Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
12 1,200.09 482.45 40.2  
1 PURBA MEDINIPUR Tamluk Division Different works for providing Functional Household Tap Connection (FHTC) by Augmentation of Tabakhali Water Supply Scheme. , SM/10683 Augmentation Payment to WBSEDCL for Electric Quotation money of Tabakhali Tube Well No. ¿ III BILL/00377/2023-2024 BP-2023-24-205 25/07/2023 WBSEDCL 0.56 0.00 0 0
2 PURBA MEDINIPUR Tamluk Division Different works for providing Functional Household Tap Connection (FHTC) by Augmentation of Tabakhali Water Supply Scheme. , SM/10683 Augmentation Way Leave permission from South Eastern Railway for Tabakhali PWSS for Application ID-SER-KGP-2023-WL-67 BILL/01828/2023-2024 BP-2023-24-822 22/01/2024 FA & CAO, S.E. RAILWAY, GRC. 6.17 0.00 0 0
3 PURBA MEDINIPUR Tamluk Division Different works for providing Functional Household Tap Connection (FHTC) by Augmentation of Tabakhali Water Supply Scheme. , SM/10683 Augmentation Preparation of D.P.R. for different works for providing Functional Household Tap Connection (FHTC) by Augmentation of Tabakhali Water Supply Scheme under Tamluk Division, PHE Dte. Assistant Engineer Junior Engineer ORD/000162/2021-2022 1166/TD 01/12/2021 7 HORIZEN 7.85 7.74 98.6 100
4 PURBA MEDINIPUR Tamluk Division Different works for providing Functional Household Tap Connection (FHTC) by Augmentation of Tabakhali Water Supply Scheme. , SM/10683 Augmentation Sinking of 3 (Three) nos. Tube Well at different sites. Name of Sites: i) Sinking of 300mm. x 200mm. dia. x 280 mtr. Deep Replacement Tube well by direct rotary rig method at 1st Tube well Site of Kapaseria W/S Scheme within Mahisadal Block under Haldia Sub-Division, of Tamluk Division P.H.E.Dte. Purba Medinipur. ii) Sinking of 300mm. x 200mm. dia. x 280 mtr. Deep Replacement Tube well by direct rotary rig method at Head work Site of Rajarampur W/S Scheme within Mahishadal Block under Haldia Sub-Division, of Tamluk Division P.H.E.Dte. Purba Medinipur. iii) Sinking of 300mm. x 200mm. dia. x 280 mtr. Deep Additional Tube well by direct rotary rig method at 3rd Tube well Site of Tabakhali W/S Scheme within Sutahata Block under Haldia Sub-Division, of Tamluk Division P.H.E.Dte. Purba Medinipur. Assistant Engineer Junior Engineer ORD/000235/2022-2023 976/TD 03/08/2022 21 SIMPLEX DRILLING COMPANY 58.06 19.26 33.17 100
5 PURBA MEDINIPUR Tamluk Division Different works for providing Functional Household Tap Connection (FHTC) by Augmentation of Tabakhali Water Supply Scheme. , SM/10683 Augmentation Construction of (3.60 Mtr. X 3.00 Mtr.) Switch Room cum Chlorine Room with water supply & sanitary arrangement (as per Deptt. drawing) at 3rd Tube Well site of Tabakhali Water Supply Scheme under Haldia Sub Division of Tamluk Division, PHE Dte. Purba Medinipur. Assistant Engineer Junior Engineer ORD/000341/2022-2023 1284/TD 12/09/2022 60 ELECTIVA ENTERPRISE 4.77 3.37 70.65 100
6 PURBA MEDINIPUR Tamluk Division Different works for providing Functional Household Tap Connection (FHTC) by Augmentation of Tabakhali Water Supply Scheme. , SM/10683 Augmentation Laying left out pipe line,Canal crossing & Rising main of ground water based Tabakhali Water Supply Scheme within Sutahata Dev. Block under Haldia Sub Division of Tamluk Division, PHE Dte. Purba Medinipur. Assistant Engineer Junior Engineer ORD/000365/2023-2024 933/TD 01/06/2023 40 RAJ KUMAR SINGHA 81.39 65.01 79.87 88
