Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
12 21,625.35 77.47 0.36  
1 ALIPURDUAR Central Drilling AUGMENTATION OF HASIMARA WATER SUPPLY SCHEME , SM/12361 Augmentation Construction of Big Diameter Tube-Well by Deploying of Suitable Capacity Drilling Rig (Direct Rotary, Reverse Rotary, Odex Method) at Different Districts for Different Water Supply Schemes Including Procurement & Installation Pumping Machinery with All Allied Accessories at the Above Constructed Tube-Wells Under JJM Program throughout the State of West Bengal. (2ed call of NIET 25 of 2022-23) Assistant Engineer,Driller In Charge Junior Engineer ORD/000001/2023-2024 1415/CDD 21/09/2023 300 JHARGRAM SPV PRIVATE LIMITED 21,339.76 0.00 0 11
2 ALIPURDUAR Alipurduar Division AUGMENTATION OF HASIMARA WATER SUPPLY SCHEME , SM/12361 Augmentation Laying of DI & HDPE pipeline from Santali TG and Malangi TG to the existing OHR at Hasimara PWSS area, kalchini Block under Alipurduar division, PHE Dte. HQ-A.E Birpara Sub Division,RWS Kalchini Block ORD/000042/2023-2024 388/ALD 19/05/2023 450 D. K. & SONS 26.33 6.80 25.83 100
3 ALIPURDUAR Alipurduar Division AUGMENTATION OF HASIMARA WATER SUPPLY SCHEME , SM/12361 Augmentation Providing balance FHTC from existing distribution system as per specification for HASIMARA PWSS under Alipurduar Division, PHE Dte. HQ-A.E RWS Kalchini Block ORD/000283/2023-2024 1990/ALD 15/09/2023 90 BRAJA GOPAL SAHA 73.90 0.00 0 0
4 ALIPURDUAR Alipurduar Division AUGMENTATION OF HASIMARA WATER SUPPLY SCHEME , SM/12361 Augmentation Special repairing of road for providing of FHTC at Northen side of Hasimara PWSS under Alipurduar, Division, PHE Dte. HQ-A.E Birpara Sub Division ORD/000313/2023-2024 2178/ALD 06/10/2023 30 SHIB RATAN BHOWMIK 0.93 0.00 0 0
5 ALIPURDUAR Alipurduar Division AUGMENTATION OF HASIMARA WATER SUPPLY SCHEME , SM/12361 Augmentation Continuation order for the work of "Collection of house hold details at prescribed format through mobile app/Hard Copy including Geo-reference as directed by the E.I.C. and submission the same to PHE Dte. (in soft copy) Part-B" Alipurduar Sadar Sub Division Alipurduar Sub Division,Birpara Sub Division ORD/000346/2024-2025 3424/ALD 26/09/2024 180 TAPASH KUMAR BHOWMICK 4.67 0.00 0 100
6 ALIPURDUAR Alipurduar Division AUGMENTATION OF HASIMARA WATER SUPPLY SCHEME , SM/12361 Augmentation Continuation for the work of "Entry of data for house Connection (JJM) of PWSS in website under Alipurduar division, PHE Dte. " Alipurduar Sadar Sub Division Birpara Sub Division ORD/000347/2024-2025 3425/ALD 26/09/2024 180 TAPASH KUMAR BHOWMICK 4.29 0.00 0 0
7 ALIPURDUAR Alipurduar Division AUGMENTATION OF HASIMARA WATER SUPPLY SCHEME , SM/12361 Augmentation Soil investigation work at proposed OHR construction site of Hasimara PWSS under Alipurduar Division PHE Dte. HQ-A.E ORD/000405/2022-2023 2790/ALD 10/01/2023 30 MOYTEC 0.95 0.95 100 100
8 ALIPURDUAR Alipurduar Division AUGMENTATION OF HASIMARA WATER SUPPLY SCHEME , SM/12361 Augmentation Construction of a pump house at Old Hasimara HW Site PWSS under Alipurduar Division, PHE Dte. HQ-A.E RWS Kalchini Block ORD/000476/2023-2024 694/ALD 07/03/2024 120 AMIT BARDHAN 7.20 2.44 33.89 60
9 ALIPURDUAR Alipurduar Division AUGMENTATION OF HASIMARA WATER SUPPLY SCHEME , SM/12361 Augmentation Construction of 700cum OHR for Augmentation of HASIMARA Water Supply Scheme under Alipurduar Division, PHE Dte.(3rd call) HQ-A.E RWS Kalchini Block ORD/000479/2022-2023 3196/ALD 27/02/2023 180 BRAJA GOPAL SAHA 121.92 67.28 55.18 90
10 ALIPURDUAR Alipurduar Division AUGMENTATION OF HASIMARA WATER SUPPLY SCHEME , SM/12361 Augmentation Continuation of work of "Hiring of Diesel Vehicle Maxi Cab (At least 7 seater ) for Deputy Superintending Engineer, North Bengal Circle-I , P.H.E. Dte.(from 01.03.2024 to 31.07.2024)" HQ-A.E ORD/000549/2023-2024 602/ALD 27/02/2024 150 MAHENDRA CHHETRI 2.00 0.00 0 0
11 ALIPURDUAR Alipurduar Division AUGMENTATION OF HASIMARA WATER SUPPLY SCHEME , SM/12361 Augmentation Material Requisition To Resource Division RTOR000004/2023-2024 185/ALD 28/04/2023 Resource Division 33.51 0.00 0 0
12 ALIPURDUAR Alipurduar Division AUGMENTATION OF HASIMARA WATER SUPPLY SCHEME , SM/12361 Augmentation Material Requisition To Resource Division RTOR000006/2024-2025 3611/ALD 24/10/2024 Resource Division 9.89 0.00 0 0
Total 21,625.35 77.46 0.36