Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 1,799.59 0 0  
1 JHARGRAM Gopiballavpur - II Central Drilling JUNSOLA AND ADJOINING MOUJAS PWSS , SM/12342 New Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000202/2023-2024 2104/CDD 09/02/2024 180 JHARGRAM SPV PRIVATE LIMITED 110.72 0.00 0 10
2 JHARGRAM Gopiballavpur - II Jhargram Division JUNSOLA AND ADJOINING MOUJAS PWSS , SM/12342 New Sinking of Tube Well , Pump House, Rising main pipe line, Interconnection pipe line, Laying distribution pipe line, Installation of display Board & Accommodate FHTC(6721 nos) including 02(Two) Years Operation & Maintenance under JJM with allied work for DHADANGIRI, GOBINDAPUR, JUNSOLA, PETBINDHI & MAHAPAL PWSS in Gopiballavpur-II Block including supply of all labour & materials within Gopiballavpur Sub-Division under Jhargram Division, PHE Dte. Assistant Engineer Junior Engineer-III ORD/000152/2023-2024 1373/JHD 16/08/2023 120 M/S. EL-CON 1,574.44 0.00 0 0
3 JHARGRAM Gopiballavpur - II Jhargram Division JUNSOLA AND ADJOINING MOUJAS PWSS , SM/12342 New Construction and commissioning of RCC Over Head Reservoir of capacity 150 cum and staging height 20 mtr. as per approved drawing with allied works of JUNSOLA & its adjoining mouzas PWSS Proposed Pipe Water Supply Scheme for GOPIBALLAVPUR-II Block, District: - Jhargram. Assistant Engineer Junior Engineer-III ORD/000378/2023-2024 2051/JHD 07/12/2023 210 ABJ ENGINEERING 71.51 0.00 0 0
4 JHARGRAM Gopiballavpur - II Jhargram Division JUNSOLA AND ADJOINING MOUJAS PWSS , SM/12342 New Material Requisition To Resource Division RTOR000024/2023-2024 1560/JHD 07/09/2023 Resource Division 22.19 0.00 0 0
5 JHARGRAM Gopiballavpur - II Jhargram Mechanical Division JUNSOLA AND ADJOINING MOUJAS PWSS , SM/12342 New Supply, delivery, installation, commissioning & trial run of electro-mechanical components at T/W no. I & II and making compound lighting arrangement at T/W no. I of Junsola & adjoining moujas piped water supply scheme in the district of Jhargram under Jhargram Mechanical Division, PHE. Dte. Assistant Engineer JE (M) ORD/000030/2023-2024 1227/JMD 26/05/2023 180 CREATIVE WATER AND PROCESS TECHNOLOGIES PVT LTD 20.73 0.00 0 0
Total 1,799.59 0.00 0