Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
43 2,536.93 1,672.08 65.91  
1 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Acceptance cum work order for Additional work for laying MS pipe and allied works including Adopting trench less technology (e.g. jack Pushing Method etc) for crossing of NH-60 near Pandabeswar H/W Site to carry 350 mm dia distribution & 250 mm dia rising main pipe line under RCFA Part-III Zone-I under RCFA Division-I PHE Dte. Assistant Engineer 3 ORD/000018/2024-2025 1521/RCD-I 14/06/2024 45 HIRANMAY GHOSH 14.09 0.00 0 0
2 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Acceptance cum work order for Sinking of 4 (Four) nos 200 mm dia Horizontal River Bed Tube Well with fitting of 200 mm dia Strainer (12.2 mtr) in river Ajay & Collecting line under RCFA Part-III Zone-I Water Supply Scheme under RCFA Division-I PHE Dte. Assistant Engineer 3 ORD/000020/2024-2025 1523/RCD-I 14/06/2024 45 T M CONCRETE CREATION PVT.LTD 14.42 0.00 0 0
3 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Acceptance cum work order for Balance work of Laying & Pushing of 600 mm dia RCC (NP3) Hume pipe by adopting trench less technology (e.g. Jack Pushing Method etc) at Dhunabaid of Dendua for distribution system within command area of Zone-I (Dendua OHR Site) under RCFA, Division-1,P.H.E.Dte. Assistant Engineer 2 ORD/000104/2024-2025 2124/RCD-I 27/08/2024 30 DAS & CHAKRABORTY 12.70 0.00 0 0
4 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Acceptance cum Work Order for Laying & pushing of 600 mm dia RCC hume pipe (NP3) by adopting trench less technology (e.g. Jack Pushing Method) MS water carrier pipe and other allied works under command area of Tetikhola (Part-E) under Tetikhola Piped Water Supply Scheme, Block ¿ Durgapur-Faridpur, Dist-Paschim Bardhaman Assistant Engineer 1,Assistant Engineer 2 Junior Engineer 11,Junior Engineer 7 ORD/001141/2023-2024 940/RCD-I 15/03/2024 15 TARA CONSTRUCTION 9.51 0.00 0 0
5 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Acceptance cum work order for Repairing and renovation of Laudoha OHR site at Laudoha under RCFA Part-III Water Supply Scheme within Durgapur Faridpur Block under RCFA Division-I PHE Dte. Assistant Engineer 3 Junior Engineer ORD/001209/2023-2024 1021/RCD-I 16/03/2024 45 M/S A G CONSTRUCTION 8.87 4.42 49.83 100
6 PASCHIM BARDHAMAN RCFA Division -I Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Acceptance cum work order for Repairing and renovation ofn Pansiuli OHR site under RCFA Part-III Water Supply Scheme within Durgapur Faridpur Block under RCFA Division-I PHE Dte. Assistant Engineer 3 ORD/001222/2023-2024 1022/RCD-I 16/03/2024 45 SHWET BARANI 13.30 0.00 0 0
7 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Acceptance cum formal order for the work of Additional work for rest portion UPVC pipe line and FHTC at Benabandhi (JL-11) and Maheshpur(JL-12) mouza under Augmentaiton of RAFA Part-III Zone-I piped W/S Scheme under DWSD,PHE Dte ORD/000033/2023-2024 739/DWSD 22/05/2023 60 KIRON ENTERPRISE 51.72 48.44 93.66 100
8 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Acceptance cum formal order for the work of Additional work at RCC OHR site at NUTANDANGA under Augmentation of RCFA Part-III (Zone-I) Piped W/s Scheme under DWSD,PHE Dte ORD/000041/2023-2024 766/DWSD 22/05/2023 15 M/S PROCHESTA ENTERPRISE 4.49 4.48 99.78 100
9 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Acceptance cum formal order for the work of Urgent Repairing of 250 dia pipe line with necessary alid works at Nabaghanapur to Jhanjra Project Portion under Augmentation 0f RCFA ,Pt-III, Zone -I W/S Scheme (JJM) Under Durgapur Water Supply Division, P.H.E. Dte. (Sl-02) ORD/000054/2023-2024 838/DWSD 05/06/2023 15 RUBY CONSTRUCTION 0.75 0.00 0 100
10 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Acceptance cum formal order for the work of Providing FHTC work at Rangamati Mouza(JL-10) under Augmentation of RCFA Part-III(Zone-I) piped W/S Scheme under DWSD,PHE Dte (SM/11454) ORD/000069/2023-2024 1066/DWSD 12/07/2023 30 BASANTI TRADERS 18.67 5.84 31.28 50
