Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
18 737.61 337.87 45.81  
1 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART II (ZONE 4A) UNDER RCFA DIVISION-I PHE DTE. , SM/12219 Augmentation Formal work order for Distribution Network for Augmentation of RCFA Part-II Piped Water Supply Scheme including FHTC & allied work under RCFA Division-I PHE Dte. (Zone-4A) (Part-A). Assistant Engineer 2 Junior Engineer ORD/000041/2023-2024 1604/RCD I 25/04/2023 180 PINKI ENTERPRISE 115.02 55.73 48.45 65
2 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART II (ZONE 4A) UNDER RCFA DIVISION-I PHE DTE. , SM/12219 Augmentation Acceptance cum work order Distribution Network for Augmentation of RCFA Part-II Piped Water Supply Scheme including FHTC & allied work under RCFA Division-I PHE Dte. (Zone-4A) (Part-D) (Sl No. 14) Assistant Engineer 2 Junior Engineer ORD/000054/2023-2024 1707/ RCD I 03/05/2023 90 MD. JAWED KHAN 69.87 41.09 58.81 80
3 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART II (ZONE 4A) UNDER RCFA DIVISION-I PHE DTE. , SM/12219 Augmentation Laying of distribution system at Khottamdihi village including FHTC works under Kendra Khottamdihi W/S Scheme under RCFA Div-I, PHE dte. Assistant Engineer 2 Junior Engineer ORD/000399/2022-2023 2643/RCDI 28/10/2022 45 JAYANTA DATTA 100.00 0.00 0 80
4 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART II (ZONE 4A) UNDER RCFA DIVISION-I PHE DTE. , SM/12219 Augmentation Acceptance cum work order for Health assessment of existing OHR of ASTA (1135 Cum) and ancillary structures conducting Non-Destructive Test and thorough visual observation under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000531/2023-2024 3021/RCD-I 16/10/2023 15 SIRCON ENGINEERING SERVICES 4.98 2.49 50 100
5 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART II (ZONE 4A) UNDER RCFA DIVISION-I PHE DTE. , SM/12219 Augmentation Acceptance cum work order for Health assessment of existing OHR of Dendua(1135Cum) and ancillary structure sconducting Non-Destructive Test and thorough visual observation under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000532/2023-2024 3014/RCD-I 16/10/2023 15 SIRCON ENGINEERING SERVICES 4.98 2.49 50 100
6 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART II (ZONE 4A) UNDER RCFA DIVISION-I PHE DTE. , SM/12219 Augmentation Acceptance cum work order for Health assessment of existing OHR of Searsole (900 Cum) and ancillary structures conducting Non-Destructive Test and thorough visual observation under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000538/2023-2024 3024/RCD-1 16/10/2023 15 RISHAN ENGINEERING CONSULTANCY 4.95 2.48 50.1 100
7 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART II (ZONE 4A) UNDER RCFA DIVISION-I PHE DTE. , SM/12219 Augmentation Acceptance cum work order for Construction for Additional works of MS manifold including interconnection in beetween CWR and pump house and etc allied works at Samlya H/W under Samlya W/S Scheme under RCFA Division-I PHe Dte. Assistant Engineer 2 Junior Engineer ORD/000571/2023-2024 2869/RCD-I 06/10/2023 15 MAA ENTERPRISE 6.41 3.08 48.05 100
8 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART II (ZONE 4A) UNDER RCFA DIVISION-I PHE DTE. , SM/12219 Augmentation Acceptance cum work order for construction of Chlorine Room of Size (4.50 x 3.50 m) at (Zone-VII) of Salanpur Block for Improvement of RCFA Part-I Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District Paschim Bardhaman Assistant Engineer 2 Junior Engineer ORD/000657/2022-2023 356/RCDI 30/01/2023 15 DAS & SARKAR ENTERPRISE 4.60 1.89 41.09 100
9 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART II (ZONE 4A) UNDER RCFA DIVISION-I PHE DTE. , SM/12219 Augmentation Continuation work order for Providing FHTC through Retrofitting at Bhaluka & Sonepur Bazari under Kendra Khottamdih Water Supply Scheme under RCFA Division-I PHE Dte. under JJM (RCFA Part-II) Assistant Engineer 2 Junior Engineer ORD/000825/2022-2023 801/RCD-I 06/03/2023 30 MACHINO TECHNO 67.77 65.09 96.05 100
