Sl No. | District
As per Census (2011)
|
Block
As per Census (2011)
|
Division
Working Divisions
|
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
|
Scheme Category
Category of Scheme as per PHED-MIS
|
Work Name
Name of the Work as per the Issued Work Order
|
Name of AE entrusted | Name of JE entrusted | System Order No.
System Order Number
|
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
|
WO Date
Date of Issuance of Work Order
|
Days of Completion
Target Days for Work Completion as per PHED-MIS
|
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
|
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
|
Payment
Amount of Payment made for this Work Order as per PHED-MIS
|
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
|
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
|
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
9 | 604.87 | 536.52 | 88.7 | ||||||||||||||
1 | PASCHIM BARDHAMAN | Kanksa | RCFA Division -I | NAPARA PIPED WATER SUPPLY SCHEME. , SM/11932 | New | Acceptance cum work order for Trial run & special Maintenance of Rising main & Distribution system with operating of valve within command area under Augmentation of Napara PWSS, JJM under RCFA Division-I PHE Dte. 6 (Six) Months. | Assistant Engineer 2 | ORD/001065/2023-2024 | 683/RCD-I | 29/02/2024 | 180 | NATIONAL CONSTRUCTION | 2.21 | 0.00 | 0 | 0 | |
2 | PASCHIM BARDHAMAN | Kanksa | Durgapur W/S Division | NAPARA PIPED WATER SUPPLY SCHEME. , SM/11932 | New | Quotation for Napara W/S Scheme, P.H. No - 1, Gopalpur CCC | BILL/00177/2022-2023 | BP-2022-23-329 | 15/03/2023 | WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED | 7.02 | 0.00 | 0 | 0 | |||
3 | PASCHIM BARDHAMAN | Kanksa | Durgapur W/S Division | NAPARA PIPED WATER SUPPLY SCHEME. , SM/11932 | New | Quotation for Napara W/S Scheme, P.H. No - 02, Gopalpur CCC | BILL/00178/2022-2023 | BP-2022-23-330 | 15/03/2023 | WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED | 4.80 | 0.00 | 0 | 0 | |||
4 | PASCHIM BARDHAMAN | Kanksa | Durgapur W/S Division | NAPARA PIPED WATER SUPPLY SCHEME. , SM/11932 | New | Continuation order for Acceptance cum formal order for the work of Hiring of LUXURY Diesel Ambassador Car including higher model 2012 onwards of Diesel Ambassador or equivalent for official use (Inspection Vehicle) of Assistant Engineer for the office of the Executive Engineer ,Durgapur Water Supply Division, Public Health Engineering (w.e.f 01.09.2023 to 29.02.2024). (Sl-01) | ORD/000174/2023-2024 | 1397/DWSD | 17/08/2023 | 180 | BIPLAB BANERJEE | 0.82 | 0.60 | 73.17 | 30 | ||
5 | PASCHIM BARDHAMAN | Kanksa | Durgapur W/S Division | NAPARA PIPED WATER SUPPLY SCHEME. , SM/11932 | New | Formal order for the work of laying distribution system, Rising main construction of 350 M3 Over Head Reservoir with 20 Mtr staging height including soil investigation ,construction of Pump House (5.4X3.6mtr) with Sanitary and water supply arrangement & construction of Pump house (3.6X3.00 m) with FHTC for NAPARA piped W/s Scheme under DWSD,PHE Dte ,Dist.-Paschim Bardhhaman. | ORD/000221/2022-2023 | 1174/DWSD | 02/08/2022 | 12 | SK. ALIM | 522.15 | 514.40 | 98.52 | 100 | ||
6 | PASCHIM BARDHAMAN | Kanksa | Durgapur W/S Division | NAPARA PIPED WATER SUPPLY SCHEME. , SM/11932 | New | Acceptance cum formal order for the work of Sinking of 2 Nos tube well 250 mm X 150 mm tube well 120 mtr depth by Direct rotary Rig method using PVC pipe and prepacked resin bonded gravel filter for Napara piped W/s Scheme under DWSD ,PHE Dte (SL-08) | ORD/000230/2022-2023 | 1255/DWSD | 23/08/2022 | 15 | SK. ALIM | 14.76 | 14.73 | 99.8 | 0 | ||
7 | PASCHIM BARDHAMAN | Kanksa | Durgapur W/S Division | NAPARA PIPED WATER SUPPLY SCHEME. , SM/11932 | New | Continuation order for Acceptance cum formal order for the work of Hiring of LUXURY Diesel Ambassador Car including higher model 2012 onwards of Diesel Ambassador or equivalent for official use (Inspection Vehicle) of Assistant Engineer for the office of the Executive Engineer ,Durgapur Water Supply Division, Public Health Engineering (w.e.f 01.03.2023 to 31.08.2023). (Sl-01) | ORD/000502/2022-2023 | 134/DWSD | 31/01/2023 | 180 | BIPLAB BANERJEE | 0.82 | 2.40 | 292.68 | 80 | ||
8 | PASCHIM BARDHAMAN | Kanksa | Durgapur W/S Division | NAPARA PIPED WATER SUPPLY SCHEME. , SM/11932 | New | Acceptance cum formal order for the work of Dismantling of concrete road for laying distribution system rising main construction of 350 M3 reservoir with 20 mtr staging height including soil investigation construction of pump house (5.40 X 3.60 m) with sanitary and construction of pump house 3.60 X 3.00 m) for Napara piped W/s Scheme under DWSD ,PHE Dte | ORD/000570/2022-2023 | 489/DWSD | 23/03/2023 | 20 | SK. ABDUL HALIM | 4.39 | 4.39 | 100 | 0 | ||
9 | PASCHIM BARDHAMAN | Kanksa | Durgapur W/S Division | NAPARA PIPED WATER SUPPLY SCHEME. , SM/11932 | New | Material Requisition To Resource Division | RTOR000005/2023-2024 | 789/DWSD | 25/05/2023 | Resource Division | 47.90 | 0.00 | 0 | 0 | |||
Total | 604.87 | 536.51 | 88.7 |