Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
46 742.36 286.06 38.53  
1 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Engagement of Implementation Support Agency (ISA) in the Kolaghat, Panskura, Sahid Matangini Block of Purba Medimipur district in connection with Jal Jeevan Mission. Assistant Engineer, Headquaters ORD/000549/2023-2024 1785-A/TD 03/08/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.72 100 100
2 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Engagement of Implementation Support Agency (ISA) in the Bhagwanpur -I , Bhagwanpur -II, Khejuri-I Block of Purba Medimipur district in connection with Jal Jeevan Mission. Assistant Engineer, Headquaters ORD/000550/2023-2024 1785-B/TD 03/08/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.72 100 100
3 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Engagement of Implementation Support Agency (ISA) in the Khejuri-II, Egra-I, Egra-II Block of Purba Medimipur district in connection with Jal Jeevan Mission. Assistant Engineer, Headquaters ORD/000551/2023-2024 1785-C/TD 03/08/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.72 100 100
4 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Engagement of Implementation Support Agency (ISA) in the Ramnagar-I, Ramnagar - II, Patashpur -I Block of Purba Medimipur district in connection with Jal Jeevan Mission. Assistant Engineer, Headquaters ORD/000552/2023-2024 1785-D/TD 03/08/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.72 100 100
5 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Engagement of Implementation Support Agency (ISA) in the Contai - I, Contai-II(Deshpran), Contai-III Block of Purba Medimipur district in connection with Jal Jeevan Mission. Assistant Engineer, Headquaters ORD/000553/2023-2024 1785-E/TD 03/08/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.72 100 100
6 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Engagement of Implementation Support Agency (ISA) in the Chandipur, Moyna, Nandakumar Block of Purba Medimipur district in connection with Jal Jeevan Mission. Assistant Engineer, Headquaters ORD/000554/2023-2024 1785-F/TD 03/08/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.72 100 100
7 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Engagement of Implementation Support Agency (ISA) in the Nandigram-I, Nandigram - II, Patashpur-II Block of Purba Medimipur district in connection with Jal Jeevan Mission. Assistant Engineer, Headquaters ORD/000555/2023-2024 1785-G/TD 03/08/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.72 100 100
8 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Engagement of Implementation Support Agency (ISA) in the Haldia, Mahishadal, Sutahata Block of Purba Medimipur district in connection with Jal Jeevan Mission. Assistant Engineer, Headquaters ORD/000556/2023-2024 1785-H/TD 03/08/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.72 100 100
9 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Engagement of Implementation Support Agency (ISA) in the Tamluk Block of Purba Medimipur district in connection with Jal Jeevan Mission. Assistant Engineer, Headquaters ORD/000557/2023-2024 1785-I/TD 03/08/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 3.39 3.39 100 100
10 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Continuation for Engagement of Implementation Support Agency (ISA) in the Kolaghat, Panskura, Sahid Matangini Block of Purba Medinipur district in connection with Jal Jeevan Mission for the period of 03/09/2023 to 02/10/2023 i.e. 01 month. Assistant Engineer, Headquaters ORD/000621/2023-2024 2176/TD 01/09/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.52 95.76 100
11 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Continuation for Engagement of Implementation Support Agency (ISA) in the Bhagwanpur -I , Bhagwanpur -II, Khejuri-I Block of Purba Medinipur district in connection with Jal Jeevan Mission for the period of 03/09/2023 to 02/10/2023 i.e. 01 month. Assistant Engineer, Headquaters ORD/000622/2023-2024 2177/TD 01/09/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.33 91.74 100
12 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Continuation for Engagement of Implementation Support Agency (ISA) in the Khejuri-II, Egra-I, Egra-II Block of Purba Medinipur district in connection with Jal Jeevan Mission for the period of 03/09/2023 to 02/10/2023 i.e. 01 month. Assistant Engineer, Headquaters ORD/000623/2023-2024 2178/TD 01/09/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.03 85.38 100
13 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Continuation for Engagement of Implementation Support Agency (ISA) in the Ramnagar-I, Ramnagar-II, Patashpur-I Block of Purba Medinipur district in connection with Jal Jeevan Mission for the period of 03/09/2023 to 02/10/2023 i.e. 01 month. Assistant Engineer, Headquaters ORD/000658/2023-2024 2179/TD 01/09/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.62 97.88 100
