Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 33,653.55 2.08 0.01  
1 JHARGRAM Gopiballavpur - I Central Drilling CHHAHAZARI HUMTIA AND ADJOINING MOUJAS PWSS , SM/12448 New Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 300 JHARGRAM SPV PRIVATE LIMITED 21,339.76 0.00 0 11
2 JHARGRAM Gopiballavpur - I Jhargram Division CHHAHAZARI HUMTIA AND ADJOINING MOUJAS PWSS , SM/12448 New Sinking of Tube Well ,Construction of Different Capacity R.C.C Over Head Reservoir Over Pile / Raft Foundation including sub soil investigation works with laying distribution system , Pump House & Providing Functional Household Tap Connection (41827 Nos), etc. For 32 nos Pipe water supply Scheme within Gopiballavpur-I, Gopiballavpur-II and JHARGRAM Block Under Jhargram Division PHE Dte. Under Jhargram District. Assistant Engineer,Assistant Engineer Headquarter Junior Engineer, Gopiballavpur Sub Division,Junior Engineer-II ORD/000298/2023-2024 1727/JHD 30/09/2023 300 ADITYA ARAV DEV CONS CO. PVT. LTD. 12,284.77 0.00 0 25
3 JHARGRAM Gopiballavpur - I Jhargram Division CHHAHAZARI HUMTIA AND ADJOINING MOUJAS PWSS , SM/12448 New Construction of Boundary wall & allied works at 2nd. Tube well site of Chhahazari Humtia and its adjoining mouzas Pipe Water Supply Scheme within Gopibalavpur-I Block under Gopiballavpur Sub Division within Jhargram Division, P.H.E.Dt (Total length 50 mtr,column size 250x250mm,3.00 M c/c ht.- 2.300mtr from G.L) Assistant Engineer Junior Engineer, Gopiballavpur Sub Division,Junior Engineer, Jhargram Division ORD/000557/2023-2024 193/GPSD 11/03/2024 30 BISHNU PADA NANDI 4.28 2.08 48.6 95
4 JHARGRAM Gopiballavpur - I Jhargram Division CHHAHAZARI HUMTIA AND ADJOINING MOUJAS PWSS , SM/12448 New Material Requisition To Resource Division RTOR000015/2023-2024 418/JHD 13/03/2024 Resource Division 20.50 0.00 0 0
5 JHARGRAM Gopiballavpur - I Jhargram Mechanical Division CHHAHAZARI HUMTIA AND ADJOINING MOUJAS PWSS , SM/12448 New New Service Connection Charges for Chhayhazari Humita tw-I PWSS BILL/01196/2023-2024 37/JMD 01/02/2024 WBSEDCL 4.24 0.00 0 null
Total 33,653.55 2.08 0.01