Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
18 377.02 176.14 46.72  
1 ALIPURDUAR Kumargram Alipurduar Division KUMARGRAM TG AREA PIPED WATER SUPPLY SCHEME , SM/11482 New Construction of 250cum. OHR for Kumargram TG Water Supply Scheme under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division Alipurduar Sub Division ORD/000139/2022-2023 976/ALD 15/07/2022 180 HARIDAS GHOSH 57.62 33.71 58.5 83
2 ALIPURDUAR Kumargram Alipurduar Division KUMARGRAM TG AREA PIPED WATER SUPPLY SCHEME , SM/11482 New Providing FHTC at Kumargram WSS under Alipurduar Division, PHE Dte. Part-3 Alipurduar Sadar Sub Division ORD/000146/2022-2023 1001/ALD 15/07/2022 30 DILIP MAHATO 5.04 0.00 0 0
3 ALIPURDUAR Kumargram Alipurduar Division KUMARGRAM TG AREA PIPED WATER SUPPLY SCHEME , SM/11482 New Construction of 150cum. OHR for KUMARGRAM ZONE-IV Water Supply Scheme under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division ORD/000147/2022-2023 983/ALD 15/07/2022 180 MATRI ENTERPRISE 50.41 0.00 0 0
4 ALIPURDUAR Kumargram Alipurduar Division KUMARGRAM TG AREA PIPED WATER SUPPLY SCHEME , SM/11482 New Providing House Connection (FHTC) at Kumargram WSS under Alipurduar Division, PHE Dte. Part-4 Alipurduar Sadar Sub Division Alipurduar Sub Division ORD/000148/2022-2023 1002/ALD 15/07/2022 30 DILIP MAHATO 5.04 0.00 0 43
5 ALIPURDUAR Kumargram Alipurduar Division KUMARGRAM TG AREA PIPED WATER SUPPLY SCHEME , SM/11482 New Providing House Connection (FHTC) at Kumargram WSS under Alipurduar Division, PHE Dte. Part-5 Alipurduar Sadar Sub Division Alipurduar Sub Division ORD/000150/2022-2023 1003/ALD 15/07/2022 30 DILIP MAHATO 5.04 0.00 0 42
6 ALIPURDUAR Kumargram Alipurduar Division KUMARGRAM TG AREA PIPED WATER SUPPLY SCHEME , SM/11482 New Soil investigation work at 4 different places of Kumargram within Alipurduar District under Alipurduar Division PHE Dte. Alipurduar Sadar Sub Division ORD/000156/2022-2023 1005/ALD 15/07/2022 30 MOYTEC 4.88 0.00 0 0
7 ALIPURDUAR Kumargram Alipurduar Division KUMARGRAM TG AREA PIPED WATER SUPPLY SCHEME , SM/11482 New Construction of Pump House, Boundary Wall, Tube well Boring by ODEX-165 Method of drilling at H/W site including laying distribution system and providing FHTC for KUMARGRAM TEA GARDEN AREA PWSS Under Alipurduar Division PHE DTE. Alipurduar Sadar Sub Division Alipurduar Sub Division ORD/000205/2022-2023 1304/ALD 22/08/2022 120 GOUTAM KUMAR DAS 94.63 57.55 60.82 80
8 ALIPURDUAR Kumargram Alipurduar Division KUMARGRAM TG AREA PIPED WATER SUPPLY SCHEME , SM/11482 New Construction of Pump House, Boundary Wall, Tube well Boring by ODEX-165 Method of drilling at 2nd site including laying distribution system , Rising main and providing FHTC for KUMARGRAM TEA GARDEN AREA PWSS Under Alipurduar Division PHE DTE. Alipurduar Sadar Sub Division Alipurduar Sub Division ORD/000210/2022-2023 1305/ALD 22/08/2022 720 HARIDAS GHOSH 81.11 60.75 74.9 90
9 ALIPURDUAR Kumargram Alipurduar Division KUMARGRAM TG AREA PIPED WATER SUPPLY SCHEME , SM/11482 New Supply of CIDF special for Kumargram TG Pwss Under Alipurduar Division PHE Dte. Alipurduar Sadar Sub Division Birpara Sub Division ORD/000239/2023-2024 1608/ALD 25/08/2023 30 HARI CONSTRUCTION 7.67 3.83 49.93 95