14 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Continuation for Engagement of Implementation Support Agency (ISA) in the Contai-I, Contai-II (Deshapran), Contai-III Block of Purba Medinipur district in connection with Jal Jeevan Mission for the period of 03/09/2023 to 02/10/2023 i.e. 01 month. Assistant Engineer, Headquaters ORD/000659/2023-2024 2180/TD 01/09/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.36 92.37 100
15 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Continuation for Engagement of Implementation Support Agency (ISA) in the Chandipur, Moyna, Nandakumar Block of Purba Medinipur district in connection with Jal Jeevan Mission for the period of 03/09/2023 to 02/10/2023 i.e. 01 month. Assistant Engineer, Headquaters ORD/000660/2023-2024 2181/TD 01/09/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.72 100 100
16 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Continuation for Engagement of Implementation Support Agency (ISA) in the Nandigram-I, Nandigram-II, Patashpur-II Block of Purba Medinipur district in connection with Jal Jeevan Mission for the period of 03/09/2023 to 02/10/2023 i.e. 01 month. Assistant Engineer, Headquaters ORD/000661/2023-2024 2181-A/TD 01/09/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.52 95.76 100
17 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Continuation for Engagement of Implementation Support Agency (ISA) in the Haldia, Mahishadal, Sutahata Block of Purba Medinipur district in connection with Jal Jeevan Mission for the period of 03/09/2023 to 02/10/2023 i.e. 01 month. Assistant Engineer, Headquaters ORD/000662/2023-2024 2182/TD 01/09/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.72 100 100
18 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Continuation for Engagement of Implementation Support Agency (ISA) in the Tamluk Block of Purba Medinipur district in connection with Jal Jeevan Mission for the period of 03/09/2023 to 02/10/2023 i.e. 01 month. Assistant Engineer, Headquaters ORD/000663/2023-2024 2182-A/TD 01/09/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 3.39 3.39 100 100
19 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Continuation for Engagement of Implementation Support Agency (ISA) in the Kolaghat, Panskura, Sahid Matangini Block of Purba Medinipur district in connection with Jal Jeevan Mission for the period of 03/10/2023 to 01/11/2023 i.e. 30 days. Assistant Engineer, Headquaters ORD/000667/2023-2024 2517/TD 29/09/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.72 100 100
20 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Continuation for Engagement of Implementation Support Agency (ISA) in the Bhagwanpur -I , Bhagwanpur -II, Khejuri-I Block of Purba Medinipur district in connection with Jal Jeevan Mission for the period of 03/10/2023 to 01/11/2023 i.e. 30 days. Assistant Engineer, Headquaters ORD/000668/2023-2024 2517-A/TD 29/09/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.72 100 100
21 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Continuation for Engagement of Implementation Support Agency (ISA) in the Khejuri-II, Egra-I, Egra-II Block of Purba Medinipur district in connection with Jal Jeevan Mission for the period of 03/10/2023 to 01/11/2023 i.e. 30 days. Assistant Engineer, Headquaters ORD/000669/2023-2024 2517-B/TD 29/09/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.72 100 100
22 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Continuation for Engagement of Implementation Support Agency (ISA) in the Ramnagar-I, Ramnagar-II, Patashpur-I Block of Purba Medinipur district in connection with Jal Jeevan Mission for the period of 03/10/2023 to 01/11/2023 i.e. 30 days Assistant Engineer, Headquaters ORD/000670/2023-2024 2517-C/TD 29/09/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.72 100 100
23 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Continuation for Engagement of Implementation Support Agency (ISA) in the Contai-I, Contai-II (Deshapran), Contai-III Block of Purba Medinipur district in connection with Jal Jeevan Mission for the period of 03/10/2023 to 01/11/2023 i.e. 30 days. Assistant Engineer, Headquaters ORD/000671/2023-2024 2517-D/TD 29/09/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.72 100 100
24 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Continuation for Engagement of Implementation Support Agency (ISA) in the Chandipur, Moyna, Nandakumar Block of Purba Medinipur district in connection with Jal Jeevan Mission for the period of 03/10/2023 to 01/11/2023 i.e. 30 days. Assistant Engineer, Headquaters ORD/000672/2023-2024 2518/TD 29/09/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 3.02 63.98 100