11 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Additioinal work for rest portion UPVC pipe line at Rangamati mouza under Augmentation of RCFA Part-III(Zone-I) piped W/S Scheme under DWSD,PHE Dte (SM/11454) ORD/000084/2023-2024 1073/DWSD 12/07/2023 25 BASANTI TRADERS 9.56 3.27 34.21 100
12 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Continuation order for the work of Hiring of LUXURY Diesel Ambassador Car including higher model 2012 onwards of Diesel Ambassador or equivalent for official use (Inspection Vehicle for site vigit against JJM related scheme) for the office of the Executive Engineer ,Durgapur Water Supply Division, Public Health Engineering (w.e.f 01.07.2023 to 31.12.2023).(Sl-01) ORD/000102/2023-2024 944/DWSD 28/06/2023 180 PRAMIT CHATTERJEE 0.82 1.98 241.46 100
13 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Acceptance cum formal order for the work of Surging of 03 Nos river bed tube wells (No - 3,4,5 Ext) to combat drought like situation at Pansuili head work site under Augmentation of RCFA,Part-III (Zone-I) W/S Scheme (JJM) under Durgapur Water Supply Division , PHE Dte. (Sl-01) ORD/000105/2023-2024 04/SPOT/DWSD 16/06/2023 4 KARMAKAR CONSTRUCTION 1.00 1.00 100 100
14 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Acceptance cum formal order for the work of Surging of 03 Nos river bed tube wells (No - 7,9,10 Ext) to combat drought like situation at Pansuili head work site under Augmentation of RCFA,Part-III (Zone-I) W/S Scheme (JJM) under Durgapur Water Supply Division , PHE Dte. (Sl-03) ORD/000117/2023-2024 06/SPOT/DWSD 16/06/2023 4 KARMAKAR CONSTRUCTION 1.00 1.00 100 100
15 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Acceptance cum formal order for the work of Surging of 03 Nos river bed tube wells (No - 16,17,18 Ext ) to combat drought like situation at Pansiuli head work site under Augmentation of RCFA,Part-III (Zone-I) W/S Scheme (JJM) under Durgapur Water Supply Division , PHE Dte. (Sl-02) ORD/000127/2023-2024 11/SPOT/DWSD 16/06/2023 4 KARMAKAR CONSTRUCTION 1.00 1.00 100 100
16 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Acceptance cum formal order for the work of Surging of 03 Nos river bed tube wells (No -11,12 Ext & 4 New ) to combat drought like situation at Pansuili head work site under Augmentation of RCFA,Part-III (Zone-I) W/S Scheme (JJM) under Durgapur Water Supply Division , PHE Dte. (Sl-03) ORD/000128/2023-2024 12/SPOT/DWSD 16/06/2023 4 KARMAKAR CONSTRUCTION 1.00 1.00 100 100
17 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Acceptance cum formal order for the work of Surging of 03 Nos river bed tube wells (No -10,13 Ext & 14 New ) to combat drought like situation at Pansuili head work site under Augmentation of RCFA,Part-III (Zone-I) W/S Scheme (JJM) under Durgapur Water Supply Division , PHE Dte. (Sl-04) ORD/000129/2023-2024 13/SPOT/DWSD 16/06/2023 4 KARMAKAR CONSTRUCTION 1.00 1.00 100 100
18 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Acceptance cum formal order for the work of Additional Wash out work for 200 mm dia River Bed Tube Wells in River Ajoy at PANSULI Head Works Site under Augmentation of RCFA, Pt-III, Zone - I Part -A Water Supply Scheme under DWSE, PHE Dte. (Sl-05) ORD/000130/2023-2024 14/SPOT/DWSD 16/06/2023 7 AMARANJALI CONSTRUCTION 0.61 0.00 0 0
19 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Acceptance cum formal order for the work of Instalation of Water Level Indicater at Loudoha head work site under RCFA,Part-III ,Zone -I W/S Scheme (JJM) under Durgapur Water Supply Division , PHE Dte. (Sl-07) ORD/000132/2023-2024 16/SPOT/DWSD 16/06/2023 7 KARMAKAR CONSTRUCTION 0.77 0.77 100 100
20 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Acceptance cum formal order for the work of Surging of 03 Nos river bed tube wells (No - 1,3,4 Ext) to combat drought like situation at Pansuili head work site under Augmentation of RCFA,Part-III (Zone-I) W/S Scheme (JJM) under Durgapur Water Supply Division , PHE Dte. (Sl-01) ORD/000137/2023-2024 1254/DWSD 02/08/2023 10 KARMAKAR CONSTRUCTION 1.00 1.00 100 100
