Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
7 595.32 522.45 87.76  
1 PASCHIM BARDHAMAN Kanksa RCFA Division -I BIRUDIHA PIPED WATER SUPPLY SCHEME , SM/11224 New Acceptance cum Work Order for Trial run & special Maintenance of Rising main & Distribution system with operating of valve within command area under Augmentation of Birudiha PWSS, JJM under RCFA Division-I PHE Dte. 6(Six) Months. Assistant Engineer 2,Assistant Engineer 3 Junior Engineer 7 ORD/001063/2023-2024 682/RCD-I 29/02/2024 180 M/S KONAR ENGINEERING 1.81 0.00 0 0
2 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division BIRUDIHA PIPED WATER SUPPLY SCHEME , SM/11224 New Quotation money for new electric service connection at Birudiha under Birudiha piped W/s Scheme. BILL/00063/2023-2024 BP-2023-24-38 01/06/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 0.29 0.00 0 0
3 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division BIRUDIHA PIPED WATER SUPPLY SCHEME , SM/11224 New New service connection charges for birudiha Water Supply scheme (TW-2) BILL/00148/2023-2024 BP-2023-24-89 17/07/2023 WEST BENGAL STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED 2.27 0.00 0 0
4 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division BIRUDIHA PIPED WATER SUPPLY SCHEME , SM/11224 New Dismantling of concrete road and bituminiou road and land development for constrution of 250 M3 OHR of 20 mtr staging height as per Deptt drawing ,laying alingining of rising main and provding FHTC connection of all mouzas under command area of Birudiha piped W/s Scheme under DWSD ,PHE Dte ORD/000087/2023-2024 722/DWSD 11/05/2023 25 M/S K.B.CONSTRUCTION 30.05 9.93 33.04 100
5 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division BIRUDIHA PIPED WATER SUPPLY SCHEME , SM/11224 New Acceptance cum formal order for the work of Sinking of 2 Nos tube well 250 mm X 150 mm tube well 120 mtr depth by Direct rotary Rig method using PVC pipe and prepacked resin bonded gravel filter for Birudiha piped W/s Scheme under DWSD ,PHE Dte (SL-04) ORD/000225/2022-2023 1241/DWSD 18/08/2022 15 MD AAMIR KHAN 14.75 14.30 96.95 0
6 PASCHIM BARDHAMAN Kanksa Durgapur W/S Division BIRUDIHA PIPED WATER SUPPLY SCHEME , SM/11224 New Formal order for the work of laying distribution system ,Rising main ,constrcution of 250 M3 Reservoir with 20 mtr staing height including soil inverstigation ,construction of Pump house (5.4X3.60) with sanitary and Water supply arrangement and construction of Pump house (3.60 X 3.00 m) wiht FHTC for Birudiha piped W/s Scheme under DWSD ,PHE Dte (New Scheme). ORD/000250/2022-2023 1437/DWSD 13/10/2022 360 KHAN ENTERPRISE 524.96 477.66 90.99 85
7 PASCHIM BARDHAMAN Kanksa Central Mechanical BIRUDIHA PIPED WATER SUPPLY SCHEME , SM/11224 New Supply & Installation of Submersible Pumping Machinery, Voltages Stabilizer , Chlorination system and internal House wiring for Tube well for Tube well no:- 1 & 2 at Birudiha water supply scheme under CMD PHE Dte, Dist: Paschim Bardhaman. Driller In-Charge Junior Engineer ORD/000011/2023-2024 1657/CMD 06/04/2023 30 MAA TARA ENTERPRISE 21.19 20.56 97.03 100
Total 595.34 522.45 87.76