25 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Continuation for Engagement of Implementation Support Agency (ISA) in the Nandigram-I, Nandigram-II, Patashpur-II Block of Purba Medinipur district in connection with Jal Jeevan Mission for the period of 03/10/2023 to 01/11/2023 i.e. 30 days. Assistant Engineer, Headquaters ORD/000673/2023-2024 2518-A/TD 29/09/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.72 100 100
26 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Continuation for Engagement of Implementation Support Agency (ISA) in the Haldia, Mahishadal, Sutahata Block of Purba Medinipur district in connection with Jal Jeevan Mission for the period of 03/10/2023 to 01/11/2023 i.e. 30 days. Assistant Engineer, Headquaters ORD/000674/2023-2024 2518-B/TD 29/09/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.72 100 100
27 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Continuation for Engagement of Implementation Support Agency (ISA) in the Tamluk Block of Purba Medinipur district in connection with Jal Jeevan Mission for the period of 03/10/2023 to 01/11/2023 i.e. 30 days. Assistant Engineer, Headquaters ORD/000675/2023-2024 2518-C/TD 29/09/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 3.39 3.39 100 100
28 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Continuation for Engagement of Implementation Support Agency (ISA) in the Kolaghat, Panskura, Sahid Matangini Block of Purba Medinipur district in connection with Jal Jeevan Mission for the period of 02/11/2023 to 01/12/2023 i.e. 30 days. Assistant Engineer, Headquaters ORD/000684/2023-2024 2719/TD 31/10/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.72 100 100
29 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Continuation for Engagement of Implementation Support Agency (ISA) in the Bhagwanpur -I , Bhagwanpur -II, Khejuri-I Block of Purba Medinipur district in connection with Jal Jeevan Mission for the period of 02/11/2023 to 01/12/2023 i.e. 30 days. Assistant Engineer, Headquaters ORD/000685/2023-2024 2720/TD 31/10/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.72 100 100
30 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Continuation for Engagement of Implementation Support Agency (ISA) in the Khejuri-II, Egra-I, Egra-II Block of Purba Medinipur district in connection with Jal Jeevan Mission for the period of 02/11/2023 to 01/12/2023 i.e. 30 days. Assistant Engineer, Headquaters ORD/000687/2023-2024 2721/TD 31/10/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.72 100 100
31 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Continuation for Engagement of Implementation Support Agency (ISA) in the Ramnagar-I, Ramnagar-II, Patashpur-I Block of Purba Medinipur district in connection with Jal Jeevan Mission for the period of 02/11/2023 to 01/12/2023 i.e. 30 days Assistant Engineer, Headquaters ORD/000689/2023-2024 2722/TD 31/10/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.72 100 100
32 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Continuation for Engagement of Implementation Support Agency (ISA) in the Contai-I, Contai-II (Deshapran), Contai-III Block of Purba Medinipur district in connection with Jal Jeevan Mission for the period of 02/11/2023 to 01/12/2023 i.e. 30 days. Assistant Engineer, Headquaters ORD/000690/2023-2024 2723/TD 31/10/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 1.69 35.81 100
33 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Continuation for Engagement of Implementation Support Agency (ISA) in the Chandipur, Moyna, Nandakumar Block of Purba Medinipur district in connection with Jal Jeevan Mission for the period of 02/11/2023 to 01/12/2023 i.e. 30 days. Assistant Engineer, Headquaters ORD/000691/2023-2024 2724/TD 31/10/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.72 100 100
34 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Continuation for Engagement of Implementation Support Agency (ISA) in the Nandigram-I, Nandigram-II, Patashpur-II Block of Purba Medinipur district in connection with Jal Jeevan Mission for the period of 02/11/2023 to 01/12/2023 i.e. 30 days. Assistant Engineer, Headquaters ORD/000692/2023-2024 2725/TD 31/10/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.72 100 100
35 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Continuation for Engagement of Implementation Support Agency (ISA) in the Haldia, Mahishadal, Sutahata Block of Purba Medinipur district in connection with Jal Jeevan Mission for the period of 02/11/2023 to 01/12/2023 i.e. 30 days. Assistant Engineer, Headquaters ORD/000693/2023-2024 2726/TD 31/10/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.72 100 100