10 ALIPURDUAR Kumargram Alipurduar Division KUMARGRAM TG AREA PIPED WATER SUPPLY SCHEME , SM/11482 New Providing balance FHTC for KUMARGRAM TG PWSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division Alipurduar Sub Division ORD/000245/2023-2024 1791/ALD 29/08/2023 360 HARI CONSTRUCTION 13.16 2.66 20.21 81
11 ALIPURDUAR Kumargram Alipurduar Division KUMARGRAM TG AREA PIPED WATER SUPPLY SCHEME , SM/11482 New Land development, construction of pathway of HWS and culvert crossing with DI pipe under Kumargram TG WSS under Alipurduar Division, PHE Dte. Alipurduar Sadar Sub Division Alipurduar Sub Division ORD/000350/2022-2023 2492/ALD 13/12/2022 90 HARIDAS GHOSH 12.45 12.33 99.04 43
12 ALIPURDUAR Kumargram Alipurduar Division KUMARGRAM TG AREA PIPED WATER SUPPLY SCHEME , SM/11482 New Material Requisition To Resource Division RTOR000009/2023-2024 206/ALD/2023-2024 02/05/2023 Resource Division 5.44 0.00 0 0
13 ALIPURDUAR Kumargram Alipurduar Division KUMARGRAM TG AREA PIPED WATER SUPPLY SCHEME , SM/11482 New Material Requisition To Resource Division RTOR000106/2023-2024 130/ALD 10/01/2024 Resource Division 9.20 0.00 0 0
14 ALIPURDUAR Kumargram Northern Mechanical Division II KUMARGRAM TG AREA PIPED WATER SUPPLY SCHEME , SM/11482 New Quotation for new service connection at kumargram TG P/H No-I. Application No- 4003039105 BILL/00018/2022-2023 BP-108/22-23 19/12/2022 WBSEDCL 1.58 0.00 0 0
15 ALIPURDUAR Kumargram Northern Mechanical Division II KUMARGRAM TG AREA PIPED WATER SUPPLY SCHEME , SM/11482 New Quotation for new service connection at kumargram TG P/H No-II. Application No- 4003039118 BILL/00019/2022-2023 BP-107/22-23 19/12/2022 WBSEDCL 1.58 0.00 0 0
16 ALIPURDUAR Kumargram Northern Mechanical Division II KUMARGRAM TG AREA PIPED WATER SUPPLY SCHEME , SM/11482 New Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for Kumargram TG water supply scheme, TW no II under Northern Mechanical Division-II, PHE Dte.Alipurduar Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 1, Cooch-Behar Mechanical Sub-Division, ORD/000003/2023-2024 770/NMD-II 06/04/2023 30 BEE GEE CONSTRUCTION 10.74 5.31 49.44 90
17 ALIPURDUAR Kumargram Northern Mechanical Division II KUMARGRAM TG AREA PIPED WATER SUPPLY SCHEME , SM/11482 New Supply, installation, commissioning and trial operation of electro-mechanical components along with copper wound line voltage corrector for Kumargram TG water supply scheme, TW no I(H/W Site) under Northern Mechanical Division-II, PHE Dte.Alipurduar. ORD/000017/2023-2024 902/NMD-II 04/05/2023 30 MAA ENTERPRISES 10.74 0.00 0 0
18 ALIPURDUAR Kumargram Northern Mechanical Division II KUMARGRAM TG AREA PIPED WATER SUPPLY SCHEME , SM/11482 New Hiring of Motor Cab (Non-air conditioned) for site visit of the Assistant Engineer , Alipurduar Mechanical Sub- Division, P.H.E. Dte. for Inspection of different PWSS under JJM like Newland TG , Kumargram TG & Sankosh TG under Northern Mechanical Division -II, P.H.E. Dte. Assistant Engineer,Alipurduar Mechanical Sub-Division,P Junior Engineer 1, Cooch-Behar Mechanical Sub-Division, ORD/000914/2023-2024 139/AMSD 30/06/2023 60 MUSTAFI CONCERN 0.69 0.00 0 100
Total 377.02 176.14 46.72