7 PURBA MEDINIPUR Tamluk Division Different works for providing Functional Household Tap Connection (FHTC) by Augmentation of Tabakhali Water Supply Scheme. , SM/10683 Augmentation Construction of boundary wall in 3rd tubewell site of Tabakhali W/S scheme under Haldia Sub-Division of Tamluk Division, P.H.E. Dte.(Length of Boundary wall-50mtr) Assistant Engineer Junior Engineer ORD/000395/2023-2024 1084/TD 08/06/2023 30 M/S SOURAV MAHAPATRA 5.91 1.50 25.38 100
8 PURBA MEDINIPUR Tamluk Division Different works for providing Functional Household Tap Connection (FHTC) by Augmentation of Tabakhali Water Supply Scheme. , SM/10683 Augmentation Laying of Distribution pipe line to accommodate FHTC with new construction of R.C.C. Elevated Reservoir of capacity 750 cum and staging height 20.00 mtr. as per Departmental Drawing with allied works including supply of all labour & materials for Augmentation of Ground Water Based Tabakhali Water Supply Scheme within Sutahata Dev. Block under Haldia sub-division of Tamluk Division, P.H.E.Dte, Purba Medinipur. Assistant Engineer Junior Engineer ORD/000416/2022-2023 1578/TD 14/10/2022 180 RAJ KUMAR SINGHA 709.93 326.47 45.99 55
9 PURBA MEDINIPUR Tamluk Division Different works for providing Functional Household Tap Connection (FHTC) by Augmentation of Tabakhali Water Supply Scheme. , SM/10683 Augmentation Jack Pushing of Railway Track Between BASULYA - BARADA Railway Station on Tamluk-Haldia Section of Kharagpur S.E. Railway Division of Purba Medinipur for Augmentation of Tabakhali Piped Water Supply Scheme of 150 mm Dia G.I. Casing Pipe and 125 mm Dia HDPE (PE-100) Carrier Pipe in between OHE MAST NO H50/11 & H50/13, H50/12 & H50/14 within Haldia Sub-Division under Tamluk Division, P.H.E DTE. (Total Length = 80 Mtr) Nodal Point J38 - J40. Assistant Engineer Junior Engineer ORD/000722/2023-2024 2944/TD 23/11/2023 20 KRISHNENDU SEKHAR DAS 72.62 59.10 81.38 100
10 PURBA MEDINIPUR Tamluk Division Different works for providing Functional Household Tap Connection (FHTC) by Augmentation of Tabakhali Water Supply Scheme. , SM/10683 Augmentation Material Requisition To Resource Division RTOR000022/2022-2023 410/TD 25/05/2022 Resource Division 205.42 0.00 0 0
11 PURBA MEDINIPUR Tamluk Division Different works for providing Functional Household Tap Connection (FHTC) by Augmentation of Tabakhali Water Supply Scheme. , SM/10683 Augmentation Material Requisition To Resource Division RTOR000087/2022-2023 1264/TD 12/09/2022 Resource Division 34.00 0.00 0 0
12 PURBA MEDINIPUR Midnapore Mechanical Different works for providing Functional Household Tap Connection (FHTC) by Augmentation of Tabakhali Water Supply Scheme. , SM/10683 Augmentation Providing and Installation of Submersible pumping machineries and other electromechanical equipments for Different works for providing Functional Household Tap Connection (FHTC) by Augmentation of Tabakhali Water Supply Scheme Block - Sutahata under JJM Program under MMD PHE Dte. Sri Srinath Ranjan Ghosh, AE/Haldia Electrical Sub-Divi Sri Tanmoy Shee, JE/Haldia Electrical Sub-Division. ORD/002024/2022-2023 862/W/MMD 27/03/2023 180 M/S B ENTERPRISE 13.41 0.00 0 70
Total 1,200.09 482.46 40.2