36 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Continuation for Engagement of Implementation Support Agency (ISA) in the Tamluk Block of Purba Medinipur district in connection with Jal Jeevan Mission for the period of 02/11/2023 to 01/12/2023 i.e. 30 days. Assistant Engineer, Headquaters ORD/000695/2023-2024 2727/TD 31/10/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 3.39 3.39 100 100
37 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Continuation for Engagement of Implementation Support Agency (ISA) in the Kolaghat, Panskura, Sahid Matangini Block of Purba Medinipur district in connection with Jal Jeevan Mission for the period of 02/12/2023 to 02/01/2024 i.e. 30 days. Assistant Engineer, Headquaters ORD/000758/2023-2024 2976/TD 29/11/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.72 100 100
38 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Continuation for Engagement of Implementation Support Agency (ISA) in the Bhagwanpur -I , Bhagwanpur -II, Khejuri-I Block of Purba Medinipur district in connection with Jal Jeevan Mission for the period of 02/12/2023 to 02/01/2024 i.e. 30 days. Assistant Engineer, Headquaters ORD/000759/2023-2024 2964/TD 28/11/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.72 100 100
39 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Continuation for Engagement of Implementation Support Agency (ISA) in the Khejuri-II, Egra-I, Egra-II Block of Purba Medinipur district in connection with Jal Jeevan Mission for the period of 02/12/2023 to 02/01/2024 i.e. 30 days. Assistant Engineer, Headquaters ORD/000760/2023-2024 2977/TD 29/11/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.72 100 100
40 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Continuation for Engagement of Implementation Support Agency (ISA) in the Ramnagar-I, Ramnagar-II, Patashpur-I Block of Purba Medinipur district in connection with Jal Jeevan Mission for the period of 02/12/2023 to 02/01/2024 i.e. 30 days Assistant Engineer, Headquaters ORD/000761/2023-2024 2965/TD 28/11/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.72 100 100
41 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Continuation for Engagement of Implementation Support Agency (ISA) in the Contai-I, Contai-II (Deshapran), Contai-III Block of Purba Medinipur district in connection with Jal Jeevan Mission for the period of 02/12/2023 to 02/01/2024 i.e. 30 days. Assistant Engineer, Headquaters ORD/000762/2023-2024 3027/TD 29/11/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 3.02 63.98 100
42 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Continuation for Engagement of Implementation Support Agency (ISA) in the Chandipur, Moyna, Nandakumar Block of Purba Medinipur district in connection with Jal Jeevan Mission for the period of 02/12/2023 to 02/01/2024 i.e. 30 days. Assistant Engineer, Headquaters ORD/000763/2023-2024 2951/TD 24/11/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.72 100 100
43 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Continuation for Engagement of Implementation Support Agency (ISA) in the Nandigram-I, Nandigram-II, Patashpur-II Block of Purba Medinipur district in connection with Jal Jeevan Mission for the period of 02/12/2023 to 02/01/2024 i.e. 30 days. Assistant Engineer, Headquaters ORD/000764/2023-2024 3028/TD 29/11/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.72 100 100
44 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Continuation for Engagement of Implementation Support Agency (ISA) in the Haldia, Mahishadal, Sutahata Block of Purba Medinipur district in connection with Jal Jeevan Mission for the period of 02/12/2023 to 02/01/2024 i.e. 30 days. Assistant Engineer, Headquaters ORD/000765/2023-2024 2952/TD 24/11/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 4.72 4.72 100 100
45 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Continuation for Engagement of Implementation Support Agency (ISA) in the Tamluk Block of Purba Medinipur district in connection with Jal Jeevan Mission for the period of 02/12/2023 to 02/01/2024 i.e. 30 days. Assistant Engineer, Headquaters ORD/000766/2023-2024 2934/TD 23/11/2023 30 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 3.39 3.39 100 100
46 PURBA MEDINIPUR Tamluk Division Engagement of Implementation Support Agency (ISA) for Implementation of Community Mobilization and Capacity Building Activities under JJM Support Activities at Purba Medinipur District. , SM/09022 Support-M&E Engagement of Implementation Support Agency (ISA) for implementation of community mobilization & capacity building support activities at Purba Medinipore district Under Jal Jeevan Mission (JJM) under Tamluk Division, PHE Dte. (For 12 months) Assistant Engineer Junior Engineer ORD/000833/2023-2024 3327/TD 27/12/2023 360 HARISHCHANDRAPUR PALLY UNNAYAN SAMITY 536.61 88.68 16.53 50
Total 742.30 286.03 38.53