Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
14 364.45 225.96 62  
1 ALIPURDUAR Kumargram Alipurduar Division NEWLANDS TG AREA PIPED WATER SUPPLY SCHEME , SM/11484 New Construction of 250cum. OHR for Newlands TG Water Supply Scheme under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division Birpara Sub Division ORD/000138/2022-2023 975/ALD 15/07/2022 180 TAPASH KUMAR BHOWMICK 57.61 41.99 72.89 73
2 ALIPURDUAR Kumargram Alipurduar Division NEWLANDS TG AREA PIPED WATER SUPPLY SCHEME , SM/11484 New Hiring of Additional Diesel Vehicle Maxi Cab(At least 7 seater ) for inspection and monitoring of Jal Jeevan Mission (JJM) works under Alipurduar Division, P.H.E. Dte.(from 01.08.2022 to 31.10.2022) HQ-A.E ORD/000201/2022-2023 1122/ALD 29/07/2022 90 NIRANJAN KIRTANIA 0.50 0.25 50 100
3 ALIPURDUAR Kumargram Alipurduar Division NEWLANDS TG AREA PIPED WATER SUPPLY SCHEME , SM/11484 New Construction of Pump House,Boundary Wall, Tube well Boring by ODEX-165 Method of drilling at H/W site including laying distribution system and providing FHTC for NEWLANDS TEA GARDEN AREA PWSS Under Alipurduar Division PHE DTE. Alipurduar Sadar Sub Division Birpara Sub Division ORD/000206/2022-2023 1275/ALD 17/08/2022 120 TAPASH KUMAR BHOWMICK 96.78 77.22 79.79 93
4 ALIPURDUAR Kumargram Alipurduar Division NEWLANDS TG AREA PIPED WATER SUPPLY SCHEME , SM/11484 New Construction of Pump House,Boundary Wall, Tube well Boring by ODEX-165 Method of drilling at 2nd site including laying distribution system , Rising main and providing FHTC for NEWLANDS TEA GARDEN AREA PWSS Under Alipurduar Division PHE DTE. Alipurduar Sadar Sub Division Birpara Sub Division ORD/000213/2022-2023 1307/ALD 22/08/2022 120 MADHAB SAHA 97.20 91.59 94.23 94
5 ALIPURDUAR Kumargram Alipurduar Division NEWLANDS TG AREA PIPED WATER SUPPLY SCHEME , SM/11484 New Providing balance FHTC for NEWLAND TG PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division Birpara Sub Division ORD/000246/2023-2024 1792/ALD 29/08/2023 60 SUBHAK CHIK BARAIK 13.39 0.00 0 0
6 ALIPURDUAR Kumargram Alipurduar Division NEWLANDS TG AREA PIPED WATER SUPPLY SCHEME , SM/11484 New Supply of CIDF & CISS Pipes and specials for New Land TG WSS Under Alipurduar Division P.H.E Dte. Alipurduar Sadar Sub Division Alipurduar Sub Division ORD/000277/2023-2024 1593/ALD 25/08/2023 30 MADHAB SAHA 6.76 0.00 0 0
7 ALIPURDUAR Kumargram Alipurduar Division NEWLANDS TG AREA PIPED WATER SUPPLY SCHEME , SM/11484 New Laying of Rising Main line with HDPE PN 10, bridge and culvert crossing, cons. Of pathway, surface drain and chatal, Installation of Paver block, land development along with the other allied works at Newlands TG H/W Site under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division Alipurduar Sub Division ORD/000336/2023-2024 391/ALD 05/02/2024 90 K S ENTERPRISE 48.23 0.00 0 0
8 ALIPURDUAR Kumargram Alipurduar Division NEWLANDS TG AREA PIPED WATER SUPPLY SCHEME , SM/11484 New Continuation order of Supply of fuel for Additional Diesel Vehicle Maxi Cab(At least 7 seater ) for inspection and monitoring of Jal Jeevan Mission (JJM) works under Alipurduar Division, P.H.E. Dte.(from 01.11.2022 to 31.01.2023) HQ-A.E ORD/000344/2022-2023 2013/ALD 28/10/2022 90 NIRANJAN KIRTANIA 0.70 0.23 32.86 100
9 ALIPURDUAR Kumargram Alipurduar Division NEWLANDS TG AREA PIPED WATER SUPPLY SCHEME , SM/11484 New Continuation for the work of Hiring of Additional Diesel Vehicle Maxi Cab(At least 7 seater ) for inspection and monitoring of Jal Jeevan Mission (JJM) works under Alipurduar Division, P.H.E. Dte.(from 01.11.2022 to 31.01.2023) HQ-A.E ORD/000345/2022-2023 2014/ALD 28/10/2022 90 NIRANJAN KIRTANIA 0.50 0.25 50 100
10 ALIPURDUAR Kumargram Alipurduar Division NEWLANDS TG AREA PIPED WATER SUPPLY SCHEME , SM/11484 New Material Requisition To Resource Division RTOR000007/2023-2024 188/ALD 28/04/2023 Resource Division 18.72 0.00 0 0
11 ALIPURDUAR Kumargram Northern Mechanical Division II NEWLANDS TG AREA PIPED WATER SUPPLY SCHEME , SM/11484 New Quotation for new service connection at Newland TG P/H No-I. Application No- 4003039040 BILL/00020/2022-2023 BP-103/22-23 19/12/2022 WBSEDCL 1.58 0.00 0 0
12 ALIPURDUAR Kumargram Northern Mechanical Division II NEWLANDS TG AREA PIPED WATER SUPPLY SCHEME , SM/11484 New Quotation for new service connection at Newland TG P/H No-II. Application No- 4003039064 BILL/00021/2022-2023 BP-104/22-23 19/12/2022 WBSEDCL 1.58 0.00 0 0
13 ALIPURDUAR Kumargram Northern Mechanical Division II NEWLANDS TG AREA PIPED WATER SUPPLY SCHEME , SM/11484 New Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for New Land TG water supply scheme, TW no I in the district of Alipurduar under Northern Mechanical Division-II, PHE Dte. Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 1, Cooch-Behar Mechanical Sub-Division, ORD/000072/2023-2024 1254/NMD-II 04/07/2023 30 MALAY KUMAR SAHA 10.44 4.89 46.84 90
14 ALIPURDUAR Kumargram Northern Mechanical Division II NEWLANDS TG AREA PIPED WATER SUPPLY SCHEME , SM/11484 New Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for New Land TG water supply scheme, TW no II in the district of Alipurduar under Northern Mechanical Division-II PHE Dte. APD. Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 1, Cooch-Behar Mechanical Sub-Division, ORD/000865/2022-2023 664/NMD-II 24/03/2023 30 SARKAR ELECTRIC 10.46 9.54 91.2 90
Total 364.46 225.98 62