Work Order Tracking
Status Report on the Progress and Achievement at Individual Work Order Level

Rs. in Lakh
Sl No. District
As per Census (2011)
Block
As per Census (2011)
Division
Working Divisions
Scheme
Schemes for which Work Order has been issued as per PHED-MIS
Scheme Category
Category of Scheme as per PHED-MIS
Work Name
Name of the Work as per the Issued Work Order
Name of AE entrusted Name of JE entrusted System Order No.
System Order Number
WO Number
Manual No. Provided by the Divisions as per PHED-MIS
WO Date
Date of Issuance of Work Order
Days of Completion
Target Days for Work Completion as per PHED-MIS
Agency Name
Agency Appointed Against this Work Order as per PHED-MIS
Work Value
Value of Work as mentioned in the Work Order as per PHED-MIS
Payment
Amount of Payment made for this Work Order as per PHED-MIS
Payment %
Percentage of Payment made for this Work Order as per PHED-MIS
Physical Progress %
Achievement of Physical Progress of the work under this Work Order as per PHED-MIS
5 58.07 50.83 87.53  
1 PASCHIM MEDINIPUR Midnapore Division Retrofitting of Ukhla Piped Water Supply Scheme to accommodate all FHTC. , SM/08211 Retrofitting Preparation of D.P.R (Consultancy work) in connection with the Functional House Hold Connection of different existing PWSS (Ukhla, Block - Garhbeta-II) to be Retrofitting under Midnapore Division P.H.E. Dte. AE Sadar Sub-division JE RWS Sadar Sub-Division(Garbeta-II) ORD/000562/2020-2021 56/MD 08/01/2021 10 SIRCON ENGINEERING SERVICES 2.49 2.39 95.98 0
2 PASCHIM MEDINIPUR Midnapore Division Retrofitting of Ukhla Piped Water Supply Scheme to accommodate all FHTC. , SM/08211 Retrofitting Sinking of 1 (One) No. Replacement tube well including allied works for Retrofitting of Ground Water Based Ukhla PWSS to accommodate FHTC under JJM under Garhbeta -II block in Paschim Medinipur District under Midnapore Division, P.H.E. Dte. AE Sadar Sub-division JE1 Sadar Sub-division ORD/000683/2021-2022 282/MD 15/02/2022 60 GOUTAM RAY 43.53 38.95 89.48 0
3 PASCHIM MEDINIPUR Midnapore Division Retrofitting of Ukhla Piped Water Supply Scheme to accommodate all FHTC. , SM/08211 Retrofitting Retrofitting to accommodate FHTC under JJM at Mouza Ukhla Purba Para in Ukhla PWSS in Garhbeta II Block in the District of Paschim Medinipore.(SL No-10) AE Sadar Sub-division JE1 Sadar Sub-division ORD/000746/2020-2021 106/AE/MSSD 26/02/2021 15 AJIJUR RAHAMAN MALLICK 4.83 4.67 96.69 10
4 PASCHIM MEDINIPUR Midnapore Division Retrofitting of Ukhla Piped Water Supply Scheme to accommodate all FHTC. , SM/08211 Retrofitting Retrofitting to accommodate FHTC under JJM at Mouza Ukhla Paschim Para in Ukhla PWSS (Part-B) in Garhbeta II Block in the District of Paschim Medinipore.(SL.NO-11) AE Sadar Sub-division JE1 Sadar Sub-division ORD/000752/2020-2021 107/AE/MSSD 26/02/2021 15 AJIJUR RAHAMAN MALLICK 4.83 4.82 99.79 0
5 PASCHIM MEDINIPUR Midnapore Division Retrofitting of Ukhla Piped Water Supply Scheme to accommodate all FHTC. , SM/08211 Retrofitting Preparation of DPR in connection with the Functional House Hold connection of different existing PWSS to Retrofitting under Midnapore Division, PHE Dte. VCH/001115/2020-2021 null 19/03/2021 SIRCON ENGINEERING SERVICES 2.39 0.00 0 0
Total 58.07 50.83 87.54