Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
3 6.86 2.62 38.19  
1 JHARGRAM Jhargram Mechanical Division PROVIDING SOLARIZATION OF WBSEDCL ENERGISED PUMPING INSTALLATION AT ROHINI GROUND WATER BASED PIPED WATER SUPPLY SCHEME UNDER JJM PROGRAMME , SM/10289 Supply, installation, testing & commissioning of sprinkler system facility for cleaning the installed solar panel with other allied works at Rohini piped water supply scheme of Jhargram District under Jhargram Mechanical Division, P.H.E. Dte. DIC(D)_MMSD(D) JE (M) ORD/000135/2024-2025 568/W/MMSD(D) 04/07/2024 7 RSA ENTERPRISE 0.50 0.00 0 0
2 JHARGRAM Jhargram Mechanical Division PROVIDING SOLARIZATION OF WBSEDCL ENERGISED PUMPING INSTALLATION AT ROHINI GROUND WATER BASED PIPED WATER SUPPLY SCHEME UNDER JJM PROGRAMME , SM/10289 Additional work in connection with providing solarisation of WBSEDCL Energised Pumping installation at Rohini Ground water Based piped Water supply Scheme under JJM Programme under Jhargram Mechanical Division, PHE Dte. Assistant Engineer JE (M) ORD/000179/2023-2024 1962/JMD 28/07/2023 7 DIPALI CONSTRUCTION 0.19 0.19 100 100
3 JHARGRAM Jhargram Mechanical Division PROVIDING SOLARIZATION OF WBSEDCL ENERGISED PUMPING INSTALLATION AT ROHINI GROUND WATER BASED PIPED WATER SUPPLY SCHEME UNDER JJM PROGRAMME , SM/10289 Providing Solarizatin of WBSEDCL Energised Pumping installation at Rohini Ground water Based piped Water supply Scheme under JJM Programme under Jhargram Mechanical Division, PHE Dte. Assistant Engineer JE (M) ORD/000424/2021-2022 339/JMD 03/03/2022 30 DIPALI CONSTRUCTION 6.17 2.43 39.38 100
Total 6.86 2.62 38.17