Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
16 542.7 218.3 40.22  
1 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-8) UNDER RCFA DIVISION-I PHE DTE. , SM/12028 Augmentation Acceptance cum work order for Augmentation of RCFA Part-II Piped Water Supply Scheme (Zone-8) with Construction of 250 cum capacity RCC OHR with 20 mtr with staging height including Boundary Walls with gates and land Development, Drain and internal pathway at OHR site under Jamuria Block, District Paschim Bardhaman, (Sl No. 07). Assistant Engineer 2 Junior Engineer ORD/000005/2023-2024 1402 RCD I 12/04/2023 365 PINKI ENTERPRISE 95.85 73.36 76.54 65
2 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-8) UNDER RCFA DIVISION-I PHE DTE. , SM/12028 Augmentation Acceptance cum work order Laying & Pushing of 600 mm dia RCC (NP3) Hume Pipe by adopting trench less technology (e.g. Jack Pushing Method etc) at 04 nos location (Bus stand/Taxi stand Domohani Bazar, Rural more, Near Domohani Electric Supply Office, BDO Office More) of Barabani Block under Improvement of RCFA Part-I (Zone-11, Part-6) PWSS under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000231/2023-2024 2229/RCD-I 17/07/2023 30 UMA ENTERPRISE 30.82 0.00 0 0
3 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-8) UNDER RCFA DIVISION-I PHE DTE. , SM/12028 Augmentation Acceptance cum work order Additional work for the laying of Distribution Network for Improvement RCFA Part-I Water Supply Scheme within command area of Zone-XI (Part-1 Distribution Segment) under RCFA Division-I PHE Dte. Assistant Engineer 1,Assistant Engineer 2 Junior Engineer ORD/000296/2023-2024 2367/RCD-I 04/08/2023 30 R B ENTERPRISE 47.39 40.66 85.8 86
4 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-8) UNDER RCFA DIVISION-I PHE DTE. , SM/12028 Augmentation Acceptance cum work order for Construction of MS pipe carrier bridge, additional (Extra line) supplying, aligning & laying HDPE pipe line and other works of RCFA Part-I Water Supply Scheme within command area of Zone-VIII under RCFA Div-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000297/2023-2024 2368/RCD-I 04/08/2023 60 SWATI CORPORATION 28.11 26.64 94.77 100
5 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-8) UNDER RCFA DIVISION-I PHE DTE. , SM/12028 Augmentation Acceptence cum work order for Additional (Extra line Node no. 550-550A, 555-548, 554-547, 527-321, 378-296, 397-423, 423-441) supplying, aligning & laying HDPE pipe line of RCFA Part-I Water Supply Scheme within command area of Zone-VII (Part-E) under RCFA Division-I PHE Dte Assistant Engineer 2 Junior Engineer ORD/000406/2023-2024 2588/RCD-I 07/09/2023 15 TARA CONSTRUCTION 7.55 7.46 98.81 100
6 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-8) UNDER RCFA DIVISION-I PHE DTE. , SM/12028 Augmentation Acceptance cum work order for Additional extra cutting Laterate/sandstone of distribution of pipe line at Augmentation of RCFA Part-II (Zione-8) within command area under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000522/2023-2024 2880/RCD-I 06/10/2023 90 SWATI CORPORATION 10.60 10.60 100 100
7 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-8) UNDER RCFA DIVISION-I PHE DTE. , SM/12028 Augmentation Sub Soil Investigation for 250 cum capacity RCC Over Head Reservoir at (Zone-8) of Jamuria Block for Augmentation of RCFA Part-II Piped Water Supply Scheme under RCFA Division-I PHE Dte. in the District of Paschim Bardhaman Assistant Engineer 2 Junior Engineer ORD/000561/2022-2023 3355/RCDI 23/12/2022 7 MOYTEC 0.49 0.00 0 0