21 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Acceptance cum formal order for the work of Drawing ,design and surveying work for proposed piped W/s Scheme of Sarpi W/S Scheme under DWSD, PHE Dte(SL-02) ORD/000154/2022-2023 1022/DWSD 04/07/2022 10 APEX ENGINEERING 4.09 4.09 100 100
22 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Formal order for the work of Supplying and laying of different dia UPVC pipe line with necessary allied works at Rangamatia (JL-10),Benebandhi(JL-11) Maheshpur(JL-12) Mouza of Augmentation of RCFA Part-III Piped W/s Scheme (Zone-I) (Part-B) W/s Scheme under DWSD,PHE Dte (SL-07) ORD/000180/2022-2023 874/DWSD 26/05/2022 25 BASANTI TRADERS 22.24 18.46 83 0
23 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Formal order for the work of Construction of 150 M3 capacity 20 mtr staging height RCC over Head Reservoir (OHR) at Nutandanga under Augmentation of RCFA Part-III W/s Scheme (Zone-I/Part-B) under DWSD, PHE Dte (SL-13) ORD/000181/2022-2023 875/DWSD 26/05/2022 184 M/S PROCHESTA ENTERPRISE 64.33 56.33 87.56 0
24 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Acceptance cum formal order for the work of Preparation and Submission of DPR for Augmentation of RCFA Part - III Zone - I (PART - B) under Durgapur Faridpur Block under Durgapur Water Supply Division, P.H.E Dte. (Sl No - 03) ORD/000184/2023-2024 1201/DWSD 27/07/2023 7 MEASURE LAND 0.78 0.78 100 100
25 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Formal order for the work of Construction of 500 M3 capacity 20 mtr staging height RCC Over Head Reservoir (OHR) at Mohal under Augmentation of RCFA Part-III (Zone-I/Part-B) W/s Scheme under DWSD, PHE Dte (SL_14) ORD/000207/2022-2023 278/DWSD 16/05/2022 184 RANJIB GHATAK 96.93 82.66 85.28 85
26 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Formal order for the work of Sinking of 4 Nos 200 mm dia river bed tube wells with collecting main in river Ajoy at Pansuili H/W under Augmentation of RCFA Part-III(Zone-I)(Part-B) W/S Scheme under DWSD,PHE Dte. (SL_09) ORD/000208/2022-2023 856/DWSD 24/05/2022 10 RANAJOY ENTERPRISE 19.57 10.54 53.86 100
27 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Formal order for the work of of Sinking of 4 Nos 200 mm dia river bed tube wells with collecting main in river Ajoy at Pansuili H/W under Augmentation of RCFA Part-III(Zone-I)(Part-A) W/S Scheme under DWSD,PHE Dte. (SL_15) ORD/000209/2022-2023 857/DWSD 24/05/2022 15 RANAJOY ENTERPRISE 18.48 10.37 56.11 100
28 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Acceptance cum formal order for the work of Supplying and laying of different dia UPVC pipe line with necessary allied works at Rangamatia (JL-10),Benebandhi(JL-11) ,Maheshpur(JL-12) mouza of Augmentation of RCFA Part-III W/s Scheme (Zone-I)/Part-A) W/S Scheme under DWSD,PHE Dte.(SL-02) ORD/000266/2022-2023 1005/DWSD 28/06/2022 15 KIRON ENTERPRISE 19.46 16.77 86.18 85
29 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Continuation order for the work of Hiring of LUXURY Diesel Ambassador Car including higher model 2012 onwards of Diesel Ambassador or equivalent for official use (Inspection Vehicle for site visit against JJM related scheme) for the office of the Executive Engineer ,Durgapur Water Supply Division, Public Health Engineering (w.e.f 01.01.2024 to 10.01.2024).(S l-01) Assistant Engineer-I,Assistant Engineer-II JUNIOR ENGINEER-1,JUNIOR ENGINEER-2,Junior Engineer_3 ORD/000293/2023-2024 1923/DWSD 29/01/2024 10 PRAMIT CHATTERJEE 0.05 0.00 0 0
30 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Acceptance cum formal work order for the work of Withdrawing existing damaged 150 mm dia AC pipe line and laying 160 mm dia (OD) HDPE pipe in the same trench from Madhaiganj OHR site towards Rangamati village under RCFA Pt-III W/S Scheme under DWSD, PHE Dte (SL-24) ORD/000350/2020-2021 69/DWSD 13/01/2021 15 KARMAKAR CONSTRUCTION 2.31 2.31 100 0
31 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Acceptance cum formal order for the work of Laying of CI Pipe line ,sluice valves ,UPVC pipe line and allied works at Madhaiganj H/W Site under Modified RCFA Part-III W/s Scheme under DWSD, PHE Dte (SL-03) ORD/000358/2021-2022 75/DWSD 21/01/2022 15 KARMAKAR CONSTRUCTION 2.57 2.50 97.28 0
