Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 926.43 228.02 24.61  
1 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-15) UNDER RCFA DIVISION-I PHE DTE. , SM/12041 Augmentation Way leave / Track crossing proposal with application ID : ER-ASN-2024-WL-92 at Ukhra under Augmentation of RCFA Part-II (Zone-15) under RCFA Division-I PHE Dte BILL/00115/2024-2025 48/24-25 20/05/2024 EASTERN RAILWAY 16.46 0.00 0 0
2 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-15) UNDER RCFA DIVISION-I PHE DTE. , SM/12041 Augmentation Way leave track crossing proposal with application ID - ER-ASN-2024-WL-57 Payment of wayleave facility charges. BILL/00546/2024-2025 273/24-25 05/09/2024 EASTERN RAILWAY 9.09 0.00 0 null
3 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-15) UNDER RCFA DIVISION-I PHE DTE. , SM/12041 Augmentation Formal work order for Augmentation of RCFA Part-II Pipe Water Supply Scheme (Zone-15) with Construction of 450 cum capacity RCC OHR with 20 mtr with staging height including Boundary Walls with under Jamuria Block, District Paschim Bardhaman. Assistant Engineer 2 Junior Engineer ORD/000101/2023-2024 1843/RCD-I 31/05/2023 365 GITA CONSTRUCTION 150.65 0.00 0 0
4 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-15) UNDER RCFA DIVISION-I PHE DTE. , SM/12041 Augmentation Formal Work Order for Distribution Network for Augmentation of RCFA Part-II Piped Water Supply Scheme including FHTC & allied work under RCFA Division-I PHE Dte. (Zone-15) Assistant Engineer 2 Junior Engineer ORD/000254/2023-2024 2299/RCD-I 24/07/2023 180 SWATI CORPORATION 516.27 98.52 19.08 65
5 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-15) UNDER RCFA DIVISION-I PHE DTE. , SM/12041 Augmentation Supplying, fitting, fixing and fabrication of sign board including printing and carriage to different area with necessary allied works in connection with Improvement of RCFA Part-I Piped Water Supply Scheme under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000321/2023-2024 Camp-02-Sign-Board-AE-II 30/06/2023 20 UNITED CONSTRUCTION 17.51 15.83 90.41 70
6 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-15) UNDER RCFA DIVISION-I PHE DTE. , SM/12041 Augmentation Acceptance cum work order for Allied work for bridge at Chalbalpur in connection with the laying distribution system for Amritnagar Zone-II under Augmentation of RCFA Part-II (Zone-15) under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000514/2023-2024 2865/RCD-I 06/10/2023 90 MRITYUNJOY MUKHERJEE & CO. 70.40 52.84 75.06 100
7 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-15) UNDER RCFA DIVISION-I PHE DTE. , SM/12041 Augmentation Acceptance cum work order for Construction of CWR (Clear Water Reservoir) of capacity 100 cum & allied work at Bagdiha under Augmentation of RCFA Part-II (Zone-15) under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000520/2023-2024 2877/RCD-I 06/10/2023 90 M/S KALYANI ENTERPRISE 18.69 0.00 0 0
8 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-15) UNDER RCFA DIVISION-I PHE DTE. , SM/12041 Augmentation Sub Soil Investigation for 450 cum capacity RCC Over Head Reservoir at (Zone-15) of Jamuria Block for Augmentation of RCFA Part-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman Assistant Engineer 2 Junior Engineer ORD/000563/2022-2023 3357/RCDI 23/12/2022 7 MOYTEC 0.49 0.00 0 0
9 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-15) UNDER RCFA DIVISION-I PHE DTE. , SM/12041 Augmentation Formal work order for construction of CWR 150 cum, sub station building of H/W site, pump house, chlorine room and other allied work (Bank of Ajoy river) under Semalya water Supply Scheme under RCFA Div-I, PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000917/2022-2023 1216/RCDI 24/03/2023 120 SHILPA UDDOYG ENGINEERING CO-OP SOCIETY LTD. 120.09 60.83 50.65 40
10 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-15) UNDER RCFA DIVISION-I PHE DTE. , SM/12041 Augmentation Material Requisition To Resource Division RTOR000034/2023-2024 2940/RCD-I 11/10/2023 Resource Division 6.78 0.00 0 0
Total 926.43 228.03 24.61