Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
12 277.64 102.62 36.96  
1 ALIPURDUAR Alipurduar Division AUGMENTATION OF KAIJALI BASTY WATER SUPPLY SCHEME , SM/11958 Augmentation Tubewell boring by ODEX-165 method of drilling, construction of Pump House, Boundary wall at proposed 4th TW site of Kaijali PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division RWS Alipurduar - II Block ORD/000004/2023-2024 07/ALD 04/04/2023 120 PRITAM DAS 17.41 10.87 62.44 100
2 ALIPURDUAR Alipurduar Division AUGMENTATION OF KAIJALI BASTY WATER SUPPLY SCHEME , SM/11958 Augmentation Land development works, Construction of surface drain, pathway, and other allied works at Kaijali Busty 4th tube well site with the Augmentation of Kaijali Busty PWSS Under Alipurduar Sadar Sub-Division, under Alipurduar Division PHE DTE.(SM/11958) Alipurduar Sadar Sub Division RWS Alipurduar - II Block ORD/000220/2024-2025 2273/ALD 05/08/2024 60 RAMEN DEY & CO 4.28 0.00 0 0
3 ALIPURDUAR Alipurduar Division AUGMENTATION OF KAIJALI BASTY WATER SUPPLY SCHEME , SM/11958 Augmentation Land development works, Construction of surface drain, pathway, and other allied works at Kaijali Busty 3rd tube well site with the Augmentation of Kaijili Busty PWSS Alipurduar Sadar Sub-Division, under Alipurduar Division PHE DTE.(SM/11958) Alipurduar Sadar Sub Division RWS Alipurduar - II Block ORD/000221/2024-2025 2274/ALD 05/08/2024 60 KAMALESH ROY 3.84 0.00 0 50
4 ALIPURDUAR Alipurduar Division AUGMENTATION OF KAIJALI BASTY WATER SUPPLY SCHEME , SM/11958 Augmentation Tube well Boring by ODEX-165 method of drilling at 3rd TWsite including laying Distribution system with new HDPE Pipeline (Part-A), Providing FHTC and other allied works for augmentation of KAIJALI BUSTY PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division RWS Alipurduar - II Block ORD/000331/2022-2023 2240/ALD 21/11/2022 540 KAMALESH ROY 70.16 52.07 74.22 68
5 ALIPURDUAR Alipurduar Division AUGMENTATION OF KAIJALI BASTY WATER SUPPLY SCHEME , SM/11958 Augmentation Soil investigation works for proposed overhead reservoir of KAIJALI BUSTI PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division RWS Alipurduar - II Block ORD/000339/2022-2023 2248/ALD 21/11/2022 30 K S GROUP 0.65 0.65 100 11
6 ALIPURDUAR Alipurduar Division AUGMENTATION OF KAIJALI BASTY WATER SUPPLY SCHEME , SM/11958 Augmentation Construction of 200 cum OHR as per Departmental Design and drawing at KAIJALI BUSTY PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division RWS Alipurduar - II Block ORD/000353/2022-2023 2497/ALD 13/12/2022 540 MAHENDRA CHHETRI 68.63 33.16 48.32 70
7 ALIPURDUAR Alipurduar Division AUGMENTATION OF KAIJALI BASTY WATER SUPPLY SCHEME , SM/11958 Augmentation Laying of new HDPE pipeline for interconnection in the distribution system and bridge/culvert crossing land developmentworks, construction of surface drain, pathway and other allied works in connection with the Augmentation of KAijali Basty PWSS (SM/11958) under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division RWS Alipurduar - II Block ORD/000392/2024-2025 3958/ALD 26/11/2024 60 MAHENDRA CHHETRI 29.40 0.00 0 0
8 ALIPURDUAR Alipurduar Division AUGMENTATION OF KAIJALI BASTY WATER SUPPLY SCHEME , SM/11958 Augmentation Material Requisition To Resource Division RTOR000004/2024-2025 3609/ALD 24/10/2024 Resource Division 11.11 0.00 0 0
9 ALIPURDUAR Alipurduar Division AUGMENTATION OF KAIJALI BASTY WATER SUPPLY SCHEME , SM/11958 Augmentation Material Requisition To Resource Division RTOR000023/2022-2023 1588/ALD 14/09/2022 Resource Division 30.75 0.00 0 0
10 ALIPURDUAR Northern Mechanical Division II AUGMENTATION OF KAIJALI BASTY WATER SUPPLY SCHEME , SM/11958 Augmentation QUATATION BILL/02208/2023-2024 BP-2023-24-484 12/12/2023 WBSEDCL 5.11 0.00 0 0
11 ALIPURDUAR Northern Mechanical Division II AUGMENTATION OF KAIJALI BASTY WATER SUPPLY SCHEME , SM/11958 Augmentation QUOTATION BILL/02209/2023-2024 BP-2023-24-485 12/12/2023 WBSEDCL 11.22 0.00 0 0
12 ALIPURDUAR Northern Mechanical Division II AUGMENTATION OF KAIJALI BASTY WATER SUPPLY SCHEME , SM/11958 Augmentation Supply, delivery, installation, commissioning and Trial run of electro mechanical component along with Cu wound line voltage corrector for Augmentation of Kaijali Basty Water Supply Scheme TW No.- I and II under NMD-II,PHE.Dte,Apd. Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 1, Cooch-Behar Mechanical Sub-Division, ORD/000893/2023-2024 2480/NMD-II 11/08/2023 30 DIAMOND ELECTRICAL WORKS 25.08 5.87 23.41 90
Total 277.65 102.62 36.96