Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 244.24 174.14 71.3  
1 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division DANDESHWAR PIPED WATER SUPPLY SCHEME. , SM/11282 New New service connection charges for Dandeswar piped Water supply scheme TW-I BILL/00062/2023-2024 BP-2023-24-37 01/06/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.62 0.00 0 0
2 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division DANDESHWAR PIPED WATER SUPPLY SCHEME. , SM/11282 New Electricity service charges for Kanchanpur TW-III under Kanksa block of Dandeswar piped W/s Scheme BILL/00158/2023-2024 BP-2023-24-99 24/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 2.67 0.00 0 0
3 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division DANDESHWAR PIPED WATER SUPPLY SCHEME. , SM/11282 New Electricity service charges for Dandeswar TW-II under Dandeswar piped W/s Scheme BILL/00159/2023-2024 BP-2023-24-100 24/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 2.83 0.00 0 0
4 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division DANDESHWAR PIPED WATER SUPPLY SCHEME. , SM/11282 New 1 (One) No Trial bore by DR method using rig machine at Dwandeswar ,Block-Kanksa under Augmentation of Dandeswar PWSS under DWSD,PHE Dte ORD/000214/2023-2024 1446/DWSD 25/08/2023 15 M/S BADAL GHOSH 1.00 1.00 100 100
5 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division DANDESHWAR PIPED WATER SUPPLY SCHEME. , SM/11282 New Acceptance cum formal order for the work Sinking of 2 Nos tube well 250 mm X 150 mm tube well 120 mtr depth by Direct rotary Rig method using PVC pipe and prepacked resin bonded gravel filter for Dandeswar piped W/s Scheme under DWSD ,PHE Dte (SL-03) ORD/000224/2022-2023 1240/DWSD 18/08/2022 15 M/S BADAL GHOSH 14.75 13.30 90.17 0
6 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division DANDESHWAR PIPED WATER SUPPLY SCHEME. , SM/11282 New Formal order for the work of laying distribution system rising main construction of 150 M3 reservoir with 20 mtrs staging height including soil investigation construction of Pump house (5.4 m X 3.60 m) with sanitary and water supply arrangement and construction of pump house(3.60 X 3.00 m) with FHTC for Dandeswar water Supply schme under DWSD ,PHE Dte (NS) ORD/000264/2022-2023 1614/DWSD 21/11/2022 360 POWER TOOLS AND ENGINEERING 164.79 139.27 84.51 80
7 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division DANDESHWAR PIPED WATER SUPPLY SCHEME. , SM/11282 New Acceptance cum formal order for the work of Construction of 5.40 X3.60 mtr switch room with plinth height (600X 2000 mm) with sanitary and water supply arrangement at PH No-2 TW No-2 site at Akandara under Jemua piped W/S Scheme under DWSD ,PHE Dte ORD/000514/2022-2023 331/DWSD 20/02/2023 20 MOTIONMASS TECHNO (OPC) PVT LTD 6.89 0.00 0 100
8 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division DANDESHWAR PIPED WATER SUPPLY SCHEME. , SM/11282 New Material Requisition To Resource Division RTOR000003/2022-2023 1229/DWSD 17/08/2022 Resource Division 25.24 0.00 0 0
9 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division DANDESHWAR PIPED WATER SUPPLY SCHEME. , SM/11282 New Material Requisition To Resource Division RTOR000006/2022-2023 255/B/DWSD 15/02/2023 Resource Division 4.24 0.00 0 0
10 PASCHIM BARDHAMAN Kanksa Central Mechanical DANDESHWAR PIPED WATER SUPPLY SCHEME. , SM/11282 New Supply & Installation of Submersible Pumping Machinery , Voltage Stabilizer, Chlorination system and internal House wiring for Tube well no.- 1 & 2 at Dandeshwar Water Supply Scheme under CMD, PHE Dte., Dist.- Paschim-Bardhaman. ASSISTANT ENGINEER Junior Engineer ORD/000008/2023-2024 1654/CMD 06/04/2023 30 P.K. ENGINEERING 21.21 20.57 96.98 80
Total 244.23 174.14 71.3