the Executive Engineer ,Durgapur Water Supply Division, Public Health Engineering (w.e.f 01.09.2023 to 29.02.2024). (Sl-01) ORD/000174/2023-2024 1397/DWSD 17/08/2023 180 BIPLAB BANERJEE 0.82 0.60 73.17 30
5 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division NAPARA PIPED WATER SUPPLY SCHEME. , SM/11932 New Formal order for the work of laying distribution system, Rising main construction of 350 M3 Over Head Reservoir with 20 Mtr staging height including soil investigation ,construction of Pump House (5.4X3.6mtr) with Sanitary and water supply arrangement & construction of Pump house (3.6X3.00 m) with FHTC for NAPARA piped W/s Scheme under DWSD,PHE Dte ,Dist.-Paschim Bardhhaman. ORD/000221/2022-2023 1174/DWSD 02/08/2022 12 SK. ALIM 522.15 514.40 98.52 100
6 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division NAPARA PIPED WATER SUPPLY SCHEME. , SM/11932 New Acceptance cum formal order for the work of Sinking of 2 Nos tube well 250 mm X 150 mm tube well 120 mtr depth by Direct rotary Rig method using PVC pipe and prepacked resin bonded gravel filter for Napara piped W/s Scheme under DWSD ,PHE Dte (SL-08) ORD/000230/2022-2023 1255/DWSD 23/08/2022 15 SK. ALIM 14.76 14.73 99.8 0
7 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division NAPARA PIPED WATER SUPPLY SCHEME. , SM/11932 New Continuation order for Acceptance cum formal order for the work of Hiring of LUXURY Diesel Ambassador Car including higher model 2012 onwards of Diesel Ambassador or equivalent for official use (Inspection Vehicle) of Assistant Engineer for the office of the Executive Engineer ,Durgapur Water Supply Division, Public Health Engineering (w.e.f 01.03.2023 to 31.08.2023). (Sl-01) ORD/000502/2022-2023 134/DWSD 31/01/2023 180 BIPLAB BANERJEE 0.82 2.40 292.68 80
8 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division NAPARA PIPED WATER SUPPLY SCHEME. , SM/11932 New Acceptance cum formal order for the work of Dismantling of concrete road for laying distribution system rising main construction of 350 M3 reservoir with 20 mtr staging height including soil investigation construction of pump house (5.40 X 3.60 m) with sanitary and construction of pump house 3.60 X 3.00 m) for Napara piped W/s Scheme under DWSD ,PHE Dte ORD/000570/2022-2023 489/DWSD 23/03/2023 20 SK. ABDUL HALIM 4.39 4.39 100 0
9 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division NAPARA PIPED WATER SUPPLY SCHEME. , SM/11932 New Material Requisition To Resource Division RTOR000005/2023-2024 789/DWSD 25/05/2023 Resource Division 47.90 0.00 0 0
Total 604.87 536.51 88.7