32 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Formal order for the work of Augmentation at Natundanga of RCFA Part-III (Zone--I/A) piped W/s Scheme including laying distribution network (LDS) and functinal household tap connection (FHTC) under Durgapur W/s Division, PHE Dte ,Block-Durgapur-Faridpur ,Dist-Paschim Bardhaman (SL-02) ORD/000372/2022-2023 1778/DWSD 23/12/2022 184 ALOK ENTERPRISE 634.56 276.98 43.65 75
33 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Formal order for the work of Augmentation of RCFA Part-III )Zone-I/Part-B) piped W/s Scheme by construction of 250 M3 RCC OHR of 20 mtr staging height with necessary interconnection soil investigation including laying distribution network and Functional House Tap Connection (FHTC) under DWSD,PHE Dte ,Block-Durgapur-Faridpur,Dist-Paschim Bardhhaman (Sl-01 ORD/000373/2022-2023 1779/DWSD 23/12/2022 12 UMWELT ENGINEER PVT LTD 919.36 839.98 91.37 90
34 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Formal order for the work of augmentation at Madhaiganj of RCFA Part-III (Zone-I/C) piped W/s Scheme including laying distribution network and functional household tap connection (FHTC) under Durgapur W/S Division, PHE Dte Block-Durgapur-Faridpur ,Dist.-Paschim Bardhhaman. ORD/000380/2022-2023 05/DWSD 02/01/2023 120 IJABUL SEKH 279.99 236.03 84.3 75
35 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Acceptance cum formal order for the work of Hiring of LUXURY Diesel Ambassador Car including higher model 2012 onwards of Diesel Ambassador or equivalent for official use (Inspection Vehicle for site vigit against JJM related scheme) for the office of the Executive Engineer ,Durgapur Water Supply Division, Public Health Engineering (w.e.f 01.01.2023 to 30.06.2023).(Sl-01) ORD/000438/2022-2023 1801/DWSD 30/12/2022 180 PRAMIT CHATTERJEE 0.82 0.80 97.56 0
36 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Continuation order for the work of extension of pipe line from the existing pipe line from command area of Gourbazar-Ichhapur piped W/s Scheme of Ichhapur area fro providing of FHTC at Ichhapur mouza(JL-50) under DWSD ,PHE Dte ORD/000476/2021-2022 192/DWSD 15/02/2022 15 SHWET BARANI 4.45 1.84 41.35 100
37 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Laying additional distribution pipeline with necessary allied works for providing FHTC work under Durgapur-Faridpur Block of Augmentation of RCFA Part-III W/s Scheme (Zone-I) under DWSD,PHE Dte ORD/000666/2022-2023 1146/DWSD. 04/07/2022 20 SHWET BARANI 5.69 5.64 99.12 100
38 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Material Requisition To Resource Division RTOR000001/2022-2023 1228/DWSD 17/08/2022 Resource Division 87.20 0.00 0 0
39 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Material Requisition To Resource Division RTOR000005/2022-2023 1377/DWSD 22/09/2022 Resource Division 61.60 0.00 0 0
40 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Material Requisition To Resource Division RTOR000011/2022-2023 255/A/DWSD 15/02/2023 Resource Division 30.80 0.00 0 0
41 PASCHIM BARDHAMAN Durgapur W/S Division Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Material Requisition To Resource Division RTOR000012/2022-2023 256/DWSD 15/02/2023 Resource Division 61.60 0.00 0 0
42 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Quotation for natundanga O.H.R. under RCFA-III(Zone-I) Water supply scheme. BILL/00481/2024-2025 null 03/09/2024 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.09 0.00 0 null
43 PASCHIM BARDHAMAN Asansol Mechanical Augmentation of RCFA (PART-lll) Zone-l Piped water supply scheme (Complying JJM) , SM/11454 Augmentation Providing And Installation of Submersible pumping Machineries, PDB-Cum-MCC Panel and other Electro-Mechanical accessories at Head Works site at Pansuli under Augmentation of RCFA Part-III (Zone-I) Water Supply Scheme, Block-Faridpur-Durgapur, Dist.-Paschim Bardhaman. Assistant Engineer-II Junior Engineer-5 ORD/000392/2022-2023 252/AMD 02/02/2023 30 INDUSTRIAL ELECTRICAL CORPORATION 33.68 30.80 91.45 0
Total 2,536.90 1,672.05 65.91