Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
6 33,652.99 176.36 0.52  
1 JHARGRAM Gopiballavpur - I Central Drilling BARASOL AND ADJOINING MOUJAS PWSS at Gopiballavpur I Block. , SM/12324 New Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 300 JHARGRAM SPV PRIVATE LIMITED 21,339.76 4.72 0.02 11
2 JHARGRAM Gopiballavpur - I Jhargram Division BARASOL AND ADJOINING MOUJAS PWSS at Gopiballavpur I Block. , SM/12324 New Sinking of Tube Well ,Construction of Different Capacity R.C.C Over Head Reservoir Over Pile / Raft Foundation including sub soil investigation works with laying distribution system , Pump House & Providing Functional Household Tap Connection (41827 Nos), etc. For 32 nos Pipe water supply Scheme within Gopiballavpur-I, Gopiballavpur-II and JHARGRAM Block Under Jhargram Division PHE Dte. Under Jhargram District. Assistant Engineer,Assistant Engineer Headquarter Junior Engineer, Gopiballavpur Sub Division,Junior Engineer-II ORD/000298/2023-2024 1727/JHD 30/09/2023 300 ADITYA ARAV DEV CONS CO. PVT. LTD. 12,284.77 171.64 1.4 25
3 JHARGRAM Gopiballavpur - I Jhargram Division BARASOL AND ADJOINING MOUJAS PWSS at Gopiballavpur I Block. , SM/12324 New Construction of Boundary wall & allied works at 2nd. Tube well site of Barsol and its adjoining mouzas Pipe Water Supply Scheme within Gopialavpur-I Block under Gopiballavpur Sub Division within Jhargram Division, P.H.E.Dt (Total length 50 mtr,column size 250x250mm,3.00 M c/c ht.- 2.300mtr from G.L) Assistant Engineer Junior Engineer, Gopiballavpur Sub Division ORD/000555/2023-2024 191/GPSD 11/03/2024 30 ENVOTECH INFRA SOLUTION 4.24 0.00 0 0
4 JHARGRAM Gopiballavpur - I Jhargram Division BARASOL AND ADJOINING MOUJAS PWSS at Gopiballavpur I Block. , SM/12324 New Material Requisition To Resource Division RTOR000064/2023-2024 419/JHD 13/03/2024 Resource Division 15.79 0.00 0 0
5 JHARGRAM Gopiballavpur - I Jhargram Mechanical Division BARASOL AND ADJOINING MOUJAS PWSS at Gopiballavpur I Block. , SM/12324 New New service connection BILL/00338/2023-2024 17/AUG 24/08/2023 WBSEDCL 3.06 0.00 0 0
6 JHARGRAM Gopiballavpur - I Jhargram Mechanical Division BARASOL AND ADJOINING MOUJAS PWSS at Gopiballavpur I Block. , SM/12324 New Quotation for new service connection at Barsole T/W -I water supply scheme. BILL/00507/2024-2025 230/JMD 28/06/2024 WBSEDCL 5.37 0.00 0 null
Total 33,652.98 176.36 0.52