Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 522.99 190.09 36.35  
1 ALIPURDUAR Kalchini Alipurduar Division BHATPARA TEA GARDEN PIPED WATER SUPPLY SCHEME , SM/14212 New Providing balance FHTC from existing distribution system as per specification for BHATPARA TG PWSS under Alipurduar Division, PHE Dte. HQ-A.E RWS Kalchini Block ORD/000315/2023-2024 2185/ALD 06/10/2023 60 MAHENDRA CHHETRI 17.77 0.00 0 0
2 ALIPURDUAR Kalchini Alipurduar Division BHATPARA TEA GARDEN PIPED WATER SUPPLY SCHEME , SM/14212 New T/W Boring by ODEX-165 Method of drilling at HW FIRST TW site including LDS with new HDPE P/L, Cons. of 250 Cum OHR as per Departmental Design and drawing including soil investigation works, 2nos. pumphouse and boundary wall, providing FHTC and others allied works for BHATPARA TG PWSS under Alipurduar Division PHE DTE HQ-A.E RWS Kalchini Block ORD/000452/2022-2023 2969/ALD 31/01/2023 360 MAHENDRA CHHETRI 362.78 190.09 52.4 76
3 ALIPURDUAR Kalchini Alipurduar Division BHATPARA TEA GARDEN PIPED WATER SUPPLY SCHEME , SM/14212 New Laying of HDPE Pipeline for left out household connection, boundary wall, pump house, OHR, Land Development, Pathway Platform for FHTC and allied works at Bhatpara PWSS under Alipurduar Division, P.H.E. Dte. (SM/14212) HQ-A.E RWS Kalchini Block ORD/000510/2023-2024 828/ALD 14/03/2024 70 MAHENDRA CHHETRI 47.40 0.00 0 0
4 ALIPURDUAR Kalchini Alipurduar Division BHATPARA TEA GARDEN PIPED WATER SUPPLY SCHEME , SM/14212 New Material Requisition To Resource Division RTOR000025/2023-2024 1270/ALD 11/08/2023 Resource Division 17.99 0.00 0 0
5 ALIPURDUAR Kalchini Alipurduar Division BHATPARA TEA GARDEN PIPED WATER SUPPLY SCHEME , SM/14212 New Material Requisition To Resource Division RTOR000075/2023-2024 99/ALD 10/01/2024 Resource Division 14.30 0.00 0 0
6 ALIPURDUAR Kalchini Alipurduar Division BHATPARA TEA GARDEN PIPED WATER SUPPLY SCHEME , SM/14212 New Material Requisition To Resource Division RTOR000086/2023-2024 110/ALD 10/01/2024 Resource Division 14.30 0.00 0 0
7 ALIPURDUAR Kalchini Northern Mechanical Division II BHATPARA TEA GARDEN PIPED WATER SUPPLY SCHEME , SM/14212 New New Service connection for Bhatpara TG PWSS, P/H-II BILL/02409/2023-2024 BP-2023-24-532 11/01/2024 WBSEDCL 5.26 0.00 0 0
8 ALIPURDUAR Kalchini Northern Mechanical Division II BHATPARA TEA GARDEN PIPED WATER SUPPLY SCHEME , SM/14212 New New Service Connection Charge for Bhatpara TG PWSS P/HNO-I BILL/02636/2023-2024 BP-2023-24-601 15/02/2024 WBSEDCL 21.27 0.00 0 0
9 ALIPURDUAR Kalchini Northern Mechanical Division II BHATPARA TEA GARDEN PIPED WATER SUPPLY SCHEME , SM/14212 New Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for Bhatpara TG water supply scheme, TW no I and II under Jal Jeevan Mission under NMD-II, PHE Dte. APD Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 1, Cooch-Behar Mechanical Sub-Division, ORD/000833/2023-2024 2414/NMD-II 10/08/2023 30 SARKAR ELECTRIC 21.92 0.00 0 90
Total 522.97 190.09 36.35