Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 441.51 169.36 38.36  
1 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-12B) UNDER RCFA DIVISION-I PHE DTE. , SM/12031 Augmentation Acceptance cum Work Order for Additional work of allied items at Andal OHR Site under Phase-II/B under RCFA Division-I PHE Dte. AUGMENTATION PWSS OF RCFA PART-II (Zone-12B) Assistant Engineer 2 Junior Engineer ORD/000063/2024-2025 1647/RCD-I 04/07/2024 15 AMAR CONSTRUCTION 5.25 2.62 49.9 100
2 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-12B) UNDER RCFA DIVISION-I PHE DTE. , SM/12031 Augmentation Acceptance cum work order for Health assessment of existing OHR of Barabani (910 Cum) and ancillary structures conducting Non-Destructive Test and thorough visual observation under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000539/2023-2024 3018/RCD-I 16/10/2023 15 SIRCON ENGINEERING SERVICES 4.95 2.47 49.9 100
3 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-12B) UNDER RCFA DIVISION-I PHE DTE. , SM/12031 Augmentation Formal Work Order for Distribution network for RCFA Part-II piped Water Supply Scheme including FHTC & allied work under RCFA Div-I, PHE Dte.(Zone-12B)(Segment-2). Assistant Engineer 2 Junior Engineer ORD/000631/2022-2023 485/RCDI 03/02/2023 60 M/S SINGH & KONAR CONSTRUCTION 155.21 61.81 39.82 80
4 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-12B) UNDER RCFA DIVISION-I PHE DTE. , SM/12031 Augmentation Acceptance cum work order for Allied work of Distribution Network including FHTC & allied work at Ondal Block of RCFA Part-II (Zone-12 A) Piped Water Scheme under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000669/2023-2024 3436/RCD-1 24/11/2023 60 MRITYUNJOY MUKHERJEE & CO. 81.28 24.39 30.01 65
5 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-12B) UNDER RCFA DIVISION-I PHE DTE. , SM/12031 Augmentation Acceptance cum work order for Allied work Balance work of Road restoration in connection with laying distribution system to Accommodate FHTC and providing FHTC including supplying laying fittings fixing of 15 mm NB PVC pipe with all necessary work specials saddle piece etc. all complete for Augmentation of sub-surface water based PWSS for Amritnagar Zone-II under RCFA Division-I PHE Dte. Assistant Engineer 2 ORD/000941/2023-2024 500/RCD-I 12/02/2024 45 MRITYUNJOY MUKHERJEE & CO. 54.54 27.27 50 100
6 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-12B) UNDER RCFA DIVISION-I PHE DTE. , SM/12031 Augmentation Acceptance cum work order for Allied works of laying distribution system of balance work of supply & laying of HDPE pipe under Augmentation of sub-surface water based PWSS for Amritnagar Zone-II under RCFA Division-I PHE Dte. Assistant Engineer 2 ORD/000942/2023-2024 498/RCD-I 12/02/2024 45 MACHINO TECHNO 78.67 38.45 48.88 100
7 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-12B) UNDER RCFA DIVISION-I PHE DTE. , SM/12031 Augmentation Acceptance cum work order for Construction of restoration approach road in Amritnagar Zone-I for Augmentation of RCFA Part-II under RCFA Division-I PHE Dte. (Part-B) Assistant Engineer 2 Junior Engineer ORD/000948/2023-2024 499/RCDI 12/02/2024 30 MACHINO TECHNO 24.72 12.35 49.96 100
8 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-12B) UNDER RCFA DIVISION-I PHE DTE. , SM/12031 Augmentation Acceptance cum work order Additional work for supply and laying HDPE pipe instead of DI pipe for the work of laying distribution system under Augmentation of Amritnagar Zone-I under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer 12 ORD/000952/2023-2024 501/RCD-I 12/02/2024 45 M/S SINGH & KONAR CONSTRUCTION 30.11 0.00 0 0
9 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-12B) UNDER RCFA DIVISION-I PHE DTE. , SM/12031 Augmentation Material Requisition To Resource Division RTOR000029/2023-2024 2945/RCD-I 11/10/2023 Resource Division 6.78 0.00 0 0
Total 441.50 169.35 38.36