8 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-8) UNDER RCFA DIVISION-I PHE DTE. , SM/12028 Augmentation Acceptance cum work order for Supplying E.R.M.S Black pipe of approved quality including carring, stacking at works site and other allied works for crossing of 07 nos (Node Point :139-140,153-3,42-43,86-87,60-61, and 38-40 culvert/canal of by the side of PWD road under Improvement RCFA Part-I water Supply scheme within command area of Zone VIII under RCFA Div-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000720/2023-2024 3614/RCD-I 20/12/2023 15 TARA CONSTRUCTION 3.32 0.00 0 0
9 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-8) UNDER RCFA DIVISION-I PHE DTE. , SM/12028 Augmentation Acceptance cum work order for Additional Supplying E.R.M.S Black pipe of approved quality including carring, stacking at works site and other allied works for Improvement RCFA Part-I Water Supply Scheme within command area of Zone VIII under RCFA Div-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000723/2023-2024 3612/RCD-1 20/12/2023 15 SWATI CORPORATION 2.78 0.00 0 0
10 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-8) UNDER RCFA DIVISION-I PHE DTE. , SM/12028 Augmentation Acceptance cum work order for Construction of Pump Houses (Size 14 mtr x 10 mtr x 8 mtr) under at Madanpur H/W Site under AUGMENTATION PWSS OF RCFA PART-II (ZONE-8) under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/000724/2023-2024 3611/RCD-1 20/12/2023 90 D.S.C. CONCERN 35.91 4.07 11.33 50
11 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-8) UNDER RCFA DIVISION-I PHE DTE. , SM/12028 Augmentation Acceptance cum Work Order for Balance work for laying of different dia HDPE pipe line (left out portion) and other allied works at Amritnagar (Part-A) under Augmentation of Amritnagar Zone-I under RCFA Division-I PHE Dte. Assistant Engineer 2 ORD/000955/2023-2024 2455/RCD-I 12/02/2024 45 M/S SINGH & KONAR CONSTRUCTION 45.53 0.00 0 0
12 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-8) UNDER RCFA DIVISION-I PHE DTE. , SM/12028 Augmentation Acceptance cum Work Order for Additional work for laying of DI pipe under Augmentation of Amritnagar Zone-I PWSS under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer 12 ORD/000985/2023-2024 473/RCD-I 12/02/2024 15 M/S SINGH & KONAR CONSTRUCTION 8.65 0.00 0 0
13 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-8) UNDER RCFA DIVISION-I PHE DTE. , SM/12028 Augmentation Acceptance cum Work Order for Emergent dismantling of RCC Elevated Reservoir capacity 682 cum staging height 20 meter at Mohishila OHR within Asansol Municipal Corporation area of Augmentation PWSS of RCFA Part-II (Zone-8) under RCFA Division-I PHE Dte. Assistant Engineer 2 Junior Engineer ORD/001018/2023-2024 519/RCD-I 16/02/2024 45 GITA CONSTRUCTION 17.37 8.67 49.91 100
14 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-8) UNDER RCFA DIVISION-I PHE DTE. , SM/12028 Augmentation Acceptance cum work order for Supply & Delivery of GI pipe including loading , unloading and carriage to Searsole store under RCFA Part-II PWSS under RCFA Division-I PHE Dte. Assistant Engineer 2 ORD/001022/2023-2024 626/RCD-I 27/02/2024 20 MAKALI ENGINEERING CORPORATION 93.69 46.84 49.99 100
15 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-8) UNDER RCFA DIVISION-I PHE DTE. , SM/12028 Augmentation Formal work order for Laying distribution system including FHTC for 5 (Two) nos uncovered village viz. Namokeshia and Jorbari within Salanpur Block under Augmentation of RCFA Part-II (zone-10) PWSS under RCFA Division-I PHE Dte. Junior Engineer ORD/001074/2023-2024 806/RCD-I 13/03/2024 90 UMA ENTERPRISE 107.86 0.00 0 0
16 PASCHIM BARDHAMAN RCFA Division -I AUGMENTATION PWSS OF RCFA PART-II (ZONE-8) UNDER RCFA DIVISION-I PHE DTE. , SM/12028 Augmentation Material Requisition To Resource Division RTOR000022/2023-2024 2948/RCD-I 11/10/2023 Resource Division 6.78 0.00 0 0
Total 542.69 218.31 40.23