Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
9 317.98 127.09 39.97  
1 ALIPURDUAR Kumargram Alipurduar Division TELIPARA PIPED WATER SUPPLY SCHEME. , SM/13303 New Providing balance FHTC for TELIPARA PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division Alipurduar Sub Division ORD/000216/2023-2024 1570/ALD 23/08/2023 30 DHANENDRA SARKAR 4.32 0.00 0 0
2 ALIPURDUAR Kumargram Alipurduar Division TELIPARA PIPED WATER SUPPLY SCHEME. , SM/13303 New Laying of rising main line HDPE PN10, horizontal boring by HDD method, bridge and culvert crossing, construction of pathway, surface drain and chatal, installation of paver block, Land development along with the others allied works at Telipara Headwork site PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division Alipurduar Sub Division ORD/000394/2023-2024 205/ALD 16/01/2024 180 HARIDAS GHOSH 31.65 0.00 0 0
3 ALIPURDUAR Kumargram Alipurduar Division TELIPARA PIPED WATER SUPPLY SCHEME. , SM/13303 New Supply of DI specials and CI Jeffy coupling for Telipara Water Supply Scheme (SM/13303) of Kumargram Block under Alipurduar Division P.H.E. Dte. Alipurduar Sadar Sub Division Birpara Sub Division ORD/000515/2023-2024 834/ALD 14/03/2024 150 HARI CONSTRUCTION 13.58 5.76 42.42 80
4 ALIPURDUAR Kumargram Alipurduar Division TELIPARA PIPED WATER SUPPLY SCHEME. , SM/13303 New Constructions of P/H and T/W Boring by ODEX-165 Method of drilling at HW and 2nd site , LDS with UPVC P/L including rising main and delivery connection, Cons. of 200 Cum OHR as per Departmental Design & drawing along with soil investigation works, providing FHTC and others allied works for TELIPARA PWSS Under Alipurduar Division PHE DTE. Alipurduar Sadar Sub Division Alipurduar Sub Division ORD/000579/2022-2023 3640/ALD 31/03/2023 180 MATRI ENTERPRISE 225.29 121.33 53.86 85
5 ALIPURDUAR Kumargram Alipurduar Division TELIPARA PIPED WATER SUPPLY SCHEME. , SM/13303 New Material Requisition To Resource Division RTOR000016/2023-2024 222/ALD 03/05/2023 Resource Division 12.68 0.00 0 0
6 ALIPURDUAR Kumargram Alipurduar Division TELIPARA PIPED WATER SUPPLY SCHEME. , SM/13303 New Material Requisition To Resource Division RTOR000050/2023-2024 2398/ALD 08/11/2023 Resource Division 6.34 0.00 0 0
7 ALIPURDUAR Kumargram Northern Mechanical Division II TELIPARA PIPED WATER SUPPLY SCHEME. , SM/13303 New QUOTATION FOR NEW SERVICE CONNECTION AT TELIPARA PWSS PH NO-II BILL/00032/2023-2024 BP-2023-24-50 12/05/2023 WBSEDCL 1.21 0.00 0 0
8 ALIPURDUAR Kumargram Northern Mechanical Division II TELIPARA PIPED WATER SUPPLY SCHEME. , SM/13303 New QUOTATION FOR NEW SERVICE CONNECTION AT TELIPARA PWSS PH NO-I BILL/00042/2023-2024 BP-2023-24-51 12/05/2023 WBSEDCL 1.21 0.00 0 0
9 ALIPURDUAR Kumargram Northern Mechanical Division II TELIPARA PIPED WATER SUPPLY SCHEME. , SM/13303 New Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for TELIPARA water supply scheme, TW no I & II under Northern Mechanical Division-II, PHE Dte.Alipurduar Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 1, Cooch-Behar Mechanical Sub-Division, ORD/000837/2023-2024 2421/NMD-II 10/08/2023 30 QUAZI NOZRUL ISLAM 21.70 0.00 0 0
Total 317.98 127.09 39.97