Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 28,627.17 0 0  
1 JHARGRAM Binpur - I Central Drilling RAGHUNATHPUR AND ADJOING MOUJUAS PWSS , SM/12713 New Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 300 JHARGRAM SPV PRIVATE LIMITED 21,339.76 0.00 0 11
2 JHARGRAM Binpur - I Jhargram Division RAGHUNATHPUR AND ADJOING MOUJUAS PWSS , SM/12713 New Construction of Boundary wall allied works at 2nd Tube well site cum Head Work Site for Proposed Pipe Water Supply Scheme of Raghunathpur and its Adjoining Mouzas PWSS , Block Binpur-I, District Jhargram TYPE - B Total length 50 mtr,column size 250x250mm,3.00 M c/c ht 2.300mtr from G.L Assistant Engineer Junior Engineer, Jhargram Sub-Division ORD/000051/2024-2025 767/JSD 09/08/2024 30 ASHOK CHATTARAJ 4.61 0.00 0 0
3 JHARGRAM Binpur - I Jhargram Division RAGHUNATHPUR AND ADJOING MOUJUAS PWSS , SM/12713 New Sinking of Tube Well ,Construction of Different Capacity R.C.C Over Head Reservoir Over Pile / Raft Foundation including sub soil investigation works for Construction of Over Head Reservoir with laying distribution system , Pump House & Providing Functional Household Tap Connection (24693) including 02(Two) Years Operation & Maintenance For 14 Nos Pipe water supply Scheme within BINPUR-I Block Under Jhargram Division PHE Dte. Under Jhargram District. Assistant Engineer Junior Engineer Binpur-I block ORD/000069/2023-2024 1113/JHD 18/07/2023 250 M/S SWACH ENVIRONMENT PRIVATE LTD. 7,215.68 0.00 0 40
4 JHARGRAM Binpur - I Jhargram Division RAGHUNATHPUR AND ADJOING MOUJUAS PWSS , SM/12713 New Material Requisition To Resource Division RTOR000028/2023-2024 1539/JHD 06/09/2023 Resource Division 60.72 0.00 0 0
5 JHARGRAM Binpur - I Jhargram Mechanical Division RAGHUNATHPUR AND ADJOING MOUJUAS PWSS , SM/12713 New Quotation for new service connection atRaghunathpur water supply scheme T/W -1 BILL/00027/2024-2025 26/JMD 22/04/2024 WBSEDCL 3.06 0.00 0 null
6 JHARGRAM Binpur - I Jhargram Mechanical Division RAGHUNATHPUR AND ADJOING MOUJUAS PWSS , SM/12713 New New service connection charges for Belatikri, t/w no.-II BILL/01391/2023-2024 54/JMD 12/03/2024 WBSEDCL 3.34 0.00 0 null
Total 28,627.16 0.00 0