Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
14 646.56 418.42 64.71  
1 ALIPURDUAR Falakata Alipurduar Division KADAMBINI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME , SM/13239 New Restoration of DI pipe crossing near CHOR TORSHA and other repair works in Banshidharpur area under Alipurduar Division, PHE Dte. Birpara A.E ORD/000035/2023-2024 366/ALD 18/05/2023 30 NARENDRA BHADANI. 1.42 0.00 0 0
2 ALIPURDUAR Falakata Alipurduar Division KADAMBINI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME , SM/13239 New Continuation work order for the work of "Sinking of Rig bore T/W (4nos.) by Reverse Rotary method of drilling, cons. of 100 cum. OHR (2nos), cons. of P/H and B/W, Rising main, distribution line and providing FHTC at H/W and 2nd site inclu. Soil testing for KADAMBINI TG PWSS (ZONE-I and ZONE-II) under Birpara Sub-Division, Alipurduar Division, PHE Dte." (As per approval of SE NBC-I P.H.E. Dte. vide e-file no-DPHE-33014/5/2024-EE(ALI_D) SEC-DPHE (Computer No-973264)) Birpara A.E RWS Falakata Block ORD/000199/2024-2025 1913/ALD 26/06/2024 60 DILIP MAHATO 14.57 7.18 49.28 90
3 ALIPURDUAR Falakata Alipurduar Division KADAMBINI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME , SM/13239 New Laying leftout pipeline (not including at Lop of pipeline) at kadambini TG PWSS (Zone-I & II) under Birpara Sub-Division, Alipurduar Division, PHE Dte. Birpara A.E ORD/000344/2024-2025 3233/ALD 10/09/2024 60 DILIP MAHATO (OPC) PRIVATE LIMITED 25.10 0.00 0 0
4 ALIPURDUAR Falakata Alipurduar Division KADAMBINI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME , SM/13239 New Sinking of Rig bore T/W (4nos.) by Reverse Rotary method of drilling, cons. of 100 cum. OHR (2nos), cons. of P/H and B/W, Rising main, distribution line and providing FHTC at H/W and 2nd site inclu. Soil testing for KADAMBINI TG PWSS (ZONE-I and ZONE-II) under Birpara Sub-Division, Alipurduar Division, PHE Dte Birpara A.E RWS Falakata Block ORD/000430/2022-2023 2857/ALD 17/01/2023 180 DILIP MAHATO 498.42 402.66 80.79 90
5 ALIPURDUAR Falakata Alipurduar Division KADAMBINI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME , SM/13239 New "Supply of DIDF Pipes and DI Special and CI Jeffy Coupling for Kadambini TG Water Supply Scheme (SM/13239) of Falakata Block under Alipurduar Division P.H.E. Dte. " Alipurduar Sadar Sub Division Birpara Sub Division ORD/000526/2023-2024 845/ALD 14/03/2024 30 MANSAROVAR CASTING 13.20 0.00 0 0
6 ALIPURDUAR Falakata Alipurduar Division KADAMBINI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME , SM/13239 New Material Requisition To Resource Division RTOR000029/2023-2024 1274/ALD 11/08/2023 Resource Division 34.39 0.00 0 0
7 ALIPURDUAR Falakata Northern Mechanical Division II KADAMBINI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME , SM/13239 New QUOTATION FOR NEW SERVICE CONNECTION AT KADAMBINI TG TW NO-II,Z-II BILL/00058/2023-2024 BP-2023-24-52 15/05/2023 WBSEDCL 1.37 0.00 0 0
8 ALIPURDUAR Falakata Northern Mechanical Division II KADAMBINI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME , SM/13239 New QUOTATION FOR NEW SERVICE CONNECTION AT KADAMBINI TG TW NO-I,Z-II BILL/00059/2023-2024 BP-2023-24-54 15/05/2023 WBSEDCL 1.37 0.00 0 0
9 ALIPURDUAR Falakata Northern Mechanical Division II KADAMBINI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME , SM/13239 New QUOTATION FOR NEW SERVICE CONNECTION AT KADAMBINI TG TW NO-I,Z-I BILL/00060/2023-2024 BP-2023-24-53 15/05/2023 WBSEDCL 1.37 0.00 0 0
10 ALIPURDUAR Falakata Northern Mechanical Division II KADAMBINI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME , SM/13239 New QUOTATION FOR NEW SERVICE CONNECTION AT KADAMBINI TG TW NO-II,Z-I BILL/00061/2023-2024 BP-2023-24-55 15/05/2023 WBSEDCL 1.37 0.00 0 0
11 ALIPURDUAR Falakata Northern Mechanical Division II KADAMBINI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME , SM/13239 New Additional Quotation for New Service connection charges for Kadambini T.G PWSS, Zone-I,P/H No-I BILL/02622/2023-2024 BP-2023-24-588 02/02/2024 WBSEDCL 11.92 0.00 0 null
12 ALIPURDUAR Falakata Northern Mechanical Division II KADAMBINI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME , SM/13239 New ADDITIONAL QUOTATION FOR NEW SERVICE CONNECTION CHARGES FOR KADAMBINI T.G PWSS, ZONE-I,P/HNO-II BILL/02750/2023-2024 BP-2023-24-621 20/02/2024 WBSEDCL 5.15 0.00 0 null
13 ALIPURDUAR Falakata Northern Mechanical Division II KADAMBINI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME , SM/13239 New Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for Kadambini water supply scheme, TW no I and II of Zone-II under Northern Mechanical Division-II, PHE Dte.Alipurduar. Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 1, Northern Mechanical Division-II,PHE ORD/000854/2023-2024 2437/NMD-II 11/08/2023 30 A.G ENTERPRISE 18.46 8.58 46.48 90
14 ALIPURDUAR Falakata Northern Mechanical Division II KADAMBINI TEA GARDEN AREA PIPED WATER SUPPLY SCHEME , SM/13239 New Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for Kadambini water supply scheme, TW no I and II of Zone-I under Northern Mechanical Division-II, PHE Dte.Alipurduar. ORD/001090/2023-2024 2792/NMD-II 06/10/2023 30 ASHUTOSH DAS & CO. 18.45 0.00 0 0
Total 646.56 418.43 64.72