Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
10 285.47 168.85 59.15  
1 JHARGRAM Midnapore Division Augmentation of Ground Water Based Water supply scheme Belaberya PWSS to Accommodate FHTC in Gopiballavpur-II Block within Jhargram District under Jhargram Division, PHE Dte. , SM/09379 Augmentation Material Requisition To Resource Division RTOR000017/2022-2023 2395/MD 24/11/2022 Resource Division 36.34 0.00 0 0
2 JHARGRAM Midnapore Division Augmentation of Ground Water Based Water supply scheme Belaberya PWSS to Accommodate FHTC in Gopiballavpur-II Block within Jhargram District under Jhargram Division, PHE Dte. , SM/09379 Augmentation Material Requisition To Resource Division RTOR000045/2021-2022 498/MD 15/03/2022 Resource Division 15.18 0.00 0 0
3 JHARGRAM Midnapore Division Augmentation of Ground Water Based Water supply scheme Belaberya PWSS to Accommodate FHTC in Gopiballavpur-II Block within Jhargram District under Jhargram Division, PHE Dte. , SM/09379 Augmentation Preparation of D.P.R (Consultancy Work) in connection with the Functional House Hold Tap Connection (FHTC) of Belaberia PWSS in Gopi-IIBlock for Augmentation / Rejuvenation / Retrofitting etc. under Jhargram Division, P.H.E. Dte. VCH/001718/2021-2022 BP-2021-22-458 11/03/2022 LEMNISCATE 3.01 0.00 0 0
4 JHARGRAM Jhargram Division Augmentation of Ground Water Based Water supply scheme Belaberya PWSS to Accommodate FHTC in Gopiballavpur-II Block within Jhargram District under Jhargram Division, PHE Dte. , SM/09379 Augmentation laying of raising main with interconnection with tube wells ,bypass connection ,road crosssing work & pending distribution main[Node 1 to Node 3,Node 5 to Node 10,Node 3 to Node 8(part)] of augmentation of ground water based water Beliabera PWSS under Gopiballavpur-II Block within Jhargram Division,P.H.E. Dte. Assistant Engineer Junior Engineer-III ORD/000045/2023-2024 884/JHD 08/06/2023 30 SUBRATA DAS 16.48 7.74 46.97 100
5 JHARGRAM Jhargram Division Augmentation of Ground Water Based Water supply scheme Belaberya PWSS to Accommodate FHTC in Gopiballavpur-II Block within Jhargram District under Jhargram Division, PHE Dte. , SM/09379 Augmentation Supply delivery of Different dia CIDF S/V for the work of ¿Augmentation of Ground Water Based Water Supply Scheme for Beliabera to Accommodate FHTC in Block Gopiballavpur - II under Jhargram Sub Division within Jhargram Division, PHE Dte. Assistant Engineer ORD/000070/2022-2023 57/GPSD 16/09/2022 15 PROVAT KUMAR DE 2.63 0.00 0 100
6 JHARGRAM Jhargram Division Augmentation of Ground Water Based Water supply scheme Belaberya PWSS to Accommodate FHTC in Gopiballavpur-II Block within Jhargram District under Jhargram Division, PHE Dte. , SM/09379 Augmentation Laying of Clear Water Rising Main / Distribution pipe line and FHTC work including Construction and Commissioning of RCC Over Head Reservoir (Torch type with solid raft ) of capacity 150 cum and staging height 20 mtr. as per approved drawing (No:- PC-I /OHR /10/2012) including supply of all labour & materials for Augmentation of Ground Based Belaberya PWSS in Gopiballavpur -II Block within Jhargram District under Jhargram Division, PHE Dte. Assistant Engineer Junior Engineer-III ORD/000174/2022-2023 874/MD 10/05/2022 180 SUBRATA DAS 188.22 145.08 77.08 77
7 JHARGRAM Jhargram Division Augmentation of Ground Water Based Water supply scheme Belaberya PWSS to Accommodate FHTC in Gopiballavpur-II Block within Jhargram District under Jhargram Division, PHE Dte. , SM/09379 Augmentation Sinking of 250 x 150 mm dia. x 150 mtr.rig bored tubewell at Head worksite for Augmentation of Beliabera W/S Scheme in Gopiballavpur-II Block within Jhargram District under Jhargram Division, P.H.E. Dte. Assistant Engineer Junior Engineer-III ORD/000350/2023-2024 1949/JHD 22/11/2023 15 S.R. ENTERPRISE 7.01 3.25 46.36 100
8 JHARGRAM Jhargram Mechanical Division Augmentation of Ground Water Based Water supply scheme Belaberya PWSS to Accommodate FHTC in Gopiballavpur-II Block within Jhargram District under Jhargram Division, PHE Dte. , SM/09379 Augmentation Supply, delivery, installation, commissioning electro-mechanical components at T/W no. I & II and making compound lighting arrangement at T/W no. I of Beliaberya W/S scheme under Jhargram Mechanical Division, PHE Dte. in the dist. of Jhargram. Driller-In-Charge Junior Engineer ORD/000170/2023-2024 2094/JMD 03/08/2023 30 S.S. GHORAI 13.82 10.05 72.72 90
9 JHARGRAM Jhargram Mechanical Division Augmentation of Ground Water Based Water supply scheme Belaberya PWSS to Accommodate FHTC in Gopiballavpur-II Block within Jhargram District under Jhargram Division, PHE Dte. , SM/09379 Augmentation Supply, delivery & installation of various electro-mechanical accessories at tube well no.-I of Beliabera w/s scheme in the dist. of Jhargram District under Jhargram Mechanical Division P.H.E Dte. Driller-In-Charge Junior Engineer ORD/001372/2023-2024 2989/JMD 13/03/2024 30 S.S. GHORAI 1.39 1.36 97.84 100
10 JHARGRAM Jhargram Mechanical Division Augmentation of Ground Water Based Water supply scheme Belaberya PWSS to Accommodate FHTC in Gopiballavpur-II Block within Jhargram District under Jhargram Division, PHE Dte. , SM/09379 Augmentation Supply, delivery, installation of electro-mechanical components for tube well no. II of Beliabera water supply scheme in the district of Jhargram under Jhargram Mechanical Division, P.H.E. Dte. DIC(D)_MMSD(D) JE (M) ORD/001401/2023-2024 113/W/MMSD(D) 12/03/2024 30 S.S. GHORAI 1.39 1.37 98.56 100
Total 285.48 168.85 59.15