10 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART II (ZONE 4A) UNDER RCFA DIVISION-I PHE DTE. , SM/12219 Augmentation Acceptance cum work order Distribution Network for Augmentation of RCFA Part-II Piped Water Supply Scheme including FHTC & allied work under RCFA Division-I PHE Dte. (Zone-4A) (Part-C) Assistant Engineer 2 Junior Engineer ORD/000868/2022-2023 1118/RCD-I 23/03/2023 90 UNITED CONSTRUCTION 81.57 62.96 77.19 90
11 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART II (ZONE 4A) UNDER RCFA DIVISION-I PHE DTE. , SM/12219 Augmentation Acceptance cum work order Distribution Network for Augmentation of RCFA Part-II Piped Water Supply Scheme including FHTC & allied work under RCFA Division-I PHE Dte. (Zone-4A) (Part-E) Assistant Engineer 2 Junior Engineer ORD/000869/2022-2023 1120/RCD-I 23/03/2023 90 JAYANTA DATTA 91.65 10.18 11.11 40
12 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART II (ZONE 4A) UNDER RCFA DIVISION-I PHE DTE. , SM/12219 Augmentation Acceptance cum work order for Distribution Network for Augmentation of RCFA Part-II Piped Water Supply Scheme including FHTC & allied work under RCFA Division-I PHE Dte. (Zone-4A) (Part-B)(Sl No. 12) Assistant Engineer 2 Junior Engineer ORD/000870/2022-2023 1116/RCD-I 23/03/2023 90 BABA LOKNATH ENTERPRISE 71.02 39.87 56.14 80
13 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART II (ZONE 4A) UNDER RCFA DIVISION-I PHE DTE. , SM/12219 Augmentation Acceptance cum work order for Construction of Store Room at Head Works Site for (Zone-4A) of Pandabeswar and Andal Block for Augmentation of RCFA Part-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman. (Sl No. 29) Assistant Engineer 2 Junior Engineer ORD/000902/2022-2023 1173/RCD I 24/03/2023 90 RANJIB GHATAK 4.61 0.00 0 0
14 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART II (ZONE 4A) UNDER RCFA DIVISION-I PHE DTE. , SM/12219 Augmentation Acceptance cum work order for Construction of Chlorine Room (Size 4.1 m x 3.5 m out to out) at Shankarpur OHR Site for Augmentation of RCFA part-II (Zone-4A and 4B) Piped Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No. 27) Assistant Engineer 2 Junior Engineer ORD/000904/2022-2023 1171/RCD I 24/03/2023 90 RANJIB GHATAK 4.61 0.00 0 0
15 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART II (ZONE 4A) UNDER RCFA DIVISION-I PHE DTE. , SM/12219 Augmentation Acceptance cum work order for Approach road and others necessary allied works at Front Gate to village road for Shankarpur OHR Site (Zone-4A and 4B) Piped Water Supply Scheme under RCFA Division-I PHE Dte. (Sl No 28) Assistant Engineer 2 Junior Engineer,Junior Engineer 11 ORD/000908/2022-2023 1172/RCD I 24/03/2023 60 RANJIB GHATAK 3.78 3.70 97.88 0
16 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART II (ZONE 4A) UNDER RCFA DIVISION-I PHE DTE. , SM/12219 Augmentation Acceptance cum Work Order for Additional work for laying MS pipe and allied works including adopting trench less technology b(e.g. Jack Pushing Method etc) of 02 (Two) nos location at Sankarpur (near Footbal ground ) and Shankarpur GP office under Augmentation of RCFA Part-II (Zone-4A) PWSS (Part-C ) under RCFA Division-I PHE Dte. (2nd Call) Assistant Engineer 2 ORD/000913/2023-2024 213/RCD-I 29/01/2024 15 UNITED CONSTRUCTION 13.08 5.87 44.88 100
17 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART II (ZONE 4A) UNDER RCFA DIVISION-I PHE DTE. , SM/12219 Augmentation Acceptance cum Work Order for Allied work for bridge, road and other allied work at Amritnagar Zone-I under RCFA Part-II W/S Scheme under RCFA Division-I PHE Dte. Assistant Engineer 2 ORD/000965/2023-2024 508/RCD-I 12/02/2024 30 MACHINO TECHNO 81.93 40.95 49.98 100
18 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART II (ZONE 4A) UNDER RCFA DIVISION-I PHE DTE. , SM/12219 Augmentation Material Requisition To Resource Division RTOR000014/2023-2024 2934/RCD-I 11/10/2023 Resource Division 6.78 0.00 0 0
Total 737.60 337.86 45.8