Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 22,046.69 88.13 0.4  
1 JHARGRAM Jamboni Central Drilling KHAMARPARA AND ADJOINING MOUJAS PWSS , SM/12446 New Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 300 JHARGRAM SPV PRIVATE LIMITED 21,339.76 0.00 0 11
2 JHARGRAM Jamboni Jhargram Division KHAMARPARA AND ADJOINING MOUJAS PWSS , SM/12446 New Sinking of Tube Well ,Construction of Different Capacity R.C.C Over Head Reservoir Over Pile / Raft Foundation including sub soil investigation works for Construction of Over Head Reservoir with laying distribution system , Pump House& Providing Functional Household Tap Connection (2163 Nos), including 02(Two)Years Operation & Maintanance For KHAMARPARA, TENTULIA Pipe water supply Scheme within Jamboni Block Under Jhargram Sub Division of Jhargram Division PHE Dte. Under Jhargram District. Assistant Engineer Junior Engineer, Gopiballavpur Sub Division ORD/000111/2023-2024 1207/JHD 26/07/2023 180 SUNIL DULE 651.28 88.13 13.53 50
3 JHARGRAM Jamboni Jhargram Division KHAMARPARA AND ADJOINING MOUJAS PWSS , SM/12446 New Construction of Boundary Wall & allied works at 2nd Tube well site of Khamarpara and its adjoining mouzas pipe water supply Scheme within Jamboni Block under Jhargram RWS Sub Division within Jhargram Division. P.H.E. Dt (Total length 50 mtr, column size 250x250mm, M c/c ht. - 2.300 mtr from G.L.) Assistant Engineer The Junior Engineer-IV Jhargram Sub-Division,Junior Engineer-III ORD/000586/2023-2024 523/JRWS 15/03/2024 60 SUNIL DULE 4.84 0.00 0 1
4 JHARGRAM Jamboni Jhargram Division KHAMARPARA AND ADJOINING MOUJAS PWSS , SM/12446 New Material Requisition To Resource Division RTOR000056/2023-2024 1569/JHD 07/09/2023 Resource Division 40.31 0.00 0 0
5 JHARGRAM Jamboni Jhargram Mechanical Division KHAMARPARA AND ADJOINING MOUJAS PWSS , SM/12446 New New Service connection BILL/00429/2023-2024 9/JMD 28/09/2023 WBSEDCL 6.52 0.00 0 0
6 JHARGRAM Jamboni Jhargram Mechanical Division KHAMARPARA AND ADJOINING MOUJAS PWSS , SM/12446 New New Service connection BILL/00433/2023-2024 14/JMD 28/09/2023 WBSEDCL 3.98 0.00 0 0
Total 22,046.70 88.13 0.4